| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC agreement executed | |
| 2 | L2₹3.5 L+₹39,479.04 (12.7%)Rejected-Finance | L2 | Rejected-Finance DUE TO L2 | |
| 3 | L3₹3.6 L+₹47,505.47 (15.3%)Rejected-Finance | L3 | Rejected-Finance DUE TO L3 |
Tender Value
₹4.2 L
EMD Value
₹10,470
Closing Date
6 Dec 2023, 5:00 pmClosed
Assistant Executive Engineer
Office of Assistant Executive Engineer Irrigation Sub Division No III, Chittur Chittur College P O 678104
CPP Nurnee System Non plan 2023 24 Rectification of Nurnee main canal near ch. 10/100 km
2023_Irrig_619780_2
IRR/PI/TR/5095/2023_5_7_6/1
Open Tender
Civil Works - Canal
Item Rate
270 days
CHITTUR
Please refer Tender documents.
6 documents required · 6 mandatory
₹925
Yes
₹10,470
Yes
6 Jan 2024
28 Nov 2023
8 Dec 2023
28 Nov 2023
6 Dec 2023
28 Nov 2023
Amount
Rectification of Nurnee main canal near ch. 10/100km
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
jollyjoseph
SAJEESH V
Bidder Name
jollyjoseph
manoj.k
SAJEESH V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_944544.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .