| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance HOUSE NO F 452 3 LINE NO 09 RAJENDER NAGAR ROORKEE | HARIDWAR | UTTARAKHAND | 247656 | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 LAdmitted-Finance BHIKYASEN ALMORA | ₹5.6 L | L2 | Admitted-Finance |
| 3 | L3₹5.7 LAdmitted-Finance LOCATION UTTARAKHAND UT | ₹5.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI SAI ENTERPRISES L2 | AJAY KUMAR CHAUHAN L3 | Shri Ganesh Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of Top Channel Clamp for SP-23 with N&B | 36 | Nos | 200 ₹7,200 | 200 ₹7,200 | 199 ₹7,164 |
| 2.00 | Supply of Bracing Set Clamp for SP-23 with N&B | 16 | Nos | 250 ₹4,000 | 249.7 ₹3,995.20 | 249 ₹3,984 |
| 3.00 | Supply of Bracing Set Clamp for SP-23 with N&B | 16 | Nos | 290 ₹4,640 | 274.5 ₹4,392 | 274 ₹4,384 |
| 4.00 | Supply of Stay Clamp S/E SP-23 with N&B | 10 | Nos | 251 ₹2,510 | 249.7 ₹2,497 | 249 ₹2,490 |
| 5.00 | Supply of HT Stay Insulator | 18 | Nos | 150 ₹2,700 | 149.2 ₹2,685.60 | 149 ₹2,682 |
| 6.00 | Supply of Stay Clamp D/E SP-23 with N&B | 16 | Nos | 310 ₹4,960 | 310 ₹4,960 | 300 ₹4,800 |
| 7.00 | Supply of Earth wire Clamp SP-23 with N&B | 10 | Nos | 280 ₹2,800 | 275 ₹2,750 | 274 ₹2,740 |
| 8.00 | Supply of LT Shackle insulator with N&B | 40 | Nos | 100 ₹4,000 | 100 ₹4,000 | 99 ₹3,960 |
| 9.00 | Supply of LT Stay Insulator | 10 | Nos | 41 ₹410 | 42 ₹420 | 39 ₹390 |
| 10.00 | Supply of J Hook Clamp for AB Cable | 10 | Nos | 200 ₹2,000 | 200 ₹2,000 | 198 ₹1,980 |
Tender Value
₹5.7 L
EMD Value
₹23,000
Closing Date
18 Nov 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer EDD UPCL Almora
Supply And Construction of HT, L/T and TF for Giving Service Connection in EDSD I Almora Under UERC Head 2025-26
2025_UPCL9_88550_1
14/2025-26/EDD(A)
Open Tender
Electrical Works
90 days
Almora
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer EDD UPCL
₹23,000
24 Dec 2025
31 Oct 2025
19 Nov 2025
31 Oct 2025
18 Nov 2025
31 Oct 2025
Amount
Supply of Top Channel Clamp for SP-23 with N&B
Supply of Bracing Set Clamp for SP-23 with N&B
Supply of Bracing Set Clamp for SP-23 with N&B
Supply of Stay Clamp S/E SP-23 with N&B
Supply of HT Stay Insulator
Supply of Stay Clamp D/E SP-23 with N&B
Supply of Earth wire Clamp SP-23 with N&B
Supply of LT Shackle insulator with N&B
Supply of LT Stay Insulator
Supply of J Hook Clamp for AB Cable
Supply of Suspension Clamp for AB Cable
Supply of LT Clamp for SP-10 with N&B
Supply of LT Clamp for SP-21 with N&B
Supply of LT Stay Clamp for SP-10 with N&B
Supply of LT Stay Clamp for SP-21 with N&B
Supply of LT Earth Clamp for SP-10 with N&B
Supply of LT Earth Clamp for SP-21 with N&B
Supply of Holding Clamp for SP-23 with N&B
Supply of Nut & Bolts size 65*16mm
B- TRANSMISSION- Cartage SP-21/23 Pole, 20-50 Km
Cartage of Petty Material, 20-50 Km
Headload Cartage SP-21/23 pole (1-3 Km)
Headload Cartage of Material (1-3 Km)
Excavation of Pit for Pole size 0.9x0.6x1/6x8.5 Mtr SP-23 Pole
Erection of Sp-23 double Pole
Erection of Sp-23 Single Pole
Grouting of pole size 0.45x0.45x1/9 of SP-23 pole
Muffing of Pole
Erection of 11KV Stay Set
Grouting of Stay set size 0.6x0.6x0.3
Laying of Weasel conductor in HT Line
Gurading of LT/11 KV Line
T-off Connection complete 11 KV Line
Lopping & Chopping of tree branches
Fabrication of Steel
D- DISTRIBUTION- Cartage SP-21/23 Pole, 20-50 Km
Cartage of SP-10 Pole, 20-50 Km
Cartage of petty material, 20-50 Km
Headload Cartage SP-21/23 pole (1-3 Km)
Headload Cartage SP-10 pole (1-3 Km)
Headload Cartage of material (1-3 Km)
Excavation of Pit for Pole size 0.9x0.6x1/6x8.5 Mtr SP-21 Pole
Excavation of Pit for Pole size 0.9x0.6x1/6x8 Mtr SP-10 Pole
Excavation of Pit for Stay size 0.6x0.6x1.2 Cumtr
Erection of Single SP-21 Pole
Erection of Single SP-10 Pole
Grouting of pole size 0.45x0.45x1/9 of SP-21 pole
Grouting of pole size 0.45x0.45x1/9 of SP-10 pole
Muffing of Pole
Erection of LT Stay Set
Grouting of Stay set size 0.6x0.6x0.3
Erection of Earthing Rod
Laying of 3P 4WLT Line (Weasel)
Laying of 1P 2WLT Line (Weasel)
Laying AB Cable 1 Phase LT Line
Laying AB Cable 3 Phase LT Line
C- TRANSFORMATION Cartage of 16/25 KVA DTR, 51-70 KM
Cartage of 63 KVA DTR, 51-70 KM
Cartage of 100 KVA DTR, 51-70 KM
Cartage of Peety Material 51-70 Km
Headload Cartage of 25 KVA DTR (1-3Km)
Headload Cartage of 63 KVA DTR (1-3Km)
Headload Cartage of 100 KVA DTR (1-3Km)
Headload Cartage of Material (1-3 Km)
Fixing of TPMP
Fixing of Lightning Arrestor
Inst. Of 25 KVA DTR on Plinth
Inst. Of 63 KVA DTR on Plinth
Inst. Of 100 KVA DTR on Plinth
Laying of LT PVC Cables (>150 Sqmm)
Fabrication of Steel
SHRI SAI ENTERPRISES (BID ID -406176)
AJAY KUMAR CHAUHAN (BID ID -406353)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TENDERDOCUMENT202526.pdf
Tender Documents • 7.06 MB
BOQ_105052.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid