Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-Finance | ₹24.9 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹26.4 LRejected-Finance | ₹26.4 L | L2 | Rejected-Finance Higher quoted amount compared to L1 |
| 3 | L3₹27.9 LRejected-Finance | ₹27.9 L | L3 | Rejected-Finance Higher quoted amount compared to L1 |
| 4 | L4₹29.0 LRejected-Finance | ₹29.0 L | L4 | Rejected-Finance Higher quoted amount compared to L1 |
| Sl No | Description | Qty | Unit | M/S TIRUPATI GOROBA SHENDGE L2 | LAKSHDEEP ASSOCIATES L4 | SHRI SAMARTH FABRICATION LLP L3 | UNICON L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of concrete (un-reinforced) in ground floors, etc. in any position any description | 10 | Cum | 800 ₹8,000 | 1,586 ₹15,860 | 1,614.02 ₹16,140.20 | 800 ₹8,000 |
| 2.00 | Removing building material to distance 1Km beyond the lead included in the rates, including loading, unloading & stacking at the destination | 20 | Load | 1,400 ₹28,000 | 269 ₹5,380 | 273.78 ₹5,475.60 | 250 ₹5,000 |
| 3.00 | Excavating in trenches n exc 1.5 m wide and 1.5 m deep for foundation and getting out in hard /dense soil | 35 | Cum | 750 ₹26,250 | 776.25 ₹27,168.75 | 789.75 ₹27,641.25 | 650 ₹22,750 |
| 4.00 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point | 35 | Cum | 300 ₹10,500 | 368 ₹12,880 | 374.4 ₹13,104 | 325 ₹11,375 |
| 5.00 | Soling (or sub base) 200mm thk with broken boulders or quarried stone, inter stices filled, surface formed and rolled and consolidated to required gradient and camber | 25 | Sqm | 400 ₹10,000 | 425.5 ₹10,637.50 | 432.21 ₹10,805.25 | 390 ₹9,750 |
| 6.00 | Moorum/red bajri filling in floors or pavings, laid in layers n exc. 15cm thk, spread, levelled & rammed including watering | 3 | Cum | 1,100 ₹3,300 | 1,426 ₹4,278 | 1,450.92 ₹4,352.76 | 1,325 ₹3,975 |
| 7.00 | M & L for 100 mm thk plain cement concrete type D2, 1:4:8 mix, using 40 mm graded aggregates, in sub-floors, floors, paving including shuttering etc. | 4 | Cum | 5,000 ₹20,000 | 6,305.45 ₹25,221.80 | 6,415.23 ₹25,660.92 | 6,000 ₹24,000 |
| 8.00 | M & L for providing cement concrete type B2 1:2:4 mix (40mm graded aggregate) in foundations, filling and mass concrete. | 20 | Cum | 6,000 ₹1.2 L | 7,448.55 ₹1.5 L | 7,579.03 ₹1.5 L | 7,000 ₹1.4 L |
| 9.00 | M & L Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter | 60 | Sqm | 300 ₹18,000 | 3,645.55 ₹2.2 L | 370.56 ₹22,233.60 | 280 ₹16,800 |
| 10.00 | S & F of Mild steel rag or lewis bolts of 25mm dia, screwed one end, with hexagonal or square nuts and washers, the other end enlarged and jagged or lewised but length of bolt exc 30cm long | 750 | Kg | 130 ₹97,500 | 106 ₹79,500 | 170.18 ₹1.3 L | 110 ₹82,500 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹55,030
Closing Date
12 Nov 2025, 3:30 pmClosed
UJJWAL KANT, DGM
HIGH EXPLOSIVES FACTORY KHADKI PUNE
Construction of steel shed around Bldg no 36 F and G section at HEF
2025_MIL_251168_2
HEF/EO/DC/EPRC/RD2503/25-26
Open Tender
Civil Works
180 days
HIGH EXPLOSIVES FACTORY KHADKI PUNE
4 documents required · 4 mandatory
₹0
₹55,030
12 Feb 2026
27 Oct 2025
13 Nov 2025
27 Oct 2025
12 Nov 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
RevisedTenderDocumentBldgno36Shed.pdf
Tender Documents • 4.81 MB
RevisedNITforbldgno36shed.pdf
Other Document • 0.67 MB
BOQ_291506.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid