| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹6.9 LAccepted-AOC PWD S CONTRACTOR KUNHALINKIL HOUSE MARKET ROAD NILESHWAR | ₹6.9 L | LI | Accepted-AOC L1 |
| 2 | L2₹7.4 LRejected-AOC | ₹7.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹7.6 LRejected-AOC | ₹7.6 L | L3 | Rejected-AOC L3 |
| 4 | L4₹7.6 LRejected-AOC | ₹7.6 L | L4 | Rejected-AOC L4 |
| 5 | L5₹7.7 LRejected-AOC | ₹7.7 L | L5 | Rejected-AOC L5 |
Tender Value
₹8.8 L
EMD Value
₹13,151
Closing Date
18 Aug 2021, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Building Sub Division, kanhangadKanhangad
GENERAL - PWD Rest House -Kanhangad- Construction of compound wall- Construction of compound wall- General Civil Work
2021_PWD_434324_1
PWD/BLDG/2646/2021-2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kanhangad
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,935
Yes
₹13,151
Yes
5 Oct 2021
10 Aug 2021
26 Aug 2021
10 Aug 2021
18 Aug 2021
10 Aug 2021
Amount
construction of compound wall
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
OD11232/2021-2022:Null random rubble masonry using departmental hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement:6 coarse sand:12 graded stone aggregate 20 mm nominal size)up to plinth level with cement mortar 1:6(1 cement:6 coarse sand)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD27048/2021-2022:Laterate masonry with neatly dressed laterate stone of size30x20x20cm or nearest size in cement mortar 1:6 for superstructure above plinth level up to floor two level including all cost of materials, labour charges etc.
OD11234/2021-2022:Null laterite masonry with departmental laterate stone of size30x20x20cm or nearest size in cement mortar 1:6 for superstructure above plinth level up to floor two level including all cost of materials, labour charges etc.
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
16.19:Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved
Demolishing of compound wall
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
SREEJITH A
muhammed shafi A.B
ADUKATH VEETIL SREEDHARAN
B.M ABDUL KHADER
safwan c
MANZOOR KUNHAMOO
S K KUNHI KOYA THANGAL
UDMA LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
SREEJITH A
UDMA LABOUR CONTRACT CO-OPERATIVE SOCIETY
SHAMEER A
safwan c
MANZOOR KUNHAMOO
ADUKATH VEETIL SREEDHARAN
muhammed shafi A.B
B.M ABDUL KHADER
S K KUNHI KOYA THANGAL
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_617102.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .