Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance SHEESHMAHAL KATHGODAM ALMORA | Admitted-Finance |
| 3 | Admitted-Finance BHIKIYASAIN ALMORA | BHIKIYASAIN | ALMORA | UTTARAKHAND | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical GROUND FLOOR 2 404 AVAS VIKAS BUDHI VIHAR DELHI ROAD MORADABAD U P 244001 | MORADABAD | MORADABAD | UTTAR PRADESH | 244001 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹22 L
EMD Value
₹66,000
Closing Date
1 Nov 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer Electricity Distribution Circle Ranikhet
Replacement of 66 KV Almora-Pithoragarh line from Almora to Danya and 33 KV double circuit 33/11 KV S/s Toli and Danya under EDD Almora
2021_UPCL9_36910_1
EDC(R)-15/2021-22
Open Tender
Electrical Works
Item Wise
120 days
Almora
As per Tender Document
2 documents required · 2 mandatory
₹1,180
Executive Engineer
₹66,000
Yes
3 Dec 2021
29 Sept 2021
2 Nov 2021
1 Oct 2021
1 Nov 2021
1 Oct 2021
120 days
Amount
LABOUR CHARGE (66 KV line repairing)
Cartage of Material from ESC Almora to road side various places, Including Loading & Un-loading both End. Distance 60 Km
Head load cartage of following materials from Dump store to work site,avrage distance 2 Km
Small materials
Opening of Jumpers from one side at various tower locations including all T&P Labour at 66 KV Almora Pithoragarh Line.
Opening of Broken conductor from one side and laying down to ground with disc fitting from cross arm at various tower locations including all T&P Labour etc at 66 KV Almora Pithoragarh Line.
Erection of Dog Conductor at various tower locations including all T&P Labour at 66 KV Almora Pithoragarh Line.
Erection of Earth Wire at various tower locations including all T&P Labour at 66 KV Almora Pithoragarh Line.
Tightning of Jumpers at various tower locations of including all T&P Labour at 66 KV Almora Pithoragarh Line.
Root clearence of 66 Kv line by looping chooping of tree branches which are touched or fallon on line.
Megaring/Charging of 33 line complete in all respect upto energing.
LABOUR CHARGE (Resource for connect 33/11 KV S/s)
Cartage of Material from ESC Almora to road side dump store Including Loading & Un-loading both End. Distance 65 Km
ST Pole SP-33
Other small materials
Head load cartage of following materials from Dump store to pitsite ava. Lead distance 0.5 Km
ST Pole SP-33
Other small materials
Excavation of earth for pole pit of size 0.9x0.6x(1/6 of full length of pole) = 0.81 cum each pole for erection of pole in all type of soil including proper dressing of side and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
Erection of following double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X bracing and clamps as per RESPO construction Manual.
Erection of following Four pole in proper level and alignment alongwith fixing of all accessories, like top channel, X bracing and clamps as per RESPO construction Manual.
Grouting of pole in size 0.45x0.45x(1/9 of full length of pole) = 0.19 cum each poleof the support in CC ratio 1:4:8 (1 cement: 4graded stone 20mm nominal size : 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual, (10 No. poles).
Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block 45cm height from ground level including cost of cement, stone and sand etc.
Fabrication of MS channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing.
Excavation of earth for stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of side and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. (21Nos stay).
Fixing, tightening and nozzaling of stay with pole and stay rod on required tension as per PESPO norms
Grouting of stay 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement: 4 graded stone 20mm nominal size : 8 coares sand) block including cost of cement, sand and stoneballast back filling of soil and bolders in pit and ramming, and proper alignment, leveling as per RESPO norms. (21Nos stay).
Earthing of support with M.S. earth rod of 2.5 meter long by hammaring of M.S. rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual.
Laying, spreading, Stringing and sagging of 33KV line in 3Phase of dog conductor as phase wire complete including fixing of all accessories in 3 No. conductor in parallel with binding and jumpering as per profile and sagging chart.
T-off connections complete 33 KV.
Guarding below 33 KV line by sagging, stringing of guard wire (2No.), Earth wire 7/16 wire, binding of cross wire with GI wire No. 6 SWG at a distence 2 Mtr. Between two cross wire complete cutting binding & nozzling etc including fixing of guarding angle complete in all respect.
Providing and fixing of danger Board complete by providing clamps of MS Flat 50x6mm and nuts & bolts, Danger Boards of MS Sheet 2 mm thick 11''x7'' size (including cost of all material).
Labour COST OF EARTH MAT & DELTA EARTHING OF 33/11 KV SUB-STATION DANYA and Toli AS PER Schedule No.-1 ENCLOSED.
Labour COST OF TERMINAL GANTRY WITH LA AT 33/11 KV SUB-STATION DANYA and Toli AS PER Schedule No.-2 ENCLOSED.
Labour COST OF ONE SET OF LINE ISOLATOR AT 33/11 KV SUB-STATION DANYA and Toli AS PER Schedule No.-3 ENCLOSED.
Labour COST OF ONE SET OF BUS ISOLATOR AT 33/11 KV SUB-STATION DANYA and Toli AS PER Schedule No.-4 ENCLOSED.
Erection Work (Earth Mat & Delta Earthing of 33/11 KV S/S Danya and Toli)
Excavation of earth
Straightening and laying of Earth mat of 32 mm M S round 0.6 mtr deep in mixed soil according to drawing or as per UPCL direction or/and as per site requirement. Making T-joints, cross joint and Lap joints by welding of M S round bar together using cleats of MS Angles 65x65x6 mm, chipping the slag and painting of the joints with black bitumen paint (including supply of paint) to avoid rusting. Cutting & making electrode 2.5 mtr long with conical pointed bottom and driving of the electrode remains 450 mm below ground level. Backfilling of soil in trenches, ramming and leveling of trench properly after completion of eartmat and earthing work is complete. Making of Delta/Bridge earthing for structure/panels i.e. LA, 11 KV panels, ACDB, DCDB, Neutral of power & station transformer.
Earthing of structures using G.I. strips including strengthening, cutting, bending & welding with structure and equipments.
Special earthing by treatment of soil with highly conducted material like combination of bentonite, conductive cement, coke dust, sodium carbonate, MgSo4, NaCl & CaCl2 as per ISS 3043-1987 as per annexure -A (including cost of all material & labor)
Earthfilling in yard
Erection work (Terminal Gantry with LA at 33/11 KV S/s Danya and Toli)
Fabrication of T.G. Structure complete as per approved drawing.
Excavation of earth in mixed soil for foundation
Cement concreating in 1:3:6
Cement Plaster 1:4, on top & side walls
Erection of T.G. with LA
Painting of structure with one coat of red oxide paint and two coat of Aluminium paint of best quality I.S.I. mark Dulux, Burger, Asian make including cost of red oxide, paint.
Erection work (One Set of Line/Bus Isolator at 33/11 KV S/s Danya and Toli)
Fabrication charges of structure as per approved drawing
Excavation of earth in mixed soil
Cement concreting in 1:3:6 ratio
Cement Plaster 1:4, on top & side walls
Erection charges of isolator structure
Erection charges of line isolator complete by assembeling, fixing of operating handle, pins etc for smooth operation of the isolator.
Painting of structure with one coat of red oxide paint and two coat of Aluminium paint of best quality I.S.I. mark Dulux, Burger, Asian make including cost of red oxide, paint.
SHRI SAI ENTERPRISES
BALAM SINGH MEHRA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .