Loading…
Loading…
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
30 Apr 2026, 6:00 pmClosed
CWE (AF) BAREILLY
HQ Commander Works Engineers (AF) Military Engineer Services Bareilly 243002
As described in BOQ
2026_MES_758553_1
81618/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) BAREILLY
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) BAREILLY
₹88,000
30 Mar 2026
30 Mar 2026
9 May 2026
30 Mar 2026
30 Apr 2026
18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 70 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | - | Each Job | - | - |
| - | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 125 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | - | Each Job | - | - |
| - | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 60 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | - | Each Job | - | - |
| - | Supply fixing installation and testing complete a new Cooling Tower of Capacity 50 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | - | Each Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_849623.xls
BOQ • 0.36 MB
81618TENDERFINAL.pdf
Tender Documents • 1.62 MB
81618tenderCorri13Apr.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .