Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance LOCATION UTTARAKHAND UT | ₹6.0 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹6.0 LRejected-Finance | ₹6.0 L | L2 | Rejected-Finance Second lowest bidder |
| 3 | L3₹6.0 LRejected-Finance | ₹6.0 L | L3 | Rejected-Finance Third lowest bidder |
| Sl No | Description | Qty | Unit | Hari Om Sai Electricals L2 | AJAY KUMAR CHAUHAN L1 | JAI LAKSHMI ASSOCIATE L3 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY | ||||||
| 2.00 | LT clamp with N&B ST pole SP-21 | 153 | Nos | 195 ₹29,835 | 194 ₹29,682 | 195.5 ₹29,911.50 |
| 3.00 | Stay clamp for SP-21 with N&B | 39 | Nos | 205 ₹7,995 | 205 ₹7,995 | 205.5 ₹8,014.50 |
| 4.00 | Shackle insulator 75x90mm with N&B | 153 | Nos | 60 ₹9,180 | 59.5 ₹9,103.50 | 60.5 ₹9,256.50 |
| 5.00 | Stay insulator | 39 | Nos | 24 ₹936 | 24 ₹936 | 25 ₹975 |
| 6.00LABOUR CHARGE | ||||||
| 7.00 | Excavation of pit for Stay set | 17 | CBM | 250 ₹4,250 | 250 ₹4,250 | 251 ₹4,267 |
| 8.00 | Errection of LT stay set | 39 | Nos | 450 ₹17,550 | 449 ₹17,511 | 450 ₹17,550 |
| 9.00 | Grouting of stay set | 4 | CBM | 4,800 ₹19,200 | 4,800 ₹19,200 | 4,800.5 ₹19,202 |
| 10.00 | excavation of pit for pole | 59 | CBM | 250 ₹14,750 | 249 ₹14,691 | 250 ₹14,750 |
Tender Value
₹6 L
EMD Value
₹18,000
Closing Date
16 Aug 2024, 4:00 pmClosed
EE
EDD,Ranikhet
Replacement of damaged poles under Chaukhutia section under EDSD,Dwarahat
2024_UPCL9_74173_1
EDD(R)05/2024-25
Open Tender
Electrical Works
60 days
Chaukhutia
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE,EDD,Ranikhet
₹18,000
6 Jun 2026
3 Aug 2024
17 Aug 2024
3 Aug 2024
16 Aug 2024
3 Aug 2024
Amount
SUPPLY
LT clamp with N&B ST pole SP-21
Stay clamp for SP-21 with N&B
Shackle insulator 75x90mm with N&B
Stay insulator
LABOUR CHARGE
Excavation of pit for Stay set
Errection of LT stay set
Grouting of stay set
excavation of pit for pole
Errection of single SP-21 pole
Grouting of pole
Muffing of poles
Dismantling of SP21/23 single pole
Laying of 2P 3W LT line (weasel)
Cartage of SP-21/23 pole, 100-150 km
Cartage of petty material 100-150 km
Cartage of petty material 150-200 km
Headload cartage SP-21/23 pole (1-3 km)
Headload Cartage of Material (1-3 km)
Disconnection and reconnection of consumer
Hari Om Sai Electricals
JAI LAKSHMI ASSOCIATE
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid