| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L Quoted ₹4.9 L | L1 | Accepted-AOC AOC |
| 2 | L2₹5.0 L+₹11,352.40 (2.31%)Rejected-Finance | ₹5.0 L+₹11,352.40 (2.31%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.1 L+₹21,286.80 (4.33%)Rejected-Finance VILLAGE THALEEN P O TANDI TEHSIL NIRMAND DISTRICT KULLU HP | KULLU | HIMACHAL PRADESH | 172002 | ₹5.1 L+₹21,286.80 (4.33%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical VILLAGE KHADED P O CHOWAI TEHSIL ANNI DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MUKESH SHARMA L1 | RAHUL SHARMA L2 | SANYOG KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of each work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/ hard rock, where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting, planking, timbering and dewatering where ever required. Stacking usable and unusable material/ soil separately and after laying, jointing and testing of pipes, returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads and lifts as per direction of Engineer-in-Charge. Pick & Jumper work | 102.24 | Cum | 390 ₹39,873.6 Lowest | 400 ₹40,896 | 460 ₹47,030.4 |
| 2.00 | Laying, jointing and testing in trenches to be levelled to grades, GI flanged pipes of following diameter confirming to IS:1239-1990( Part-II) having minimum wall thickness as per IS code and class of pipes specified below, The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) welded at both ends according to relevant BIS standards and detailed specifications i/c provision of nut & bolts of required sizes, 3mm thick compressed asbestos fiber jointing gasket / synthetic rubber gasket confirming to relevant BIS codes including all kinds of flanged short pieces, bends, tees & other specials etc made from parent tubes & welded with flanges of required tables as applicable for the particular reach as per site conditions including flushing, cleaning & hydraulic testing as per directions of Engineer-in-charge.150mm dia (M) Flange Table 17 | 300 | Rmt. | 880 ₹2,64,000 | 890 ₹2,67,000 | 580 ₹1,74,000 Lowest |
| 2.01 | Laying and binding ( By way of circumferental butt welding by electrical arc welding ) and testing of galvanised mild steel tube G.I pipe of following Dia. Confirming to BIS 1239-2001 ( Latest with upto date ammendements having wall thickness as per code with bevelled / Plain ends in a random length of 4 to 7 Mtrs. including mfg. reducers/ tapers all the pieces , bends etc. as per site requirement made from parent tube. The laying of will includes all operation such as Cutting , welding , jointing , fabrication of bends , tee etc. including lowering and laying in excavated trenches to ensure required level including flushing and cleaning anad hydrullic testing complete in all respectto the satisfaction of the Engineer in Charge. the fabricated bend shall have three or four cuts having its radius not less than five times the dia. of ppe . the dameged portion of the pipe end special made form the parent tube during welding or otherwised shall be provided anti corrossive treatment by applying two coats of anti corrossive bitumens paint over a priming coat as per AWWA specifications C- 203 -1978. the welding electric shall be Aas per IS 814 of advani OerIkon / L&T or ISI markd make . The rate also includes entire carriage of material, flushing, cleaning , hydraullic testing complete to the best satisfication and direction of Enginner in Charge with in alll leads and lifts .( Earth work in trenches will be measured and paid for separtely. 125mm dia (MC) | 410 | Rmt. | 277 ₹1,13,570 Lowest | 290 ₹1,18,900 | 670 ₹2,74,700 |
| 2.02 | Providing, Laying, Jointing Flanged joints including welding the same with MSERW Pipe /GI Pipe with following flange table( @ 5% joints in total length of gravity main ) mentioned below with nuts and bolts of required sizes , 3mm thick compressed asbestos fiber gasket or synthetic rubber gasket confirming to relevant BIS Code and to the direction & best satisfaction of Engineer in charge | 20 | Pair | 3,700 ₹74,000 | 3,800 ₹76,000 | 850 ₹17,000 Lowest |
Tender Value
₹5.0 L
EMD Value
₹9,982
Closing Date
11 Sept 2025, 5:00 pmClosed
EE JSVD Anni
EE JSVD Anni
SH Laying Jointing and testing of gravity main in GI M flanged pipe of dia 150mm 300 Rmt and Rising main 125mm M 410 Rmt. and Providing and Fixing flanged joint. from 2nd to 3rd stage
2025_HPIPH_114094_1
5682-5732
Open Tender
Civil Works
Item Rate
120 days
Nither
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
₹9,982
9 Oct 2025
6 Sept 2025
12 Sept 2025
6 Sept 2025
11 Sept 2025
6 Sept 2025
Amount
Excavation in foundation and trenches (For pipes and pits) up to all depths and in all classification of each work such as pick work, jumper work, saturated soil including bailing or pumping out of water, blasting soft or hard rock or chiselling or wedging out of soft/ hard rock, where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting, planking, timbering and dewatering where ever required. Stacking usable and unusable material/ soil separately and after laying, jointing and testing of pipes, returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts including restoration of unmetalled surfaces to its original condition and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect with in all leads and lifts as per direction of Engineer-in-Charge. Pick & Jumper work
Laying, jointing and testing in trenches to be levelled to grades, GI flanged pipes of following diameter confirming to IS:1239-1990( Part-II) having minimum wall thickness as per IS code and class of pipes specified below, The MS flanges shall confirm to BIS 6392-1971 (with latest up to date amendments) welded at both ends according to relevant BIS standards and detailed specifications i/c provision of nut & bolts of required sizes, 3mm thick compressed asbestos fiber jointing gasket / synthetic rubber gasket confirming to relevant BIS codes including all kinds of flanged short pieces, bends, tees & other specials etc made from parent tubes & welded with flanges of required tables as applicable for the particular reach as per site conditions including flushing, cleaning & hydraulic testing as per directions of Engineer-in-charge.150mm dia (M) Flange Table 17
Laying and binding ( By way of circumferental butt welding by electrical arc welding ) and testing of galvanised mild steel tube G.I pipe of following Dia. Confirming to BIS 1239-2001 ( Latest with upto date ammendements having wall thickness as per code with bevelled / Plain ends in a random length of 4 to 7 Mtrs. including mfg. reducers/ tapers all the pieces , bends etc. as per site requirement made from parent tube. The laying of will includes all operation such as Cutting , welding , jointing , fabrication of bends , tee etc. including lowering and laying in excavated trenches to ensure required level including flushing and cleaning anad hydrullic testing complete in all respectto the satisfaction of the Engineer in Charge. the fabricated bend shall have three or four cuts having its radius not less than five times the dia. of ppe . the dameged portion of the pipe end special made form the parent tube during welding or otherwised shall be provided anti corrossive treatment by applying two coats of anti corrossive bitumens paint over a priming coat as per AWWA specifications C- 203 -1978. the welding electric shall be Aas per IS 814 of advani OerIkon / L&T or ISI markd make . The rate also includes entire carriage of material, flushing, cleaning , hydraullic testing complete to the best satisfication and direction of Enginner in Charge with in alll leads and lifts .( Earth work in trenches will be measured and paid for separtely. 125mm dia (MC)
Providing, Laying, Jointing Flanged joints including welding the same with MSERW Pipe /GI Pipe with following flange table( @ 5% joints in total length of gravity main ) mentioned below with nuts and bolts of required sizes , 3mm thick compressed asbestos fiber gasket or synthetic rubber gasket confirming to relevant BIS Code and to the direction & best satisfaction of Engineer in charge
RAHUL SHARMA (BID ID -553972)
SANYOG KUMAR (BID ID -553951)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .