Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance THAVANOOR GRAMA PANCHAD KERALA | KANNUR | KERALA | 670612 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹10.9 L+₹13,019.69 (1.21%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹11.2 L+₹37,740.28 (3.50%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹11.3 L+₹48,509.43 (4.50%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹11.6 L+₹80,189.81 (7.43%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P.SAIDALIKUTTY L1 | JAYARAJAN K L4 | SAMEER HYDER M L3 | MUSTHAFA K L2 | ROADEX BUILDERS LLP L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Thodu side Protection | ||||||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 47.17 | cum | 1,982.31 ₹93,515.47 Lowest | 2,100 ₹99,067.5 | 2,051.66 ₹96,787.06 | 2,007 ₹94,680.23 | 2,129.64 ₹1,00,465.77 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 102 | cum | 280.52 ₹28,613.04 Lowest | 330 ₹33,660 | 290.33 ₹29,613.66 | 283 ₹28,866 | 301.37 ₹30,739.74 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.4 | cum | 6,186.25 ₹14,847 Lowest | 7,000 ₹16,800 | 6,402.66 ₹15,366.38 | 6,265 ₹15,036 | 6,646.03 ₹15,950.47 |
| 1.00 | OD196228/2026-2027:Dry rubble without concrete
levelling course masonry with Departmental material including packing to
compactness to lines and levels cost and conveyance of all materials labour charges
etc. complete as per direction of Departmental officers at site | 36 | cum | 1,338.08 ₹48,170.88 Lowest | 1,500 ₹54,000 | 1,384.89 ₹49,856.04 | 1,355 ₹48,780 | 1,437.53 ₹51,751.08 |
| 1.00 | OD50912/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 198.13 | cum | 3,114.19 ₹6,17,023.81 Lowest | 3,150 ₹6,24,118.95 | 3,223.13 ₹6,38,608.42 | 3,154 ₹6,24,911.48 | 3,345.65 ₹6,62,883.67 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.4 | cum | 7,202.42 ₹1,90,143.89 Lowest | 7,500 ₹1,98,000 | 7,454.37 ₹1,96,795.37 | 7,295 ₹1,92,588 | 7,737.72 ₹2,04,275.81 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 72 | sqm | 301.13 ₹21,681.36 Lowest | 354 ₹25,488 | 311.67 ₹22,440.24 | 304 ₹21,888 | 323.51 ₹23,292.72 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 714 | kilogram | 87.67 ₹62,596.38 Lowest | 103 ₹73,542 | 90.73 ₹64,781.22 | 88 ₹62,832 | 94.18 ₹67,244.52 |
| 1.01 | OD51090/2026-2027:Providing and fixing Granite of any colour and shade for Name board, of required size<br>laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all,<br>levels, including lettering & fixing | 1 | each | 2,393.19 ₹2,393.19 Lowest | 2,818 ₹2,818 | 2,476.91 ₹2,476.91 | 2,423 ₹2,423 | 2,571.05 ₹2,571.05 |
Tender Value
₹12.7 L
EMD Value
₹31,772
Closing Date
2 Nov 2026, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
Office of the Executive Engineer, LID and EW Division, Malappuram, civil station, Malappuram District Panchayath Building, Malappuram, 676505
Annual Plan-Malappuram DP (2026-27), Project No 376-27 -Protection of Ponmundam Anusseri thod -Ponmundam GP-General Civil Work
2026_LSGD_881836_12
DB1/TN/AEE/24/26-27
Open Tender
Civil Works - Canal
Item Rate
240 days
MALAPPURAM
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹31,772
Yes
5 Nov 2026
26 Oct 2026
4 Nov 2026
26 Oct 2026
2 Nov 2026
26 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Thodu side Protection | |||||
| 1.001 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 47.18 | cum | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 102 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.4 | cum | - | - |
| 1.004 | OD196228/2026-2027:Dry rubble without concrete
levelling course masonry with Departmental material including packing to
compactness to lines and levels cost and conveyance of all materials labour charges
etc. complete as per direction of Departmental officers at site | 36 | cum | - | - |
| 1.005 | OD50912/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 198.13 | cum | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 26.4 | cum | - | - |
| 1.007 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 72 | sqm | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 714 | kilogram | - | - |
| 1.009 | OD51090/2026-2027:Providing and fixing Granite of any colour and shade for Name board, of required size<br>laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all,<br>levels, including lettering & fixing | 1 | each | - | - |
stage.html
html • 0.02 MB
finance_1500814.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_1500814.xls
BOQ • 0.30 MB
PRELIMINARY AGREEMENT.pdf
Tender Documents • 0.15 MB
E-PAYMENT.pdf
Tender Documents • 0.01 MB
FORM OF TENDER.pdf
Tender Documents • 0.18 MB
INTEGRITY PACT.pdf
Tender Documents • 0.05 MB
AFFIDAVIT.pdf
Tender Documents • 0.35 MB
12SBD.pdf
Tender Documents • 1.73 MB
12.pdf
Tender Documents • 0.02 MB
12NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .