Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | -6.50% | ₹2.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.4 L+₹5,007.48 (2.14%)Admitted-Fee/PreQual/Technical/Finance | -4.50% | ₹2.4 L+₹5,007.48 (2.14%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 L+₹11,266.83 (4.81%)Admitted-Fee/PreQual/Technical/Finance | -2.00% | ₹2.5 L+₹11,266.83 (4.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
20 Aug 2026, 4:00 pmClosed
Executive Engineer
FBI Division Tangmarg
Construction of cement concrete lining wall near the land of Mohd maqbool mir and others at pandithpora bala ,minor of khoi khul Tangmarg- Afresh
2026_IFC_319617_3
Enit no 10 of 2026-27 of FBI Division Tangmarg
Open Tender
Civil Works
Percentage
25 days
Executive Engineer FBI Division Tangmarg
As per NIT
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer FBI Division Tangmarg
₹5,000
Yes
27 Aug 2026
5 Aug 2026
21 Aug 2026
5 Aug 2026
20 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 30.34 | Cum | 592.9 | ₹17,988.59 |
| 2 | Dumping of boulders on level horizontal incl. cost of boulders | 9.89 | Cum | 937.9 | ₹9,275.83 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 6.3 | Cum | 5,202.9 | ₹32,778.27 |
| 3.01 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.3 | Cum | 5,733.6 | ₹1,16,392.08 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns etc for mass concrete | 77.61 | Sqm | 286.35 | ₹22,222.19 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.3 | Cum | 6,591.25 | ₹21,751.13 |
| 6 | Carriage of materials by Mechanical Transport
40 mm agg. (Avg 10 km) | 5.24 | Cum | 303.34 | ₹1,589.5 |
| 6.01 | 20 mm agg. (Avg 10 km) | 19.37 | Cum | 279.04 | ₹5,405 |
| 6.02 | Sand for an avg lead of 40 kms | 12.3 | Cum | 630.74 | ₹7,758.1 |
| 6.03 | Stones for an avg lead of 10 kms | 9.89 | Cum | 328.31 | ₹3,246.99 |
stage.html
html • 0.02 MB
finance_1059455.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1059455.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .