Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹7.3 L+₹13,244.48 (1.85%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.9 L+₹76,817.96 (10.7%)Rejected-Finance N A | L3 | Rejected-Finance L3 | |
| 4 | L4₹9.8 L+₹2.6 L (37.0%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹10.2 L+₹3.0 L (42.6%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹22.5 L
EMD Value
₹41,300
Closing Date
18 Aug 2020, 5:00 pmClosed
Executive Engineer, HPPWD Division Sangrah
Executive Engineer, HPPWD Division Sangrah
C/O 5/7 mtr. Wide formation cutting in Km. 0/00 to 1/645)
2020_PWD_39278_8
2499-2599 dated 23.07.2020
Open Tender
Civil Works
Item Rate
180 days
Sangrah
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer, HPPWD Division Sangrah
₹41,300
7 Sept 2020
4 Aug 2020
19 Aug 2020
4 Aug 2020
18 Aug 2020
4 Aug 2020
Amount
Excavation in earth work in hilly area all heights and depths in all kinds of soil including saturated comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precaution against soil erosion, damage to hill side, water pollution etc. and protect stability of hill side track shall be excavated with chiseling and wedging out rock (where blasting is prohibited) all earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge in conformity with the requirement of technical specification for rural road and clause 1603.1 & 1603.2 (One thousand six hundred three point one & One thousand six hundred three point two) to achieve designed formation width including and stacking of material useful for constrction at suitable sites and safe disposal & dumping to be arranged by the contractor of unsuitable cut material in specified manner, timmimg, filling of unevenness, blindage and finishing of the road to specified dimension or as directed by the Engineer-in -Charge for smooth riding. The recovery of the stones whether useful or not, for 324.45 cum (Three hundred Twenty Four point Four Five) in any case failing which recovery @170/- per cum shall be effected on pro-data basis.Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to duly compensated by him in all cases.
Jalam Singh
vijay singh
DROPTI SHARMA
SITA RAM
Pawan Kumar
BALI RAM
HARISH THAKUR
Rattan Singh Chauhan Contractor
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .