| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.7 L+₹2,712.57 (1.63%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JOJO MATHEW L2 | ABHILASH.M.K. L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF PUBLIC TOILET | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 5.63 | cum | 335.74 ₹1,891.56 | 330.37 ₹1,861.3 Lowest |
| 1.00 | OD383269/2025-2026:Laterite masonry with neatly dressed laterite stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials , labour charges etc.(MOD 50.6.7.1 of DAR) | 5.36 | cum | 6,496.02 ₹34,825.16 | 6,392.08 ₹34,267.94 Lowest |
| 1.00 | OD383270/2025-2026:Laterite neatly dressed stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including cost of materials, labour charges etc. complete. (MOD 50.6.7.2 of DAR) | 3.26 | cum | 7,319.61 ₹23,876.57 | 7,202.5 ₹23,494.56 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.36 | cum | 7,404.03 ₹2,665.45 | 7,285.57 ₹2,622.81 Lowest |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.47 | cum | 12,546 ₹5,884.07 | 12,345.26 ₹5,789.93 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | 897.16 ₹897.16 | 882.81 ₹882.81 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 2.34 | sqm | 712.02 ₹1,666.13 | 700.63 ₹1,639.47 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 16.45 | kilogram | 104.93 ₹1,726.1 | 103.25 ₹1,698.46 Lowest |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 16.38 | kg | 104.93 ₹1,718.75 | 103.25 ₹1,691.24 Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,237
Closing Date
16 Mar 2026, 10:00 amClosed
Assistant Engineer
Alakode Grama Panchayath
Re-E-TENDER-Pro- No - 398 -2025-26-Construction Of Toilet Building For Palumcheetha Community Hall
2026_LSGD_844268_2
9-E-TEN/ALKD/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
270 days
Alakode
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹4,237
Yes
7 Jul 2026
6 Mar 2026
18 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF PUBLIC TOILET | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | OD383269/2025-2026:Laterite masonry with neatly dressed laterite stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials , labour charges etc.(MOD 50.6.7.1 of DAR) | 1 | cum | - | - |
| 1.003 | OD383270/2025-2026:Laterite neatly dressed stones of size 35x20x20 cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including cost of materials, labour charges etc. complete. (MOD 50.6.7.2 of DAR) | - | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.009 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1425361.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_1425361.xls
BOQ • 0.33 MB
NIT.pdf
Tender Documents • 0.04 MB
SBD.pdf
Tender Documents • 1.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .