| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAdmitted-Finance | ₹14.4 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Party failed to submit Solvency certificate in line with PQC. |
| Sl No | Description | Qty | Unit | Vallooran Constructions L1 |
|---|---|---|---|---|
| 1.00 | Chipping & removing portions of existing RCC works carefully without damaging the remaining structure & removing the debris as per directions within a distance of 150 m. | 7 | M3 | 4,300 ₹30,100 Lowest |
| 2.00 | Dismantling and clearing away any thickness of rubble, brick, laterite in CM including disposal of debris as per directions within a distance of 150 m. | 3.5 | M3 | 1,600 ₹5,600 Lowest |
| 3.00 | Dismantling and removing windows/ventilators/shelves/cup boards/AC frames etc including removal of shutters, hinges, holdfasts and all other fittings and stacking materials as per deptl.instructions | 16 | NO | 490 ₹7,840 Lowest |
| 4.00 | Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out initally & then removal of structural after cutting to suitable length to FACT ,Phase-1 scrap yard through mechnical means (Measurements will be based on actual weight taken at FACT's weigh bridge if required by Engineer-in-Charge) | 2 | TO | 9,700 ₹19,400 Lowest |
| 5.00 | Chipping & removing old cement plastered surface including racking out joints & clearing the surface for replastering & disposal of the debris as per directions within a distance of 150 m. | 250 | M2 | 160 ₹40,000 Lowest |
| 6.00 | RCC work in 1:1½:3 nominal mix using 20 mm and downgrade hard granite broken stone including all charges for mixing concrete, laying, consolidating, curing etc.complete but excluding cost of form work & reinforcement works- For foundation footings, bottom & sides of trenches, equipment foundations, plinth beams, lintels, slabs, columns & beams etc.up to 5 m from ground level. | 15 | M3 | 11,500 ₹1,72,500 Lowest |
| 7.00 | Providing formwork to RCC works with necessary wooden planks, joists, runners, posts etc.including removal after completion of works- For foundation footings etc. | 40 | M2 | 970 ₹38,800 Lowest |
| 8.00 | Providing reinforcements to RCC works with MS / Tor steel rods including all charges for conveying, straightening/uncoiling, cutting, bending, placing rods in position & tying with GI / black annealed tying wire of suitable gauge etc. complete.including cost of reinforcement. | 2 | TO | 1,06,000 ₹2,12,000 Lowest |
| 9.00 | Cement plastering with CM 1:4,12 mm thick one coat floated hard and trowelled smooth at all levels,including cost of cement | 600 | M2 | 592 ₹3,55,200 Lowest |
| 10.00 | Supplying and fixing anodized Aluminium frame work of extruded sections and approved brand / manufacturer including mitering the joints, fixing the frame work with necessary screws, drilling holes in floors/walls, providing plugs for fixing screws, finishing the sides of packing between frame work and walls with plaster of Paris, cost of timber packing if necessary, Rubber lining for air tightness, providing corner cleats etc.complete as per standard practice for glazed Doors, Windows, Partitions, Ventilators etc.including hinges ,pivots, tower bolts, fixtures etc.complete (All Aluminum works including fittings measured in Kg) | 100 | KG | 727 ₹72,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
7 Feb 2026, 5:00 pmClosed
SM(Mat)C
Corporate Materials, PD Administration Building, FACT - Udyogamandal. Kochi, Kerala
Repair and Concreting work of Wagon Loading Platform Staircase at Bagging Plant area in FACT CD, Ambalamedu, Kochi, as per tender conditions.
2026_FACT_894327_1
04031/2025-2026/E32898
Open Tender
Civil Works
Item Rate
120 days
FACT - Cochin Division
Please refer tender documents.
7 documents required · 7 mandatory
₹0
₹25,000
Yes
10 Jul 2026
17 Jan 2026
9 Feb 2026
17 Jan 2026
7 Feb 2026
17 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Chipping & removing portions of existing RCC works carefully without damaging the remaining structure & removing the debris as per directions within a distance of 150 m. | 7 | M3 | - | - |
| 2 | Dismantling and clearing away any thickness of rubble, brick, laterite in CM including disposal of debris as per directions within a distance of 150 m. | 3.5 | M3 | - | - |
| 3 | Dismantling and removing windows/ventilators/shelves/cup boards/AC frames etc including removal of shutters, hinges, holdfasts and all other fittings and stacking materials as per deptl.instructions | 16 | NO | - | - |
| 4 | Dismantling the existing structural carefully without damaging the remaining portions including conveying and stacking at places pointed out initally & then removal of structural after cutting to suitable length to FACT ,Phase-1 scrap yard through mechnical means (Measurements will be based on actual weight taken at FACT's weigh bridge if required by Engineer-in-Charge) | 2 | TO | - | - |
| 5 | Chipping & removing old cement plastered surface including racking out joints & clearing the surface for replastering & disposal of the debris as per directions within a distance of 150 m. | 250 | M2 | - | - |
| 6 | RCC work in 1:1½:3 nominal mix using 20 mm and downgrade hard granite broken stone including all charges for mixing concrete, laying, consolidating, curing etc.complete but excluding cost of form work & reinforcement works- For foundation footings, bottom & sides of trenches, equipment foundations, plinth beams, lintels, slabs, columns & beams etc.up to 5 m from ground level. | 15 | M3 | - | - |
| 7 | Providing formwork to RCC works with necessary wooden planks, joists, runners, posts etc.including removal after completion of works- For foundation footings etc. | 40 | M2 | - | - |
| 8 | Providing reinforcements to RCC works with MS / Tor steel rods including all charges for conveying, straightening/uncoiling, cutting, bending, placing rods in position & tying with GI / black annealed tying wire of suitable gauge etc. complete.including cost of reinforcement. | 2 | TO | - | - |
| 9 | Cement plastering with CM 1:4,12 mm thick one coat floated hard and trowelled smooth at all levels,including cost of cement | 600 | M2 | - | - |
| 10 | Supplying and fixing anodized Aluminium frame work of extruded sections and approved brand / manufacturer including mitering the joints, fixing the frame work with necessary screws, drilling holes in floors/walls, providing plugs for fixing screws, finishing the sides of packing between frame work and walls with plaster of Paris, cost of timber packing if necessary, Rubber lining for air tightness, providing corner cleats etc.complete as per standard practice for glazed Doors, Windows, Partitions, Ventilators etc.including hinges ,pivots, tower bolts, fixtures etc.complete (All Aluminum works including fittings measured in Kg) | 100 | KG | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Compliancestatement.pdf
Tender Documents • 0.28 MB
BOQ_940112.xls
BOQ • 0.26 MB
Tenderdoc.pdf
Tender Documents • 8.30 MB
Unpricedbid.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].