| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹90.6 LAccepted-Finance | ₹90.6 L | L-1 | Accepted-Finance ADMITTED |
| 2 | L-2₹1.0 CrRejected-Finance | ₹1.0 Cr | L-2 | Rejected-Finance ADMITTED |
| 3 | Not Admitted-Fee/PreQual/Technical GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | PL ENTERPRISES L2 | S R CONTRACTORS L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m. as per direction of Engineer-in-charge & also including all cost of material, labour & T&P etc. complete. | 244 | M3 | 500 ₹1,22,000 | 230 ₹56,120 Lowest |
| 2.00 | Dismantling door and window chaukhat with hold fast including stacking material with in 60M. & also including all cost of material, labour & T&P etc. complete. | 88.53 | M2 | 100 ₹8,853 | 60 ₹5,311.8 Lowest |
| 3.00 | Dismantling existing plaster including disposal of refuse with in distance of 60 meters. & also including all cost of material, labour & T&P etc. complete. | 1,380.7 | M2 | 20 ₹27,614 Lowest | 20 ₹27,614 Lowest |
| 4.00 | Dismantling C.C. or brick or granolithic floor including base concrete and including stacking of dismantled material with in 60 M distance. & also including all cost of material, labour & T&P etc. complete. | 525.67 | M2 | 30 ₹15,770.1 Lowest | 100 ₹52,567 |
| 5.00 | Centering and shuttering of C.C. work including rent of shuttering material,labour and T&P required for proper completion of work for slab,lintel,sun shades,columns & walls etc. | 58.82 | M2 | 450 ₹26,469 | 280 ₹16,469.6 Lowest |
| 6.00 | Laying Brick work C.M.1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. Complete. | 153.64 | M3 | 5,800 ₹8,91,112 | 5,200 ₹7,98,928 Lowest |
| 7.00 | Centering and shuttering of R.C.C./R.B. work including cost of centering & shuttering upto 3.00 height. | 509.36 | M2 | 800 ₹4,07,488 | 450 ₹2,29,212 Lowest |
| 8.00 | Reinforcement including cutting,bending & binding in position including all cost of labour,material and T&P etc.complete at site per M.T. | 9.32 | M.T. | 85,000 ₹7,92,200 | 66,500 ₹6,19,780 Lowest |
| 9.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement,coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc.complete but excluding cost of centering ,shuttering & Reinforcement. | 79.14 | M3 | 7,500 ₹5,93,550 | 6,150 ₹4,86,711 Lowest |
| 10.00 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately)Sal wood | 3.77 | M3 | 1,00,000 ₹3,77,000 | 56,000 ₹2,11,120 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
8 Jul 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Janpad Bareilly ke antragat nirikshan bhavan rithora ke punrodhar ka karye.
2026_UPIDC_1164116_1
01/SE/2026-27
Open Tender
Civil Works
Item Rate
360 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹2.3 L
Yes
31 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m. as per direction of Engineer-in-charge & also including all cost of material, labour & T&P etc. complete. | 244 | M3 | - | - |
| 2 | Dismantling door and window chaukhat with hold fast including stacking material with in 60M. & also including all cost of material, labour & T&P etc. complete. | 88.53 | M2 | - | - |
| 3 | Dismantling existing plaster including disposal of refuse with in distance of 60 meters. & also including all cost of material, labour & T&P etc. complete. | 1,380.7 | M2 | - | - |
| 4 | Dismantling C.C. or brick or granolithic floor including base concrete and including stacking of dismantled material with in 60 M distance. & also including all cost of material, labour & T&P etc. complete. | 525.67 | M2 | - | - |
| 5 | Centering and shuttering of C.C. work including rent of shuttering material,labour and T&P required for proper completion of work for slab,lintel,sun shades,columns & walls etc. | 58.82 | M2 | - | - |
| 6 | Laying Brick work C.M.1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. Complete. | 153.64 | M3 | - | - |
| 7 | Centering and shuttering of R.C.C./R.B. work including cost of centering & shuttering upto 3.00 height. | 509.36 | M2 | - | - |
| 8 | Reinforcement including cutting,bending & binding in position including all cost of labour,material and T&P etc.complete at site per M.T. | 9.32 | M.T. | - | - |
| 9 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement,coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc.complete but excluding cost of centering ,shuttering & Reinforcement. | 79.14 | M3 | - | - |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately)Sal wood | 3.77 | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_2182607.xls
BOQ • 0.32 MB
LOT05.pdf
Tender Documents • 2.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].