Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.1 LAccepted-AOC | l1 | Accepted-AOC l1 accepted | |
| 2 | Rejected-Technical | - | Rejected-Technical li accepted | |
| 3 | Rejected-Technical | - | Rejected-Technical li accepted |
| Sl No | Description | Qty | Unit | K.MUJEEB L3 | MUHAMMAD HASSAN L2 | Varghese Kurian L1 |
|---|---|---|---|---|---|---|
| 1.00Retaining wall | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 22.95 | cum | 359.72 ₹8,255.57 | 351.45 ₹8,065.78 | 350.73 ₹8,049.25 Lowest |
| 1.00 | OD310468/2025-2026:Putting up ring bund with earth filled gunny bags of top width 1.00 m and bottom width 2.00 m
and height 2.00m and filling in between with earth to form ring bund and maintaining the same
leak proof till the completion of work and clearing the site by dismantling the bund after
completion of work etc complete.( Based on 60.1.2 | 5 | metre | 1,525.36 ₹7,626.8 | 1,488.32 ₹7,441.6 | 1,487.23 ₹7,436.15 Lowest |
| 1.00 | OD301956/2025-2026:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set
including conveyance to site and erection, cost of fuel, lubrication oil and other stores, pay of
staff etc complete | 30 | hour | 455.83 ₹13,674.9 | 445.35 ₹13,360.5 | 444.43 ₹13,332.9 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.62 | cum | 7,932.89 ₹12,851.28 | 7,750.43 ₹12,555.7 | 7,734.57 ₹12,530 Lowest |
| 1.00 | OD9787/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 59.18 | cum | 3,993.46 ₹2,36,348.94 | 3,901.61 ₹2,30,912.89 | 3,893.62 ₹2,30,440.01 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.85 | cum | 8,343.49 ₹32,105.75 | 8,151.59 ₹31,367.32 | 8,134.9 ₹31,303.1 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.29 | cum | 9,963.93 ₹22,867.22 | 9,734.76 ₹22,341.27 | 9,714.83 ₹22,295.53 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 215.67 | kilogram | 112.43 ₹24,247.89 | 109.84 ₹23,689.3 | 109.62 ₹23,641.86 Lowest |
| 1.01 | OD190491/2025-2026:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge(Modified from 50.2.25.1) | 23.44 | cum | 1,559.59 ₹36,563.03 | 1,523.67 ₹35,720.92 | 1,520.6 ₹35,648.95 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,582
Closing Date
7 Nov 2025, 6:00 pmClosed
AE,Ambalappuzha block Panchayath
AE,Ambalappuzha block Panchayath
AMBALAPUZHA BLOCK PANCHAYATH - 2025-26 - PROJ NO. 10/26-Ambalappuzha Block panchayat - Division 3 - Construction of retaining wall at west side of parappil padom of ward no. 6 of Punnapara South GP
2025_LSGD_804871_7
T5/25-26
Open Tender
Civil Works - Roads
Item Rate
180 days
Ambalappuzha block Panchayath
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
Yes
₹10,582
Yes
7 May 2026
30 Oct 2025
10 Nov 2025
30 Oct 2025
7 Nov 2025
30 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1368932.xls
BOQ • 0.26 MB
tendernotice.pdf
Tender Documents • 0.27 MB
epayment.pdf
Tender Documents • 0.24 MB
ipact.pdf
Tender Documents • 0.24 MB
fot.pdf
Tender Documents • 0.26 MB
affidavit.pdf
Tender Documents • 0.24 MB
preagrmt.pdf
Tender Documents • 0.26 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .