| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC HOSPITAL ROAD KUMARGHAT TRIPURA U | UNAKOTI | TRIPURA | 799263 | ₹1.9 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | Rejected-Technical KAMALPUR DHALAI DISTRICT TRIPURA | - | - | Rejected-Technical NON-RESPONSIVE |
| Sl No | Description | Qty | Unit | BHANU BHUSAN DEB L1 |
|---|---|---|---|---|
| 1.00 | Sub Head - 1: Civil Part
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.-All kinds of soil. | 378.66 | Cum | 380 ₹1.4 L |
| 2.00 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 184.08 | Cum | 1,450 ₹2.7 L |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and Shuttering
All work up to plinth level:
(i) 1:3:6 (1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) cum . | 49.12 | Cum | 12,160 ₹6.0 L |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level:
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 332.07 | Cum | 13,990 ₹46.5 L |
| 5.00 | Reinforcement for R. C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 31,546.65 | Kg | 117 ₹36.9 L |
| 6.00 | Centering shuttering including shutterings, propping etc. and removal of form work for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply. | 1,525.6 | Sqm | 470 ₹7.2 L |
| 7.00 | Neat cement punning. | 24.12 | Sqm | 70 ₹1,688.40 |
| 8.00 | Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. | 812.18 | Cum | 360 ₹2.9 L |
| 9.00 | 60 mm thick factory made c.c interlocking paver block of M -30 Grade
Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of sand, filling the joints with fine sand etc. all complete as per specification and approval/ direction of the Engineer-in-charge.
For flooring: | 1,010.24 | Sqm | 1,398 ₹14.1 L |
| 10.00 | 12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand) in/c neat cement punning. | 681.56 | Sqm | 285 ₹1.9 L |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
19 Dec 2025, 3:00 pmClosed
THE EE TUDA
O/O THE EE TUDA 4TH FLOOR UDD BHAWAN
Kumarghat under the scheme for Special Assistant to States for Capital Investment 2024 25
2025_TUDA_67721_1
63_CE_CP_EE_TUDA_2025_26
Open Tender
Civil Works
240 days
KUMARGHAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,000
₹3.5 L
O/O THE EE TUDA 4TH FLOOR UDD BHAWAN
30 Mar 2026
29 Nov 2025
19 Dec 2025
1 Dec 2025
19 Dec 2025
11 Dec 2025
1 Dec 2025 - 8 Dec 2025
8 Dec 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.73 MB
Tender Documents
Tender Documents • 4.05 MB
BOQ
BOQ • 0.33 MB
Additional Documents
Additional Documents • 0.80 MB
Download all tender documents and submit your bid