| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
₹42.2 L
EMD Value
₹50,000
Closing Date
19 Mar 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, KD DIVISION THANNEERMUKKOM
Retender-GENERAL-PULITHARAMURI MICHABHOOMI PADASEKHARAMImprovement works to Pulitharamuri Michabhoomi Padasekharam in Kodamthuruth Grama Panchayath-General Civil Work
2025_Irrig_740760_2
36/EE/KDT/2024-25
Open Tender
Civil Works - Others
Item Rate
360 days
Kodamthuruth
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
29 Apr 2025
11 Mar 2025
24 Mar 2025
11 Mar 2025
19 Mar 2025
11 Mar 2025
Amount
Retaining wall and Bund formation
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
OD30587/2024-2025:Bund formation: Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m:All kinds of soil(2.2.1-2.4-2.5)
OD30582/2024-2025:Bund Formation- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) for flood banks, marginal bunds etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming etc, lead up to 50 m and lift up to 1.5 m.
OD30589/2024-2025:Strengthening slopes/earthen bund using coir geo-textiles (740GSM) etc complete including conveyance and all other incidental charges as per the directions of the departmental officers at site
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD30583/2024-2025:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o material and labour charges etc. complete as per direction of departmental officers at site.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD30584/2024-2025:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Bidder Name
PONNUS CONSTRUCTIONS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1211204.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .