Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44,500Qualified 3148 GROUND FLOOR MOHALA DASHAN HAUZ QUAZI AJMERI GATE CENTRAL DELHI DELHI 110006 | NORTH DELHI | DELHI | 110006 | L1 | Qualified | |
| 2 | L2₹44,800+₹300 (0.67%)Qualified PLOT NO 4 ARDOI SURVEY NO 583 DHWANI INDUSTRIAL PARK 4 HADAMTALA POLICE STATION ROAD GONDAL ROAD NATIONAL HIGHWAY 8 B RAJKOT GUJARAT 360030 | RAJKOT | GUJARAT | 360030 | L2 | Qualified MSE, Category: General | |
| 3 | L3₹45,000+₹500 (1.12%)Qualified E 1 38 GALI NO 17 SHIV RAM PARK NANGLOI EAST DELHI DELHI 110095 | SHAHDARA | DELHI | 110095 | L3 | Qualified | |
| 4 | L4₹46,000+₹1,500 (3.37%)Qualified 42 20 21 SITE 4 INDUSTRIAL AREA SAHIBABAD INDUSTRIAL AREA G T ROAD SAHIBABAD GHAZIABAD UTTAR PRADESH 201010 | GHAZIABAD | UTTAR PRADESH | 201010 | L4 | Qualified MSE, Category: General | |
| 5 | L5₹46,900+₹2,400 (5.39%)Qualified 3808A 5 KANHAIYA NAGAR TRI NAGAR TRI NAGAR NORTH WEST DELHI DELHI 110035 | NORTH WEST DELHI | DELHI | 110035 | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
16 Oct 2025, 6:00 pmClosed
PTMT Tap Fitting (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6759030 Dated : 06-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8437767
GEM/2025/B/6759030
Two Packet Bid
PTMT Tap Fitting (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
60 days
CHANDRAPUR
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
6 Oct 2025
6 Oct 2025
16 Oct 2025
PTMT Tap Fitting (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6759030 Dated : 06-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8437767.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .