Construction of new GF and FF building for ward office and Community Hall, under ward no.03, AMC
2026_SAMC_76709_1
30/Div-II/AMC/2026-27
Open Tender
Civil Works
Percentage
180 days
Ward No.03, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹1.1 L
7 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 100.29 | Cum | 231.6 | ₹23,226.24 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method
complete. | 70.09 | Cum | 1,177.3 | ₹82,512.25 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering - -All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size | 7.5 | Cum | 10,570.6 | ₹79,276.33 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 41 | Cum | 12,073.8 | ₹4,95,047.53 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : In plinth and skirting courses, fillets, columns, pillars, posts and struts: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 7.24 | Cum | 13,305.8 | ₹96,280.77 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone
aggregate 20 mm nominal size) | 48.2 | Cum | 13,584.5 | ₹6,54,774.26 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more | 11,572.54 | kg | 103.9 | ₹12,02,387.32 |
| 8 | Centering shuttering including struttings, propping etc. and removal of form work for Foundations, footings, bases for columns etc. for mass
concrete with steel formwork | 17.28 | Sqm | 401.2 | ₹6,932.74 |
| 9 | Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and
cantilevers with shuttering ply | 253.05 | Sqm | 499.4 | ₹1,26,373.17 |
| 10 | Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with
shuttering ply | 113.76 | Sqm | 625.5 | ₹71,156.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
DNIet30.pdf
Tender Documents • 3.16 MB
BOQ_78087.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .