Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
29 Nov 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HOD(MECH)
HOD MECH CCI Tandur
Tender for Annual contract for Plant Maintenance Jobs Reg
2023_CCI_174320_1
TCF/MECH/07/3078/22 R
Open Tender
Miscellaneous Services
Fixed-rate
365 days
CCI Tandur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
30 Dec 2023
14 Nov 2023
30 Nov 2023
14 Nov 2023
29 Nov 2023
14 Nov 2023
Amount
Apron feeder/ALIND conveyor/Spillage conveyor/Besta feeder of coal mill
Chain/Scrapper bar with chain link replacement/ bucket (Includes counter release and adjustment, Dismantling /assembly of old and new chain, insertion of pins to lock chain. Complete set -18mtrs, patch work of partion plate side wall if required)
Shortening of chain
Return / Top supporting rollers replacement
Replacement of Head drum sprocket with coupling (includes dismantling and assembly of coupling and bearing )
Replacement of Head drum bearing (includes dismantling and erection of coupling/ open gear, chains, bearing, sprocket )
Replacement of Tail drum sprocket (includes releasing/adjustment of counter weight arrangement, De linking of chains)
Replacement of Tail drum bearing
Buckets special bolts replacement
Moving breaker links
Links replacement
LS Crusher
Hammers replacement
Dummy plates replacement
Hammer jam removal
grate bars replacement
Segment (2 1/4') replacement
DE, NDE bearings seals replacement
Stacker
Stacker wheels replacement ( NDE)
Stacker wheels replacement ( DE)
Stacker bogie guide roller replacement
Stacker gear box replacement
Stacker break liners replacement
Stacker bogie alignemnt
Grinding roller
Grinding roller replacement
Grinding roller Dismantling
Grinding roller seal replacement
Replacement of Grinding roller tyre
Grinding roller bearing inspection
Mill Gearbox top air sealing cloth replacement
HSMS/HSLM tank oil replacement/cleaning
Raw mill main gear box
Raw mill main gear box input coupling torsion shaft replacement
Rawmill main gear box input coupling bolts decoupling and re coupling
Rawmill gear box input coupling flexible element (Rubber) replacement (motor side)
Input coupling spring plate replacement ( gear box side)
Input coupling spring plate replacement ( motor side)
Rawmill main gear box oil replacement
Rocker arm
Rocker arm thrust plate inspection and replacement of thrust plate and / bolts.
Rocker arm axle bearing replacement
Raw mill
Mill body liners replacement
Hydraulic cylinder
Hydraulic cylinder replacement
Hydraulic cylinder seal replacement
Hydraulic cylinder bottom bearing replacement
Hydraulic cylinder/yoke bearing replacement
Yoke replacement
Yoke half nut replacement
Nitrogen cylinder replacement
Nitrogen cylinder bladder replacement
Dam ring
Dam ring replacement
Dam ring removal and fitment of segment
Dam ring broken bolt removal and new bolt fixing
Dam ring vertical plate replacement
Scattering ring replacement
Tripple gate feeder
Triple gate cylinder replacement
Tripple gate feeder bearings replacement
Tripple gate feeder flap replacement
Tripple gate feeder body liner replacement
Classifier
Classifier shaft,bearing,replacement
Classifier body liner replacement
Classifier vanes replacement
Classifier vanes rope replacement
Classifier cardan shaft replacement
Classifier diaphragm coupling replacement
Mill fixed dampers repair/replacement
Classifier body to mill body support repair/replacement
Auxiliary equipment
VRM internal water injuction pump replacement
Cooler/heat exchanger dismatling,cleaning and assembly
GCT water line pipes/valve replacement
Expansion Joints of various sections like: rawmill, coal mill & preheater fan outlet
Expansion Joints fabric replacement
Replacement of Silo extraction, kiln feed bin & SFF dosing valve
S.S/Alloy steel Anchor
Fabrication of anchor
Fixing of anchor (SS304)
Air blaster maintenance work
Replacement of air blaster (include cuttiing, welding, dismantling, erection works, levelling & finishing works to start the plant smoothly & etc.,)
Replacement of air blaster internals spares
Replacement of discharge SS pipe
Preheater all Cyclone flaps Maintenance work
Cyclone stage 1 (twin), 2-1, 2-2, 3-1 & 3-2 flaps replacement (including cutting of SS plate, dismantling /assembly of plate, fixing/tightening of SS bolt)
4-1 & 4-2 cyclone flap replacement (including cutting of SS plate, dismantling /assembly of plate, fixing/tightening of SS bolt)
All cyclone flaps shaft replacement with bearing housing
Preheater all Cyclone feed pipe & cyclone Maintenance work
Redspot patch box provision (includes Anchor welding, castable & welding etc.,)
Feed pipe replacement work 600 -800mm (approx) with castable up to 25Mtr (include cutting, welding, dismantling, erection works & finishing works to start the plant & etc.,)
Feed pipe replacement work Dia 600 -800mm (approx) with castable above 25Mtr (include cutting, welding dismantling, erection works & finishing works to start the plant & etc.,)
Feed pipe Patch replacement (includes Anchor welding, castable, welding & finishing works etc.,)
All Cyclone cylindrical portion, Riser duct portion, inlet tangential portion, bottom cone portion Patch work (includes Anchor welding, castable, welding & finishing works etc.,)
All Feed pipe expansion joint replacement Dia:600
Cyclone 2-1, 2-2, 3-1, 3-2, 4-1 & 4-2 expansion joint replacement
Fabrication of 2-1, 2-2, 3-1, 3-2, 4-1 & 4-2 cyclone expansion joint with supports, flanges and matching flanges.
Fabrication of inspection door box type as per site condition size: range 400mm to 800mm square with SS anchor welding
Fixing of inspection door box type as per site condition size: range 400mm to 800mm square with SS anchor welding
Replacement of immersion tube in all cyclones (2-1, 2-2, 3-1, 3-2 & 4-1 & 4-2) during shutdown
Dismantling & shifting works (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work, Dismantling of distance piece, expansion joint, cutting, grinding, welding supports, jigs, finishing works to start the plant, etc.,)
Erection, Fitment works (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work, Dismantling of distance piece, expansion joint, grinding, welding supports, jigs, finishing works to start the plant, etc.,)
Fabrication and finishing works (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work cutting, grinding, welding supports, jigs, finishing works, etc)
Fixing and removal of dummy plate at all cyclone and feed pipes (Includes dismantling of distance piece, cutting, wedlingand ginding works)
Replacement of throttle damper at kiln inlet (Approx -3MT) during shutdown
Dismantling & shifting works of throttle damper (includes Cutting of SS plate 8 -25mm thk welding, setting, sealing ring & finishing works to start the plant, etc.
Erection, alignment, Fitment works of throttle damper (includes Cutting of SS plate 8 -25mm thk welding, setting & finishing works to start the plant, etc.)
Fabrication and finishing work of throttle damper (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work)
Fabrication and finishing work throttle damper bottom support (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work) total 6 nos support
Kiln inlet arch plate with anchor anchor fixing work and shuttering work
Dismantling and shifting (includes Cutting, welding, setting, & finishing works to start the plant, etc.)
Erection, Fitment, welding and finishing works (including welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle )
Fabrication and finishing work
Kiln inlet Lip plate with mother plate replacement with anchor anchor fixing work.
Dismantling and shifting (includes Cutting, welding, setting, & finishing works to start the plant, etc.)
Erection, Fitment, welding and finishing works (including welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle )
Fabrication and finishing work
Kiln conical segment replacement work
Replacement of conical segment Includes removal/fixing of scoop ring, spring plate, wear pate, guide plate(vertical), SS bolt, addditional patch work and finishing works to start the plant smoothy, etc.,
Replacement of damaged conical segment (includes fabrication of SS plate as per drawing, dismantling, fixing of new segment plate)
Kiln maintenance work during shutdown works
Kiln shell crack welding work (shell thk 28-63mm) (deploy special welders)
Tyre Chair pad welding work (deploy special welders)
Girth gear Grease tray (includes removal, heating and fixing of grease tray )
Shifting of cooling fan at kiln shell levels 5- 65mtrs (includes removal /fixing and shifting from ground floorto kiln platform level) Note: crane will be provided by CCI
Replacement of damaged spring plates and tightenng of ropes at kiln inlet & outlet segment
Removal & fixing of TA duct, Preduster & secondary air duct & cooler doors
Replacement of support roller oil completely (includes complete draining, removal/fixing of covers and attachement and finishing works to start the plant smoothly
Kiln outlet shell maintenance work
Replacement of Retainer Ring (with 16mm/ 20mm/25mm/upto 50mm M.S. Plate of 100-150mm width Kiln shell to be ground after cutting of old Retainer Ring during shutdown each segment consists of 1.5mtr totally 10 nos
Replacement of segment retianer (damaged ring) includes cutting, shifting, grinding, approachable reach, fixing anchoring works.
Fabrication of retainer ring (with 16mm/ 20mm/25mm/upto 50mm M.S. Plate of 100-150mm width )
Kiln outlet tip casting replacement work
Replacement of inner tip casting segment (includes cutting, shifting, grinding, approachable reach, anchoring works)
Patch up work for kiln shell size range 28m - 40mm thk (includes cutting, shifting, grinding, approachable reach, anchoring works)
Replacement of outer tip casting segment (includes cutting, shifting, grinding, approachable reach, works)
Multi channel burner pipe Maintenance work during shutdown
Replacement of channel pipes (MS pipe)
Replacement of SS nozzle tips (includes removal of channel pipe i.e., inner axial, stabilsation pipe)
Hardfacing welding in the channel pipes (Includes patch work and finishing work to start the plant smoothly, etc.,) special wedler is required
Replacement of castbaslt Y bend, expansion joint
Replacement of Castable SS Pipe with anchors (Outer pipe)
Replacement of inner axial pipe with nozzle tip (inner pipe)
Removal/fixing of diesel pipe (includes cleaning of tips with Comp air, dismantling/assembly of nozzle tip)
Fabrication and finishing work of SS pipe ( includes bending SS plate 8 - 12mm thk, welding of anchor, welding of nozzle tip, SS ribs)
Coal pipe at kiln and coal mill section
Replacement of coal pipe size range 150mm to 250mm
Erection, Fitment, welding and finishing works
Replacement of cast basalt bend 45⁰, 90⁰, 110⁰ & Y -Bend
kiln Hood replacement work during shutdown (including welding, cutting welding anchors, retainer plate, lifting the material with castable & strengthening plate by angle)
Dismantling & shifting works includes welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle )
Erection, Fitment, welding and finishing works (including welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle )
Fabrication and finishing work includes including welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle)
a. Cooler inclined roof with brick holding/castable arrangment, b. Preduster roof with brick holding frame/ castable arrangment, c. TA duct roof with brick holding frame/ castable arrangment works. d) Cooler & preduster side walls and top roof with brick holding frame/castable arrangment during shutdown and finishing works to start the plant smoothy, etc.,
Fixing of anchors
Fixing of angle frame or beam frame
Fabrication of angle frame
Dismantling & shifting works
Erection, Fitment, welding and finishing works
Fabrication and finishing work
Cooler inlet bull nose sector with anchors /castable arrangement during shutdown and finishing works to start the plant smoothy, etc., ( 2MT approx)
Dismantling & shifting works
Erection, Fitment, welding and finishing works
Fabrication and finishing work
Fixing of anchors
Cooler Grate 1, 2 & 3 maintenance works during shutdown
Replacement of Dead grate plate, top dead grate plate, 25mm grate plate, 25mm half grate plate 13mm grate plate 13mm half grate plate & side casting (Includes removal/fixing of grate plate, cutting, welding, tightening of bolts, & finishing works to start the plant smoothly, etc.,)
Replacement of carrying wheel & drive crosshead wheel with bearing & assembly and rail replacement work
Replacement of cooler fans 1 to 10 with impeller assembly
Replacement of Drive chains (includes removal/fixing of chain, provide juggards, fixing of master links)
Replacement of drive sprocket (includes dismantlig, heating, cleaning of key portion, fixing of sprocket, alignment & fitment works to start the plant smoothly etc.,
Replacement of driven sproceket assembly with torque shaft (includes dismantling/assembly of bush bearing/ housing, sealing plate of DE side and NDE side, shaft guards, alignment works, levelling, and finishing works
Cooler carrying wheel sealing plate replacement during shutdown dia Ø127mm (includes complete dismantling /fixing of new plate, welding, cutting & any small modification works if required)
Cooler drive shaft sealing plate replacement during shutdown dia Ø200mm (includes complete dismantling /fixing of new plate, welding, cutting & any small modification works if required)
Replacement of breaker hammer (includes dismantling of hood, cutting, wedling & tightening of bolts, etc., and finishing works to start the plant smoothly)
Repair of cooler grate plate (HRCS casting) Dead grate plate, top dead grate plate, 25mm grate plate, 25mm half grate plate 13mm grate plate 13mm half grate plate & side casting (Includes shifting of grate plate, cutting, welding, , etc.,)
Repair of grate beams (includes adjstment of finger, plate, cutting, welding and grinding)
Replacement of grizzly bars ( (includes dismantling of bars, cutting, wedling etc., and finishing works to start the plant smoothly)
Spare parts Repair/assly work for cooler section
Fabrication of cooler shaft seals fixed and movable including drilling, cutting & grinding)
Repair of cooler carrying wheel bearing assembly
Repair of cooler crankspool shaft assembly
Repair of cooler cross head & crank head assembly
Repair of cooler drag chain idlers includes (replacement of bearng/ housing assembly)
Repair of cooler fan impeller assmebly /actuator for all cooler fans (includes grinding, welding and cutting)
repair of cooler grate bars by cutting
Cooler drag chain conveyor maitenance works during shutdown
Replacement of drag chain links and pins
Replacement of pins
Replacement of guide rollers (assembled condition)
Replacement of head sprocket
Rails Replacement at drag chain conveyor & DPC
Dismantling and Shifting (includes releasing/adjustment of counter weight arrangement, removal of idler, De linking of chains)
Erection and alignment. (includes releasing/adjustment of counter weight, linking of chains, lifting of chains, fixing of idler)
DPC Maintenance works
Replacement of DPC partition plates and fixing.
Replacement / Repair of DPC buckets and alignment
Replacement of rollers and finishing work.
Repair of partition web plate strengthening
Replacement of DPC chains (each 1mtr)
Replacement of curtain chains
Dismantling & shifting works (complete set : 25 nos i.e each nos is 1mtr length chain)
Erection, Fitment, welding and finishing works
Replacement of balls & rings of coal mill
Dismantling & shifting works (Dismantling includes dismantling of Y duct, spider, top ring & bottom ring, balls, throttle ring & fill in balls)
Erection, Fitment, welding and finishing works (includes erection spider, top ring & bottom ring, balls & fill in balls)
Coal mill Internal
Replacement of U bolt
Replacement of scrapper
Replacement of Flap damper
Replacement Feed pipe dia range 600mm to 800mm
Replacement of Y duct Dia 700mm
Replacement of main drive gear box lub oil pump
Fabrication of Y duct
Fabrication of Feed pipe dia range 600mm to 800mm
FK pump screw
Replacement of DE bearing, oil seal(dismantling/fixing of connecting components like shifting of motor, coupling, alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc,)
Replacement of NDE bearing, oil seal
Replacement of mixing chamber
Replacement of FK pump screw (dismantling/fixing of connecting components like shifting of motor, coupling, alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc,)
Replacement of diverter valve (dismantling/fixing of connecting components like shifting works,alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc,)
Cement mill works
Girth gear grease spray pump replacement
Replacement of counter shaft
Dismantling & shifting works
Erection and finishing work.
Replacement of trunion bearing
Dismantling & shifting works
Erection and finishing work.
Replacement of Girth Gear pinion with coupling
Dismantling & shifting works
Erection and finishing work.
Replacement of counter shaft (white metal) bearings
Dismantling & shifting works
Erection and finishing work.
Replacement of main Gear box (K140) and its alignment.
Dismantling & shifting works
Erection and finishing work.
Replacement of (Hopper) Tipper Rails & wheels
Replacement of Cement mill shell liners, Head liners, Diaphragm liners.
Dismantling & shifting works
Erection and finishing work.
Replacement of Coal crusher Hammers
Replacement of coal crusher hammer (includes dismantling of hood, cutting, wedling & tightening of bolts, etc., and finishing works to start the plant smoothly)
Kiln feed/Cement mill/Rawmill air slide cloth replacement W-400 - 700mm
Air slide fabric replacement
Air slide blower impeller replacement
Air slide blower assembly replacement (with motor)
Replacement of Top/bottom box with fabric
Kiln feed/Cement mill/packing plant Chain Bucket Elevator works
U Link replacement
Chain link sets replacement
Buckets Fabrication work.
Buckets Dismantling & Erection
Buckets repair
Head replacement including gearbox, bearing, channels, side supports idlers etc.
Replacement of head drum rim (includes dismantling/ assembly of hood, chain & buckets)
Tail drum replacement includes bearing and housing
Kiln feed/cement mill/Rawmill weighfeeder Maintenance
Belt replacement (Range W 1600 to 2200mm) Ply4 includes dismantling and assemly of side supports, idlers, skirts, hood etc.,
Belt idlers replacement
Replacement of skirts
Head replacement including gearbox, bearing, channels, side supports idlers etc.
Tail drum replacement includes bearing and housing
Belt bucket elevators maintenance Rawmill/Kiln/ Cement mill
Replacement of belt for belt bucket elevator L180mtr (kiln)
Replacement of belt for belt bucket elevator L125mtr (Rawmill)
Replacement of belt for belt bucket elevator L90mtr (Cementmill)
BE bottom drum replacement
BE bottom drum bearing replacement
BE head drum replacement
BE head drum bearing replacement
BE gear box input shaft pinion and gear internal replacement
BE fluid coupling replacement
Replacement of buckets: includes removal/tightening of bucket bolts and buckets
Belt bucket elevator bucket bolts tightening and belt joint bolts tightening includes Top and bottom drums checking of bearings, sleeves tighteness and housings, greasing of bearings, boot cleaning, joint bolts tightness checking etc. during shutdown
Kiln feed/Coal ESP/Rawmill multi cylone/ Rawmill PJBF/ Cooler ESP rotary air lock maintenance
Replacement of rotary airlock
Repairing of RAL vanes
Replacement of NDE bearing in RAL
Replacement of DE bearing in RAL (includes dismantling and fixing of motor and coupling)
Replacement of geared motor
Leakages arresting work at cyclones, Downcomer duct, Feed pipe, Riser duct, tagential portion, cylindrical joint, bends, smoke chamber, V-duct area,MFC & areas of preheater section etc., Welding and patch repair at various elevations coal mill, rawmill/ cementmill, kiln, preheater, cooler, packing plant and LS crusher
welding work height up to 25Mtrs approx
welding work height Above 25Mtrs approx
Patch plate replacement
fixing & removal of fabricated Angle frame or Fabricated Beam frame for holding the bricks in Preheater section
Brick retainer plate (includes 6- 10mm thk plate fabrication and bottom ribs to be provided for support)
Fabrication of beam frame or Angle frame
Preheater Fan/Rawmill fan/Cooler ESP vent fan/PJBF fan/Coal mill fan maintenance work
Replacement of DE bearing, housing & lybrinth seal (includes shifting of motor, alignment works, dismantling/ assembly of coupling, housing, shifting of motor shed & finishing works to start the plant, etc.,)
Replacement of NDE bearing, housing & lybrinth seal
Replacement of coupling
Replacement of fan and motor (includes removal/assembly of casing, expansion joint, dismantling/assembly of motor, alignment works, dismantling/ assembly of coupling, bearing with housing & finishing works to start the plant smoothly , etc.,)
Chain chain conveyor of Cooler ESP/Rawmill/cement mill
Replacement of chain links and pins
Chain coveyor link replacement
chain conveyor head sprocket replacement
chain conveyor tail sprocket replacement
Chain conveyor bearing Head sprocket replacement
Chain conveyor Tail sprocket bearing replacement
Replacement of lift pad
Replacement of Pulley, idler & belts for various size from 650mm to 1200mm of belt conveyor at coal mill/cementmill/packing plant/rawmill
Dismantling and erection of carrying /troughing/impact idlers
Dismantling and erection of return idlers
Conveyor Belt replacement length W650mm to 1200mm
Replacement of Head drum with coupling (includes dismantling and fixing of coupling
Replacement of Tail drum pulley includes release and adjustment of counter weight arrangement
Head,/ tail,/ snub,/ bend pulleys bearing checking and greasing
Head,/ tail,/ snub,/ bend pulleys bearing replacement
Replacement of Snub pulley / bend pully includes release and adjustment of counter weight arrangement) Size range Dia: 600mm - 800mm
Gulletin dampers, recirculation damper, coal mill inlet louver dampe, TAD duct damper, Rawmill K, J & F Damper
Dismantling & shifting works (shifting work includes height above 25 mtrs)
Dismantling & shifting works (shifting work includes height up to 25mtr)
Erection, Fitment, welding and finishing works
Shifting/lifting/lowering of materials (i.e cylinders. Plates, equipment spares, lubricants, Gearbox,motors,screw flight,airslide boxes,airslide blowers, (Below 5MT)in all sections.
Stores to workplace ( Ground floor) includes to and fro
Shifting of material from Ground floor to 30 Mtrs includes to & fro
Shifting of material from above30 Mtrs includes to & fro
Replacement of various sizes of Gearboxes/Motors/any machinery items etc. (any size) with alignment at any elevation in all sections
Dismantling and Shifting
Erection, Alignment and finishing work.
Structural & Plate work like ducts, hoppers, chutes, Hood, Hood liners, hopper liners, bends, base frames,platforms,walkways,Safety guards,Shed, Roofing etc, in all sections.
Material Shifting and dismantling
Fabrication
Erection
Roofing/side cladding
Skirts replacement
Coal mill Reversible screw conveyor, Coal ESP Screw conveyor, Prefeeder screw conveyor for kiln & MFC, GCT screw conveyor, cement mill screw conveyor,
Replacement of screw dia range 300mm to 400mm (Includes shifting, lowering and lifting of screw, dismantling and assembly of gearbox, bearing , bearing housing (DE & NDE side), motor and coupling, finishing works to start the plant smoothly.
Replacement of geared motor (Includes dismantling/fixing of connecting components like shifting of motor, coupling, alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc.,
Replacement of DE bearing, housing (dismantling/fixing of connecting components like shifting of motor, coupling, alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc,)
Replacement of NDE bearing, housing finishing works to start the plant smoothly , Etc.,
Coal/Rawmill Reclaimer
Replacement of Gear box input or output oil seal includes motor alignment and bed leveling work shifting of motor shed & finishing works to start the plant,etc.,
Replacement of reclaimer showel buckets
Replacement of chains (each 1mtr) Pitch 315mm
Scrapper chain rollers replacement
Harrow drive sprocket replacemet
Harrow chain guide roller replacement
Harrow drive sprocket bearing replacement
Harrow drive chain replacement
Harrow wheel replacement
Travel drive guide roller replacement
Harrow guide roller (top/bottom) replacemet
Travel drive wheel replacement
Travel Bogie guide roller replacement
Travel bogie wheel replacement
Reclaimer bogie rerailment and alignmnet work
Replacemet of reclaimer head wheel assembly (including dismantling and assembly of gearbox, supporting jigs, cutting, welding, chain links, rollers, removal /assembly of showel buckets) /
Replacement of reclaimer of tail wheel assembly (including dismantling and assembly of supporting jigs, cutting, welding removal /assembly of showel buckets)
Replacement of guide wheel assembly (including dismantling and assembly of sprocket shaft assly, supporting jigs, cutting, welding, chain links, rollers, removal /assembly of showel buckets )
Replacement of head/tail/guide wheel sprocket segment/rim assembly only(including dismantling and assembly of supporting jigs, cutting, welding, chain links, rollers, removal /assembly of showel buckets )
Spare parts Repair/assly work in all sections
Apron feeder/ Alind conveyor/ spillage conveyors return rollers assembly/repair. ( welding build up) ( machining will be done at CCI work shop)
Stacker/Reclaimer Bogie guide rollers, shafts repair build up, assembly work ( machining will be done at CCI work shop)
Stacker wheels repair, build up grinding, assembly work
Stacker wheels welding build up and grinding
Fabrication of reclaimer showel buckets
Guide rollers return rollers welding build up
Welding build up of guide rollers, wheels, shafts etc
Welding build up of reclaimer wheels, shafts etc
Repair of belt conveyor brackets
Repair of reclaimer brackets, assembly of brackets with rollers
Welding build up of worn out pulleys, shaft of pulleys, fans or any other rotary equipment
Fabrication of SS flaps (3-1, 3-2, 2-1 & 2-2) (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work, Dismantling of distance piece, expansion joint, cutting, grinding, welding supports, jigs, finishing works to start the plant, etc.,)
Fabrication of Dsipersion /tongue plate
Preparation of inlet & outlet spring plate (includes drilling, cutting & grinding works)
Fabrication of retainer
Overhauling/repair of gear boxes below 200 HP
Dismantling, repair of internals, Assembly including bearings, gears, seals, coupling, sprocket etc.,(Machining will be done CCI W/shop)
MALABAR CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .