| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹2.1 L (1.32%)Rejected-AOC | ₹1.6 Cr+₹2.1 L (1.32%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.6 Cr+₹4.8 L (3.05%)Rejected-AOC | ₹1.6 Cr+₹4.8 L (3.05%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.7 Cr+₹8.5 L (5.38%)Rejected-Finance | ₹1.7 Cr+₹8.5 L (5.38%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.7 Cr+₹9.3 L (5.94%)Rejected-Finance | ₹1.7 Cr+₹9.3 L (5.94%) | L5 | Rejected-Finance L5 |
Tender Value
₹1.8 Cr
EMD Value
₹50,000
Closing Date
22 Aug 2019, 4:00 pmClosed
SE CC Aluva
O/o the SE CC Aluva
Earth work, cc forlevelling course ,M15 for foundation and s/s for DR RW , CC RW and culvert extension ,HYSDreinforcements,M25 RCC for deck slab extension ,parapets including painting for all structures
2019_PWD_292351_1
PWD/19-20/1099Munnar Kumily Santhanpara section
Open Tender
Civil Works - Roads
Item Rate
180 days
Santhanpara
Please refer Tender documents.
8 documents required · 8 mandatory
₹6,508
Yes
online
₹50,000
Yes
28 Feb 2020
9 Aug 2019
27 Aug 2019
9 Aug 2019
22 Aug 2019
9 Aug 2019
Amount
EARTH WORK
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000mExcavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
FOUNDATION AND SUPER STRUCTURE
od14141/2019_2020 : Dry rubble masonry for retaining walls using blasted rubble size below 40 dm3 including wedging them tightly with chips including all cost and conveyance of materials, labour charges etc. complete
od14157/2019_2020 : Dry rubble masonry for retaining walls (using departmental rubble) size below 40 dm3 including wedging them tightly with chips including all cost and conveyance of materials, labour charges etc. complete
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
14.1B.1.1.A : Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing and Technical Specification. <br> For solid slab super-structure - Height upto 5mFurnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height upto 5m
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.B.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M20<br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20
8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
od14819/2019_2020 : PVC WEEP HOLES- Providing weep holes using 110mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
k.c saju
ANISHZACHARIAH
Sony Joseph
MANESH JACOB
K.H Aliyar
SABARI CONSTRUCTIONS
Binu A.S
MOHANAN.N.V
Bidder Name
Binu A.S
k.c saju
MOHANAN.N.V
K.H Aliyar
SABARI CONSTRUCTIONS
Sony Joseph
ANISHZACHARIAH
HASSAN KUNHI T.D
MANESH JACOB
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_398408.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .