Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
17 Aug 2020, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGMCOM
INOD NAVAL DOCKYARD SBS ROAD MUMBAI
REPLACEMENT OF OILY WATER SEPARATOR (MAKE TMPB-5, SKF MARINE) QTY- 02 NOS ONBOARD INS MUMBAI.
2020_NAVY_363790_1
DYT/RAC/20-21/106(A)/PL-IN /INS MUMBAI-OWS/037
Single
Marine Services
Item Rate
540 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.2 L
Yes
NAVAL DOCKYARD MUMBAI
18 Aug 2020
24 Jul 2020
18 Aug 2020
24 Jul 2020
17 Aug 2020
7 Aug 2020
7 Aug 2020
180 days
Amount
Degutting and Removal of OWS (2 Nos.): Dismantle Bilge/SW line and Air line from valves connected to reservoir.
Disconnect electrical supply cable/system cable from PPM control panel.
Degut foundation for removing Water bowl (By Hot work).
Remove pump unit with Gear Box and detach Hoses.
Remove PPM Control panel with electrical accessories.
Transportation and shifting of OWS system: Dismantling of equipment for transportation at shop floor.
Transportation of complete assembly from shop floor to ship.
Shifting of assembly to foundations at Aft and Fwd engine room.
Re- assemble complete system for fitment/installation.
Removal and fabrication/modification of foundations for fitment: Degutting and removal of existing foundation for Main system, Bilge pumps and control panels.
Preparation / modification of foundation for fitment of main system.
Fabrication of foundation for Bilge pump units at Aft & Fwd ER.
Structural modification for fitment of control panels at Aft & Fwd ER & MCR.
Removal and fitment of hatch of Aft & Fwd engine room to allow access of OWS inside the compartment.
Fitment of OWS system with complete assembly and integration with new system: Fitment of main assembly with accessories at Fwd & Aft engine room.
Removal and reconnection of Bilge pump with motor at Fwd Engine room.
Removal and reconnection of Bilge pump with motor at Aft Engine room.
Removal and reconnection of control panels at both engine room.
Removal and reconnection of local control panels for pump at Fwd ER & Aft ER.
Removal and reconnection of remote control panels at MCR.
Removal and reconnection of pneumatic inlet 3-way valve for control of feed line at Aft & Fwd ER.
Reconnection for integration of new system and laying out cable (Supply/Control cable, Length-715 Mtrs) for complete system: Removal of cable gland at bulkhead for removing old cables.
Reconnection of existing cable from system to all control panel/distribution box.
Re-routing of refurbished cable through gland and securing at cable tray: 4 Core cable.
4 core cable.
3 Core Cable.
5 Core Cable.
12 Core Cable.
18 Core Cable.
25 Core Cable.
Repack cable gland for pressure testing.
Termination of all power cable and control cables.
Inspection and blow through/pressure testing of pipe lines(295 Mtrs) and refitment : Inspection of defective pipe lines from suction to main system, system to overboard, system to ER bilge and system to sludge tanks.
Refitment of pipe lines for blow through and pressure testing (1.5 times of operating pressure)
Serviceability check of valves, Strainers and foot valves on pipe lines : Serviceability check of valves and strainers on system lines.
Inspection and refitment of 1 in no. Busket strainer at Fwd ER as necessary.
Inspection and refitment of 1 in no. Busket strainer at Aft ER as necessary.
Inspection and refitment of 13 in nos. foot valves on suction lines as necessary.
Modification and Fitment/Installation of safety devices for operation system: Relocation and fitment of Air Eliminator.
Relocation and fitment of pressure relief valve on suction line.
Modification and refitment of flow indicator on suction line.
Modification and refitment of sight glass on suction line
Modification and refitment of vacuum breaker on suction line.
Installation of overboard 3 way valve on system assembly.
Refitment of NR stop valve on suction line.
stage.html
html • 0.02 MB
finance_406066.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .