Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.1 LAccepted-Finance | 1 | Accepted-Finance ok | |
| 2 | 2₹42.2 L+₹2.2 L (5.42%)Accepted-Finance | 2 | Accepted-Finance ok | |
| 3 | 3₹50.6 L+₹10.5 L (26.2%)Accepted-Finance | 3 | Accepted-Finance ok |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
28 Apr 2021, 2:00 pmClosed
Superintending Engineer
S E ECTC SLDC Campus UPPTCL Lucknow
Construction of 2 No 132 KV Oyal Gola Double Circuit Line bay and 132 KV Phardhan Gola TSS bay at 220 132 33 KV Sub Station Gola
2021_UPCTL_572863_1
117/ECTC(L)/2020-21
Open Tender
Civil Works
Item Rate
90 days
S E ECTC SLDC Campus UPPTCL Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
Yes
Ex. En. ECTD-I,Lucknow
₹1.2 L
Yes
5 Jun 2021
20 Mar 2021
30 Apr 2021
20 Mar 2021
28 Apr 2021
22 Mar 2021
Amount
Boring holes 3.5 M deep below cut off Level for 300 mm Dia pile bore in all types of strata including loose sandy strata under water requiring use of modified auger and cutting tools with gravity valves and removable casing pipe, if required, for proper completion of work with cost of all labour, material, T&P required. ( CSI 21.01b)
As in item no. 1 but for 400 mm Dia pile bore.( CSI 21.01c)
Extra for every additional depth of boring work for 300 mm dia pile bore as described in item No.1 above but beyond 3.50 Metre below the cut off level. (CSI No. 21.03b)
As in item no. 3 but for 400 mm dia pile bore.( CSI 21.03c)
Cutting the bore hole for providing under ream of 2.5 times the dia. of pile upto 3.50 metre below the cut off level for 400 mm dia pile, including cleaning the bore hole and including cost of all materials, labour and T&P etc. as may be required for proper completion of work.( CSI 21.02c)
Cutting the bore hole for providing under ream of 2.5 times the dia. of pile beyond 3.50 metre below the cut off level for 300 mm dia pile, including cleaning the bore hole and including cost of all materials, labour and T&P etc. as may be required for proper completion of work.(CSI 21.04b)
As in item no 6 but for 400 mm dia pile. (CSI 21.04c)
Providing and filling bentonite solution in pile bore under unstable and/or high water table soil conditions for retaining shape of bore 5 Kg of bentonite will be used in 100 Lt. clear water (Bentonite solution shall be used with continuous process of cirulation) including all material , labour , T&P etc. The measurement shall be done as per design dia. & depth of pile upto cut off level. (CSI No. 21.05)
Supply and fabrication of M.S. (tor) reinforcement cages for piles including cutting, bending, welding as per design and placing of the cage in the pile bore including cost of all material, labour,and T&P etc. as may be required for proper completion of the work including all incidental wastage.(CSI No. 21.06)
R.C.C. work with cement, approved coarse sand 2cm gauge approved stone ballast in 1:1.5:3 proportion for concreting in all type of piles including labour and material for proper completion of the work. Measurement of work be done according to design diameter and depth of pile upto cut off level. Under reamed concrete shall be measured as per IS 2911 Part-II.(CSI 21.08)
Extra for concreting in bore holes filled with water or bentonite solution (Bore under loose unstable/under water) by displacement method, using tremie pipe and including cost of 10%extra cement required over Normal 1:2:4 mix including cost of all labour & T&P etc. as may required for proper complete work. (CSI No. 21.09)
Cutting & chipping the 300 mm dia pile top above the cut off level including bending & straightening the pile reinforcement as directed including cost of al materials, labour & T&P etc as may be required for completion of the work. (CSI No. 21.11b)
As in item no. 12 but for 400 mm dia pile top.(CSI 21.11c)
Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (CSI No. 4.01)
Sand filling in plinth including supply of necessary quantity of local sand from outside the UPPCL premises including watering, dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of work. (CSI No. 4.05)
Earth filling under floors and/or sub station area including cost of earth when obtained from with in 8 km outside UPPCL area including its roylaty and carriage including watering, ramming in 20 cm layers and dressing of earth etc. all complete.(CSI No. 4.10)
Concrete with 4cm gauge I class brick ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundations and under floors including supply of all materials, labour and tools and plants etc. required for proper completion.(CSI No.5.01)
Concrete with 4cm gauge stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 8:4:1 in foundation & under floors including supply of all materials, labour & T&P etc. complete. (CSI no. 5.04a)
Concreting of 40 mm thick RCC trench covers in mild steel frame work with RCC 1:1.5:3 in Cement,Chopan coarse sand (F.M. 1.8 to 2.5) and 2cm gauge graded hard stone ballast with 3mm thick floating coat of neat cement finish on top of cover complete with all labour, materials and placing the same in proper position at required location of cable trench within the substation area. (CSI No. 5.18)
Cement concrete with 2cm gauge approved hard stone ballast, coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 3:1.5:1 including supply of all materials, labour,side shuttering if required and T&P etc. required for proper completion of work (CSI No. 5.21)
RCC work with cement, approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 in slab, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P (CSI No. 5.24)
RCC work with cement, approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3 in raft foundation and footings , excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27)
RCC work with cement approved coarse sand (F.M. 1.8 to 2.5) and 2 cm gauge graded approved hard stone ballast like granite, quartzite etc. from Dalla, Jhansi or other quarries, in proportion 1:1.5:3 in RCC pile caping, gantry walls/column foundations and RCC pedestals., excluding supply of reinforcement and its bending but including its fixing and binding the same with binding wire and including cost of all materials, binding wire, labour and T&P etc. required for proper completion of the work.(CSI No. 5.28)
First class brick work in 1:6 cement and coarse sand (F.M.1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01)
First class brick work in 1:6 cement and coarse sand(F.M. 1.8 to 2.5) mortar in super structure for walls of one brick thickness.( CSI 6.01+6.07+6.08)
First class brick work in 1:4 cement and coarse sand (F.M. 1.8 to 2.5) mortar in foundation and plinth including supply of all materials, labour & T&P etc. required for proper completion of work. (CSI No. 6.03)
Mild Steel or Iron work in heavy sizes such as trusses built up gates, door frames, record, racks roof work gates etc. wrought to required form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor.(CSI No. 9.01)
TMT/Tor steel in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor)(CSI No. 9.03)
Supply of 28 mm. dia M.S. Anchor bolts (conforming to IS 266) 900 mm. long with base plate (75x75x6mm) welded with anchor bolts including its threading upto a length of 10cm. and also supply of a pair of galvanized standard nuts with threading including supply of 5 mm thick washer and cost of labour, material & T&P for proper completion of work.(CSI No. 9.12)
Fixing and grouting 32/28 mm bolts in proper alignment level and setout with help of a template complete including supply of all labour & T&P etc. required for proper completion of the work.(labour rates only) . (CSI No. 9.13)
Supply of 25 mm dia.M.S. Anchor bolts (conforming to IS-226) 500 mm long with base plate(50x50x6 mm)welded with anchor bolts,including its threading upto a length of 10cm. and galvanizing upto 15cm from top, also supply of a pair of galvanized standard nuts with threading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.14)
Fixing and grouting 25 mm dia M.S. Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (labour rates only) .(CSI No. 9.15)
Providing M.S. Frames work, rack etc for R.C.C. Trench covers and edging with M.S. angles and M.S reinforcement including cutting, bending and welding as per approved drawing. The rate is including cost of all labour, materials etc. as required for proper completion of the work. (CSI No. 9.20)
Fixing and grouting of trench edging in proper level and alignment including cost of all labour, and T&P etc. required for proper completion of the work but excluding cost of C.C. (labour rates only) . (CSI No. 9.30)
Fixing of template in position level and alignment for grouting of Anchor bolt in main gantry (labour rate only). (CSI No. 9.31)
Same in item 35 above but for auxiliary structure. (labour rate only). (CSI No. 9.32)
Fixing of cable trench racks in proper position and alignment including cost of all labour, material and T&Petc. required for proper completion of the work (Labour rate only).(CSI No. 9.33)
12 mm thick plaster with cement mortar consisting of one part of cement & four part of coarse sand (1:4), minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work. (CSI No. 11.07)
Providing (12x15) mm section groove in plaster including all material, labour and T&P etc. required for proper completion of the work.(CSI No. 11.16)
6 mm. thick plaster with 1:3 cement & coarse sand including labour, materials & T&P etc. required for proper completion of the work.(CSI No. 11.17)
Champering the edge of concrete in auxiliary structure, of size 25 mm wide in triangular section including all materials, labour & T&P etc complete. (CSI No.11.18)
3 mm thick floating coat of neat cement finish including supply of all materials,labour and T&P etc. required for proper completion of the work.( cement consumption 0.044 bag/Sq.m.) (CSI No. 11.20)
2.5 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work.without base PCC (CSI No. 12.02)
4.0 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand & 2cm graded approved stone ballast laid in panels finished with 3mm floating coat of neat cement or cement and marble dust in ratio of 5:1 as specified and removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all materials, labour and T&P etc, required for proper completion of the work.without base PCC (CSI No. 12.04)
Straight over burnt bricks on edge floor laid dry, joints sand filled, including preparation of base to proper slope and its ramming including supply of all material labour & T&P etc. required for proper completion of the work. (CSI No. 12.09)
Painting or varnishing new iron work in small areas or new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mix paint "Luxol" or equivalent brand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01)
As in item 46 above but for every coat after first coat. (CSI No. 13.02)
Painting letters & number over cable trench cover or other places with the help of stencils including painting of base of 150 mm. dia of one coat of primer and two coats of superior quality synthetic enamel paint size of letter to be 60 mm. x 10 mm. including cost of all materials labour and T&P etc. required for proper completion of the work including placing of Trench covers in required position. (CSI No. 13.28)
Laying cement concrete road slab consisting of 1 part cement 1.5 part approved coarse sand and 3 part approved 20 mm down graded stone aggregate over prepared sub grade after its rectification and bringing it to proper camber and shape and making good to the satisfaction of E/I inclduing cost of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.13)
Filling of 20 mm. wide 100/150 mm. deep joint with coarse sand and saw dust mixed with hot bitumen etc. complete including supply of all materials, labour and T&P etc. required for proper completion of the work. (CSI No. 18.14)
HANUMANT CONSTRUCTION
M/S JAI MAA CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .