Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC First lowest |
| 2 | L2₹2.1 Cr+₹11.6 L (5.98%)Rejected-Finance | ₹2.1 Cr+₹11.6 L (5.98%) | L2 | Rejected-Finance Second lowest |
| 3 | L3₹2.1 Cr+₹11.7 L (6.06%)Rejected-Finance | ₹2.1 Cr+₹11.7 L (6.06%) | L3 | Rejected-Finance Third lowest |
| 4 | L4₹2.1 Cr+₹14.4 L (7.46%)Rejected-Finance | ₹2.1 Cr+₹14.4 L (7.46%) | L4 | Rejected-Finance Fourth lowest |
Tender Value
₹2.1 Cr
EMD Value
₹1 L
Closing Date
28 Oct 2020, 5:00 pmClosed
District Soil Conservation Officer, Alappuzha
District Soil Conservation Office, District Panchayath building, Third floor, Collectrate PO, Alappuzha
Retaining wall, Deepening of thodu, Farm bund
2020_DSSC_390621_1
C(2)909/2019-6
Open Tender
Civil Works - Others
Item Rate
365 days
Pattanakkad panchayath, ward 10, 14
Please refer Tender documents.
6 documents required · 6 mandatory
₹7,500
online
₹1 L
16 Feb 2021
9 Oct 2020
30 Oct 2020
9 Oct 2020
28 Oct 2020
9 Oct 2020
9 Oct 2020 - 28 Oct 2020
Amount
Retaing wall -2.50m height, 1715 Rm
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil - for side cutting
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for first lift, In or under water - for side cutting & foundation
60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement :6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level with cement mortar 1:6
13.2.1 15mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement : 4 fine sand)
Deepening of thodu 2.50m wide, 520 Rm length.
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for first lift, In or under water
Deepening of Thodu 3.0m wide, 1500m length
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil for first lift, In or under water
Farm bund 312.50 Rm
OD Banking gravel in layers not exceeding 20 cm in depth, breaking clouds, watering, rolling each layer with1/2 tonne roller or wooden or steel rammers and rolling every 3rd and top most layer with power roller of minimum 8 tonne and dressing up, in embankments of roads, flood banks, marginal banks and guide bank etc lead up to 50m and lift up to 1.50m.
MP.Sigikumar
R.SABU
George Mathew
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_555658.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .