Loading…
Loading…
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
16 Oct 2026, 6:00 pm
Executive Engineer Sipu Project Division, Palanpur
ERM Work For Branch Canal From Ch.0.00 Km to 6.50 Km of Sipu Main Canal
348837
Notice No : 15 of 2026-27
Open
Civil Works - Canal
Works
Banaskantha
5 documents required · 5 mandatory
₹3,600
Executive Engineer Sipu Project Division Palanpur
₹2.7 L
24 Sept 2026
24 Sept 2026
24 Sept 2026
16 Oct 2026
24 Sept 2026
BILL OF QUANTITIES
Name of Work :- ERM Work For Branch Canal From Ch.0.00 Km to 6.50 Km of Sipu
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
1 Jungle clearance of specified category and bushes for
canal/dam work as directed with disposing materials
etc. complete. (Excluding tree of girth above 0.5 Mt.)
(c) For Medium Dence
2 Excavation in all sorts of soil (including wet and
slushy condition of soil) with yellow, sandy, gravelly
soil including soft murrum & H.M. including sorting &
stacking and depositing the excavated stuff in uniform
layers as and where directed upto lead of 30 m and lift
as shown below including clearing the site etc.
compute (including dewatering). (B) For foundation
trenches of C.D. work (a) 0 to 3 Mt. depth
3 Removing the damaged precast CC block lining
including breaking the joints, removing the same
sorting and stacking of useful and unuseful material
from the dismentalled material upto lead of 200 mt.as
directed under detail specification etc. complete.(a)
Up to 7.50cm thick
4 Providing and laying foundation concrete of
proportion as under by using cement, sand and
machine crushed course aggregate laid in situ
including necessary temping, smooth finishing,
watering and curing as directed with all leads and lifts
etc complete. (a) PCC 1:3:6
5 Providing & laying 7.50 cms thick cast in situ C.C. 1:2:4
grade with the use of crushed aggregates for canal ling
works incl. use of all equipments, scaffolding,
centering form work etc, with finishing as required to 37878.00 Sq.Mtr. 344.100
the exposed surface, making asphalt joints as directed
& watering & curing (without sleepers) with all lead
and lifts etc. complete.
6(a) Providing and laying CC 1:2:4 grade using cement,
sand & crushed metal incuding providing & erecting
necessary form work, centering, vibrating, smooth 627.00 Cu.M. 4873.400
finishing, watering & curing as directed with all leads
& lifts etc. complete. (a) Sub structures
6(b) (b) Super strucutres 1317.00 Cu.M. 5053.100
7 Providing and laying HYSD/TMT Fe-415,500D steel
bar reinforcement for R.C.C. works and anchor bars
with providing binding wires including cutting,
bending, welding, binding in position, hooking, placing
in position with all leads & lifts etc. complete. (c) TMT
8 Clearing silt from canal /drain bed by digging the
same to the required bed level and gradiant including
depositing the excavated earth regularly in spoil bank
for utilising the same for preparing the bund after 6570.00 Cu.M. 177.500
breaking clods as and where directed for lead up to
200 Mt. & lift upto 3.0 as under (Excluding weed
cutting).(b) For canal 20 to 250 Cusecs
9 Earth work in embankment from borrow pits in all
sorts of soil and soft murrum or other suitable strata
Item Description of Item (with brief specification Quantity Unit Rate In Amount
No and reference to book of specifications) figures
as directed including breaking the clods and dressing
to the design sections including cutting the proud
section with lead as under and all lift including site
clearing etc. complete. (c) 200 to 1000 Mt.(A) For All
10 Dry rolling of earth work with light rollers (upto 2 ton
capacity) as directed with all lifts etc. complete.
Rupees Two Crore Sixty Five Lakh Seventeen Thousand Two Hundred Forty Nine Paise Forty
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1. The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of
original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Sr. Divisional Accounts Officer Executive Engineer
Sipu Canal Sub Div. No 2 Sipu Project Division Sipu Project Division
Dantiwada Palanpur Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Nivida No-15 of 2026-27 (Gujarati-English) F.pdf
SBD SBC Ch.0.00 Km to 6.50.pdf
BOQ SBC Ch.0.00 Km to 6.50.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .