| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC H NO 266 V P O PILKHANI DISTT AMBALA 133104 | AMBALA | HARYANA | 133104 | ₹25.4 L Quoted ₹25.6 L | L1 | Accepted-AOC AOC |
| 2 | L2₹55.5 LRejected-Finance | ₹55.5 L | L2 | Rejected-Finance Rejected being |
| Sl No | Description | Qty | Unit | M/S Gurpreet Singh L1 | PRATIBHA ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismentling of brick work built in cement mortar or cement lime mortar including all quoins, arches, pillar, etc. but excluding ashlar facing, dressed stone work and precast concrete articles complete, all as specified and as directed by the Engineer-in-Charge. | 23 | Cubic metre | 100 ₹2,300 | 177 ₹4,071 |
| 2.00 | Material and labour for brick work with sub class 'B' old size bricks straight or curved on plan exceeding 6 metre mean radius built in cement mortar (1:6) complete, all as specified and as directed by the Engineer-in-Charge. | 20 | Cubic metre | 2,300 ₹46,000 | 4,777 ₹95,540 |
| 3.00 | All as per serial item No. 02 here in befor but except bricks old serviceable bricks obtained from serial item No 01 above including removing motar, cleaning the bricks with water, complete all as specified and as directed by the Engineer-in-Charge. | 3 | Cubic metre | 2,000 ₹6,000 | 4,777 ₹14,331 |
| 4.00 | Taking down cement or cement lime plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key scrubbing down with water, etc. complete all as specified and as directed by the Engineer-in-Charge | 2,000 | Square metre | 10 ₹20,000 | 47 ₹94,000 |
| 5.00 | Material and labour rendering 15 mm thick (in patches not exceeding 03 sqm each) on brick work or concrete wall surfaces in cement mortar 1:4 including mixing water proofing compound @ 2% by weight of cement or as per manufacturer's instruction and finished fair and even without using extra cement complete all as specified and as directed by the Engineer-in-Charge. ( Note- The cost of providing WPC shall be measured paid for seperately) | 450 | Square metre | 100 ₹45,000 | 327 ₹1.5 L |
| 6.00 | Supply only integral water proofing compound,complete all as specified and as directed. | 83.5 | Kg | 22 ₹1,837 | 177 ₹14,779.50 |
| 7.00 | Material and labour for rendering 15 mm thick on any faces of brick work or concrete wall surfaces in cement mortar (1:6) and finishing the surface even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge. | 450 | Square metre | 100 ₹45,000 | 327 ₹1.5 L |
| 8.00 | Material and labour for rendering 10 mm thick on fair faces of brick work or concrete ceiling surfaces, chajjas, etc. in cement mortar 1:3 and finished even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge. | 150 | Square metre | 100 ₹15,000 | 327 ₹49,050 |
| 9.00 | Material and labour for rough cast plaster complete as specified in SSR Part-I, clause 14.22 shall consisting of following:- firstly apply under coat in cement mortar 1:4 not less than 10 mm thick and while still it is in plastic state the rough cast mixture consisting of crushed stone or fine stone aggregate of size between 6 to 12 mm as per the texture required mixed with coarse sand and cement in the ratio 1:1:1 shall be applied, complete all as specified and as directed by the Engineer-in-Charge. | 1,050 | Square metre | 120 ₹1.3 L | 377 ₹4.0 L |
| 10.00 | Material and labour for preparation of new plastered/unplastered surfaces of walls, chajjas, roof projection, etc. and applying two coats of cement base paint over a coat of chalk whitening primer complete all as specified and as directed by the Engineer-in-Charge. | 1,500 | Square metre | 14 ₹21,000 | 37 ₹55,500 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
13 Apr 2026, 6:00 pmClosed
GE (N) AMBALA CANTT
GE (N) AMBALA CANTT
CA NO GE(N)AMB-67/2025-26 PERIODICAL SERVICES TO OTM ACCN IN SECTOR A OF AGE B/R-II (NORTH) UNDER GE (N) AMBALA CANTT
2026_MES_748987_2
GE(N)/AMB-67/2025-26
Open Tender
Civil Works
270 days
GE (N) AMBALA CANTT
As per tender document
9 documents required · 9 mandatory
₹500
GE(N) AMBALA CANTT
₹70,000
Yes
6 Jun 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
13 Apr 2026
6 Apr 2026
30 Mar 2026 - 6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Dismentling of brick work built in cement mortar or cement lime mortar including all quoins, arches, pillar, etc. but excluding ashlar facing, dressed stone work and precast concrete articles complete, all as specified and as directed by the Engineer-in-Charge. | - | Cubic metre | - | - | |
Material and labour for brick work with sub class 'B' old size bricks straight or curved on plan exceeding 6 metre mean radius built in cement mortar (1:6) complete, all as specified and as directed by the Engineer-in-Charge. | - | Cubic metre | - | - | |
All as per serial item No. 02 here in befor but except bricks old serviceable bricks obtained from serial item No 01 above including removing motar, cleaning the bricks with water, complete all as specified and as directed by the Engineer-in-Charge. | - | Cubic metre | - | - | |
Taking down cement or cement lime plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key scrubbing down with water, etc. complete all as specified and as directed by the Engineer-in-Charge | - | Square metre | - | - | |
Material and labour rendering 15 mm thick (in patches not exceeding 03 sqm each) on brick work or concrete wall surfaces in cement mortar 1:4 including mixing water proofing compound @ 2% by weight of cement or as per manufacturer's instruction and finished fair and even without using extra cement complete all as specified and as directed by the Engineer-in-Charge. ( Note- The cost of providing WPC shall be measured paid for seperately) | - | Square metre | - | - | |
Supply only integral water proofing compound,complete all as specified and as directed. | - | Kg | - | - | |
Material and labour for rendering 15 mm thick on any faces of brick work or concrete wall surfaces in cement mortar (1:6) and finishing the surface even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge. | - | Square metre | - | - | |
Material and labour for rendering 10 mm thick on fair faces of brick work or concrete ceiling surfaces, chajjas, etc. in cement mortar 1:3 and finished even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge. | - | Square metre | - | - | |
Material and labour for rough cast plaster complete as specified in SSR Part-I, clause 14.22 shall consisting of following:- firstly apply under coat in cement mortar 1:4 not less than 10 mm thick and while still it is in plastic state the rough cast mixture consisting of crushed stone or fine stone aggregate of size between 6 to 12 mm as per the texture required mixed with coarse sand and cement in the ratio 1:1:1 shall be applied, complete all as specified and as directed by the Engineer-in-Charge. | - | Square metre | - | - | |
Material and labour for preparation of new plastered/unplastered surfaces of walls, chajjas, roof projection, etc. and applying two coats of cement base paint over a coat of chalk whitening primer complete all as specified and as directed by the Engineer-in-Charge. | - | Square metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_849737.xls
BOQ • 3.39 MB
Tenderdocument.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid