| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.7 LAccepted-AOC | L-1 | Accepted-AOC LOW RATE | |
| 2 | L-2₹2.1 L+₹6,419 (3.21%)Rejected-Finance | L-2 | Rejected-Finance HIGH RATE | |
| 3 | L-3₹2.1 L+₹9,165 (4.58%)Rejected-Finance | L-3 | Rejected-Finance HIGH RATE |
Tender Value
₹1.7 L
EMD Value
₹2,200
Closing Date
2 Sept 2024, 5:00 pmClosed
ACE PB AREA
PB AREA
Renovation of Switch Room in Gopalichak weighbridge Gopalichak colliery under PB Area
2024_BCCL_315658_1
GM/PBA/ACE/ENIT/24-25/34 DT 22.08.2024
Open Tender
Civil Works - Buildings
Item Rate
10 days
GOPALICHAK
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,200
27 Jan 2025
22 Aug 2024
4 Sept 2024
23 Aug 2024
2 Sept 2024
23 Aug 2024
23 Aug 2024 - 28 Aug 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Brick work in clay flyash (1:6) F&P
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Brick work in clay flyash (1:6) S:S
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
12 mm cement plaster of mix 1:6 (1 cement: 6 fine sand)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars
P/F/F AC sheet
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete 40 mm thick with 20 mm nominal size stone aggregate
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Colour washing such as green, blue or buff to give an even shade New work (two or more coats) with a base coat of white washing with lime
Total impact of GST for the purpose of CTC
JAGJEET SINGH CHAWLA
Sanjiv kumar sinha
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_327124.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .