Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.0 L
EMD Value
₹1.3 L
Closing Date
7 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DDC MANDI PARISHAD MEERUT
DDC MANDI PARISHAD A-3 DAMODAR COLONY GARH ROAD, MEERUT
Reconstruction/repair of the damaged rear boundary wall, including painting, construction of a boundary wall for the office campus construction of one toilet within the office building and covering the open courtyard area at NMY Sardhana
2026_RKUMP_1208265_1
2026/BOUNDARY WALL/MANDI SARDHANA
Open Tender
Civil Works
Percentage
90 days
SARDHANA MANDI
Reconstruction/repair of the damaged rear boundary wall, including painting, construction of a boundary wall for the office campus construction of one toilet within the office building and covering the open courtyard area at NMY Sardhana
3 documents required · 3 mandatory
₹2,360
DDC MANDI PARISHAD MEERUT
₹1.3 L
Yes
DDC MANDI PARISHAD MEERUT
16 Nov 2026
16 Nov 2026
8 Dec 2026
16 Nov 2026
7 Dec 2026
16 Nov 2026
21 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordenary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavted earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-incharge upto a distance of 30 m from the foundation trenches (where machine can not move) SI No.251 | 36.37 | CUM | 90 | ₹3,273.3 |
| 2 | Concrete with 4 cm gauge brick ballast fine sand of 1;2 FM and cement in proportion of 12:6:1 in foundation and under floors i/c supply of all materials, labour and T& etc required for proper completion of the work (SI 273) | 6.76 | CUM | 2,930 | ₹19,806.8 |
| 3 | R.C.C. work with cement approved coarse sand and 4cm. Gauge approved stone grit in proportion of 1:2:4 in raft foundation and footing with 4 cm. gauge stone ballast and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by thye contractor free of cost. SI No.287 | 9.19 | CUM | 5,830 | ₹53,577.7 |
| 4 | RCC work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in column excluding supply of reinforement and its bending, but inclduign its fixing and binding the samd with 24 BWGGI binding wire and including necessary centering and shuttering tec. and supply of all materials, labour tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SI No. 284A) | 32.13 | CUM | 7,300 | ₹2,34,549 |
| 5 | RCC work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in Beam excluding supply of reinforement and its bending, but inclduign its fixing and binding the samd with 24 BWGGI binding wire and including necessary centering and shuttering tec. and supply of all materials, labour tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SI No. 283) | 7.01 | CUM | 6,360 | ₹44,583.6 |
| 6 | MS (Tor Steel) in plain work such as RCC or RB work wrought to required shahpe as necessary including bending for proper completion of the work and i/c supply of steel and its wastage bend books and authorized over lapping shall be measured DSR 2023 | 28.14 | QTL | 7,945 | ₹2,23,572.3 |
| 7 | M-150 class brick work in 1:4 cement and corse sand mortar in super structure in one brick thick wall including necessary cutting and moulding of bricks and honey comb brick work and also including supply of all materials. Labour and T & P etc. required for proper completion of the work SI no. 305A+310 | 41.09 | CUM | 4,810 | ₹1,97,642.9 |
| 8 | 12 mm thick plaster with cement and appro ved coarse sand mortar in 1:4 over brick 1 cm inlcuding supply of all materials, labour T&P etc. required for proper completion of the work SI No. 584 | 566.84 | SQM | 160 | ₹90,694.4 |
| 9 | Finishing wall with two coat of water proof cement paint weather coat of approved quality on previously old treated surface with this paint to give an even shade including cost of providing of cement primer including supply of all materials, labour Tools & plant etc. required for proper completion of the work New Item 660 | 424.84 | SQM | 98 | ₹41,634.32 |
| 10 | M.S or iron work of M.S. Grills/Stair case railling/gates/trusher/racks etc and section such as holding down bolts, hold fast, tie rods grating etc. wrougth to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work.(SI No. 502A) | 10.5 | QTL | 6,150 | ₹64,575 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
Tendernotice_2.pdf
PDF • 0.61 MB
BOQ_2293127.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .