| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC NEDUMKANDAM GP | IDUKKI | KERALA | 685501 | 1 | Accepted-AOC L1 | |
| 2 | 2₹3.4 L+₹1,975.79 (0.59%)Rejected-Finance | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SABU THOMAS L1 | BINU ANTONY L2 |
|---|---|---|---|---|---|
| 1.00STAIR, GATE & OTHER FACILITIES | |||||
| 1.00 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 17.08 | kilogram | 116.69 ₹1,993.3 Lowest | 150 ₹2,562.3 |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,009.27 | kg | 178.42 ₹1,80,074.13 | 178 ₹1,79,650.24 Lowest |
| 1.00 | OD490480/2024-2025:Roofing with GI Trafforded sheet 0.35 mm thick powder coated with over lap of 150 mm at
ends and SS screws including plain washers and bitumen washers etc .... complete | 20.91 | sqm | 1,067.95 ₹22,335.11 | 900 ₹18,822.6 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 5.6 | sqm | 1,008.55 ₹5,647.88 | 600 ₹3,360 Lowest |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.92 | cum | 12,772.18 ₹11,750.41 | 9,800 ₹9,016 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 38.64 | kilogram | 112.43 ₹4,344.3 | 100 ₹3,864 Lowest |
| 1.01 | OD378637/2025-2026:Supplying and fixing 200mm PVC gutter including cost conveyance,labour as per direction from departmental officers | 30 | metre | 180.56 ₹5,416.8 Lowest | 495 ₹14,850 |
| 2.00Yoga Hall | |||||
| 2.00 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 11.05 | cum | 7,500 ₹82,890 Lowest | 7,713 ₹85,244.08 |
Tender Value
₹3.4 L
EMD Value
₹8,475
Closing Date
2 Feb 2026, 6:00 pmClosed
ASSISTANT ENGINEER
LID AND EW SECTION NEDUMKANDAM
RETENDER - GENERAL-Saayam Prabha Home Maintenance-P
2025_LSGD_816975_2
13/AE/LID AND EW/NDKM/TENDER/25-26
Open Tender
Civil Works - Buildings
Item Rate
90 days
NEDUMKANDAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹750
₹8,475
5 Jun 2026
25 Jan 2026
4 Feb 2026
25 Jan 2026
2 Feb 2026
25 Jan 2026
STAIR, GATE & OTHER FACILITIES
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
OD490480/2024-2025:Roofing with GI Trafforded sheet 0.35 mm thick powder coated with over lap of 150 mm at ends and SS screws including plain washers and bitumen washers etc .... complete
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD378637/2025-2026:Supplying and fixing 200mm PVC gutter including cost conveyance,labour as per direction from departmental officers
Yoga Hall
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
50.9.1.3:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). using good quality Vengai wood
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1395578.xls
BOQ • 0.22 MB
viewsbd.pdf
Tender Documents • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .