Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance AMBEDKAR PURAM 6 140 AWAS VIKAS SECTOT 6 KANPUR NAGAR | Admitted-Finance |
| 4 | Rejected-Technical 741 AWAS VIKAS COLONY GADHINAGAR BASTI UP | BASTI | UTTAR PRADESH | 271305 | Rejected-Technical Reject |
Tender Value
₹19.8 L
EMD Value
₹99,000
Closing Date
25 Feb 2020, 3:00 pmClosed
Project Manager
PROJECT MANAGER, UNIT-8, 19 MARUTIPURAM, FAIZABAD ROAD, LUCKNOW
LABOUR CHARGES FOR CONSTRUCTION OF MINI STADIUM (INDOOR AND OUTDOOR GAME) AT VILLAGE-GURDHARI, BLOCK- SAFIPUR DISTRICT- UNNAO
2020_UPPRC_434345_1
68/PCL/PM/Unit-8/Mini Stadium
Open Tender
Miscellaneous Services
Item Rate
90 days
Unnao
LABOUR CHARGES FOR CONSTRUCTION OF MINI STADIUM (INDOOR AND OUTDOOR GAME) AT VILLAGE-GURDHARI, BLOCK- SAFIPUR DISTRICT- UNNAO
2 documents required · 2 mandatory
₹2,950
Project Manager, Unit-8
₹99,000
Lucknow
3 Jun 2020
13 Feb 2020
25 Feb 2020
13 Feb 2020
25 Feb 2020
13 Feb 2020
20 Feb 2020
Amount
Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches.
Labour charges for laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 Stone ballast 40 mm nominal size) including all labour T & P etc, but excluding cost of all material required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. (curring complete)
Labour charges for steel reinforcement in R.C.C. Work including cutting, bending, binding and placing for required shape but excluding cost of all steel.
Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Raft Foundation excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work.
Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Column excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work.
Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Plinth band excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work.
Labour charges of R.C.C. work with cement , coarse sand & 20mm gauge approved Stone aggregate in the proportion 1:1.5:3 in R.C.C. Top band excluding supply of reinforcement and all material but including necessary centering & shuttering, labour T&P etc. required for proper completion of work.
Labour charges for first Class brick work in 1:6 cement and coarse sand of 2.25 F.M. mortar in Super structure and plinth including all labour, tools and plants etc. required for proper completion of the work. (1:6 cement & coarse sand) (curring complete)
Labour charges for first Class brick work in 1:3 cement and coarse sand of 2.25 F.M. mortar in Super structure including all labour, tools and plants etc. required for proper completion of the work. (1:3 cement & coarse sand) (curring complete)
Labour charges for 12mm thick plaster with proportion of 1:6 cement & approved coarse sand with scaffolding complete in all respect.
Providing and applying white cement based putty of average thickness 1mm, of approved brand and manufacturer, over the plastered wall surfaceto prepare the surface even and smooth complete.
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
Making drip course/groove in plastered surface or moulding to RCC work complete in all respect.
GST extra as applicable
DESH DEEPAK SINGH
M/S ABHAY SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .