The Chief Officer, Boriavi Municipality, Boriavi
BID DOCUMENTS FOR CONSTRUCTION WORK OF PAVER BLOCK AND COMPOUND WALL AT HARIPURA AREA OF BORIAVI NAGARPALIKA UNDER THE GRANT OF SHRI SANAJYBHAI MAHIDA STATE LEVEL MINSTER OF GUJARAT GOVERNMENT.
349028
SLM Grant/2026-27
Open
Civil Works
Works
Anand
14 documents required · 14 mandatory
₹1,062
The Chief Officer, Boriavi Municipality, Boriavi
₹16,000
25 Sept 2026
25 Sept 2026
25 Sept 2026
9 Oct 2026
25 Sept 2026
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where
there is a change as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Chief Officer
Boriavi Nagarpalika
SECTION-7 BILL OF QUANTITIES-164
BORIAVI MUNICIPALITY, BORIAVI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF PAVER BLOCK ROAD
FROM BHAGVANBHAI GOMABAHI SODHA HOUSE KANTIBHAI BHALABHAI SODHA HOUSE AND NEAR
MANUBHAI THAKOR HOUSE IN HARIPURA AREA AT BORIAVI
Qty. Description Unit Amount
1 90.00 Box Cutting the Road Surface to proper slope and camber for
Cmt. making a base for road work including removing the excavated
stuff and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead
2 597.50 Providing and fixing pre-cast Rubber Dye inter locking concrete
Smt. block 60mm thick with grade of concrete M300 pnumatic
compressed / Vibrated mechanically as per approved design
confirming to IS 15658 : 2006 including 35mm sand layer for
levelling and filling the joint with sand in proper line and level etc
complete as per guidelines of IRC : SP 63 - 2018 etc. complete. 706.93 Smt.
3 5.00 Providing and laying controlled cement concrete M.150 for curing
Cmt. complete excluding cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concrete.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-165
BORIAVI MUNICIPALITY, BORIAVI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF COMPOUND WALL AND GATE AT HARIPURA SMASHAN AT
Item Qty. Description Total Unit Amount
1 32.30 Excavation for foundation upto 1.5 m depth including sorting
Cmt. out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
2 5.80 Excavation for foundation for depth from 1.5 m to 3.0 m
Cmt. including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead.(A)
Loose or soft soil
3 24.20 Filling available excavated earth (excluding rock) in
Cmt. trenches. plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidating each disposited
layer by ramming and watering.
4 3.70 Providing and laying cement concrete (1:4:8) (1 Cement,
Cmt. Coarse sand, 8 Crushed stone agreegate 40 mm nominal) and
curing complete excluding cost of formwork in foundation and
plinth. 2905.71 Cmt.
5 5.60 Providing and Laying controlled cement concrete M-200 and
Cmt. curing complete, including the cost of formwork but excluding
the cost of reinforcement for reinforced concrete work in
Column footings.
6 1.50 Providing and laying controlled cement concrete M-200 and
Cmt. curing complete including the cost of formwork But Excluding
the cost of reinforcement for reinforced concrete work in
Column upto Plinth Level having any cross section area.
7 1.40 Providing and Laying controlled cement concrete M-200 and
Cmt. curing complete, including the cost of formwork but excluding
the cost of reinforcement for reinforced concrete work in
Columns having any cross section area upto floor two level.
SBD SECTION-7 BILL OF QUANTITIES-167
8 3.30 Providing and laying controlled cement concrete M-200 and
Cmt. curing complete including the cost of formwork but Excluding
the cost of reinforcement for reinforced concrete work in
Ground Beam having any cross section area.
9 0.90 Providing and laying controlled cement concrete M-200 and
Cmt. curing complete including the cost of formwork and excluding
the cost of reinforcement of reinforced concrete work in Coping
1130.00 Providing TMT Bar FE 500D reinforcement for R.C.C. work
Kgs. including bending, binding and placing in position complete upto
floor two level
11 5.90 Brick work using common burnt building bricks having crushing
Cmt. strngth not less than 35 Kg./cm2 in super structure for Ground
Floor in C.M. (1:6) (1 Cement, 6 fine sand) racking out joints
curring etc. complete directed by Engineer-in-charge.
12 71.90 20 mm thick sand faced cement plaster on walls up to heinht
Smt metres above ground laval cosisting of 12 mm thick backing coat
of C:M 1:3 (1-cement :3-sand) and 8mm thick finishing coat of
C:M 1:1 (1-cement :1-sand) etc. complete.
13 71.81 Finishing wall with water proof exterior emulsion apex paint of
Smt on wall surfaces (two coats) to give an approved brand and
manufacture and of required slope evan shade after throughly
brushing the surface to remove all dirt and remains of loose
powered materials. etc completed.
SBD SECTION-7 BILL OF QUANTITIES-168
15 3.58 Steel work, riveted in built up sections framed work including
Qtl. cutting, hoisting, fixing in position and applying a priming coat of
red lead paint. (A) In beams and joists, channels angles Tees,
flats, with connecting plates or angle cleats as in main and cross
beams. Hip and jack rafters, purlins conneted to common rafters
16 0.10 16G Make Tata
Qtl. Double twisted barbed wire, gauge 16, barb spacing 4". four
horizontal lines and two diagonals of galvanised steel barbed
wire weighting 9.38 K.G. per 100 metre strained and fixed to
posts with G.I. staples, including fixing the posts in coping of
17 6.30 Painting two coats (Including Priming Coat) on new steel and
Smt. other metal surface with synthetic enamel paint, brushing to give
an even shade including cleaning the surface of all dirt, dust and
other foreign matter.
Total Amount, Rs.
Total Amount, Rs.
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll Rs.
Add :- 2% of Contingency Charges Rs.
SBD SECTION-7 BILL OF QUANTITIES-169
BORIAVI MUNICIPALITY, BORIAVI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF PAVER BLOCK ROAD
FROM RAMANBHAI MANGALBHAI HOUSE TO LALABHAI BHALABHAI HOUSE IN HARIPURA AREA AT
Qty. Description Unit Amount
1 84.00 Box Cutting the Road Surface to proper slope and
Cmt. camber for making a base for road work including
removing the excavated stuff and dipositing to road slope
as directed all lead and lift etc. complete upto 50 mt.
Lead 109.41 Cmt.
2 560.00 Providing and fixing pre-cast Rubber Dye inter locking
Smt. concrete block 60mm thick with grade of concrete M300
pnumatic compressed / Vibrated mechanically as per
approved design confirming to IS 15658 : 2006 including
35mm sand layer for levelling and filling the joint with
sand in proper line and level etc complete as per
guidelines of IRC : SP 63 - 2018 etc. complete.
3 6.00 Providing and laying controlled cement concrete M.150
Cmt. for curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in (A)
Foundations, footings, Base of columns and Mass
concrete. 2809.74 Cmt.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-166
BORIAVI MUNICIPALITY, BORIAVI
NAME OF WORK :- ESTIMATE FOR CONSTRUCTION WORK OF PAVER BLOCK ROAD
AT HARIPURA SMASHAN AT BORIAVI
Qty. Description Total Rate Unit Amount
1 28.40 Box Cutting the Road Surface to proper slope and camber for making
Cmt. a base for road work including removing the excavated stuff and
dipositing to road slope as directed all lead and lift etc. complete
upto 50 mt. Lead
2 14.20 Providing and laying cement concrete (1:4:8) (1 Cement, 4 Coarse
Cmt. sand, 8 Crushed stone agreegate 40 mm nominal) and curing
complete excluding cost of formwork in foundation and plinth.
3 188.80 Providing and fixing pre-cast Rubber Dye inter locking concrete block
Smt. 60mm thick with grade of concrete M300 pnumatic compressed /
Vibrated mechanically as per approved design confirming to IS
: 2006 including 35mm sand layer for levelling and filling the joint
with sand in proper line and level etc complete as per guidelines of
IRC : SP 63 - 2018 etc. complete.
4 2.50 Providing and laying controlled cement concrete M.150 for curing
Cmt. complete excluding cost of formwork and reinforcement for
reinforced concrete work in (A) Foundations, footings, Base of
columns and Mass concrete.
Add :- 18% of GST, Rs.
Add :- 1% of Quality Controll, Rs.
Add :- 2% of Contingency Charges, Rs.
SBD SECTION-7 BILL OF QUANTITIES-170
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
STANDARD BIDDING DOCUMENTS.pdf
Notes.pdf
BOQ.pdf
Other Important-1.pdf
Other Important-2.pdf
Other Important-3.pdf
Other Important-4.pdf
Other Important-5.pdf
Other Important-6.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .