| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.1 LAdmitted-Finance | ₹77.1 L | L1 | Admitted-Finance |
| 2 | L2₹80.9 L+₹3.8 L (4.97%)Admitted-Finance | ₹80.9 L+₹3.8 L (4.97%) | L2 | Admitted-Finance |
| 3 | L3₹81.3 L+₹4.3 L (5.52%)Admitted-Finance | ₹81.3 L+₹4.3 L (5.52%) | L3 | Admitted-Finance |
| 4 | L4₹82.9 L+₹5.8 L (7.57%)Admitted-Finance | ₹82.9 L+₹5.8 L (7.57%) | L4 | Admitted-Finance |
| 5 | L5₹86.8 L+₹9.8 L (12.7%)Admitted-Finance | ₹86.8 L+₹9.8 L (12.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V SURENDRA NAIDU L2 | LINGAM RAVI KIRAN L6 | M N NAIDU CONSTRUCTIONS L3 | CHINTHADA VENKATA RAO L5 | Sri Shivanagoud S Yalwar L4 | B SIVA KUMAR L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing the debris on the adhistana of the cloister mandapa including labour charges etc., complete as directed by site-in-Charge. | 61.28 | Cu.m | 667 ₹40,873.76 | 744.54 ₹45,625.41 | 699 ₹42,834.72 | 716.45 ₹43,904.06 | 650 ₹39,832 | 635.67 ₹38,953.86 Lowest |
| 2.00 | Collection of the adhistana stone members inside the temple complex for resetting the adhistana including cost of the labours etc., complete as directed by the site in charge. | 9.07 | Cu.m | 6,135.1 ₹55,645.36 | 6,845.48 ₹62,088.5 | 5,999 ₹54,410.93 | 6,587.16 ₹59,745.54 | 6,600 ₹59,862 | 5,844.49 ₹53,009.52 Lowest |
| 3.00 | Removal and resetting of Adhistana of the cloister mandapa by procuring the 60% of new stones for missing adhistana portion for three layers of different thickness are 200mm, 300mm, 250mm including cost of the material, labour charges, loading and unloading charges, transportation charges, conveyance charges etc. complete as directed by the site in-charge. | 30.24 | Cu.m | 39,460 ₹11,93,270.4 | 44,029.22 ₹13,31,443.61 | 41,999 ₹12,70,049.76 | 42,367.74 ₹12,81,200.46 | 40,000 ₹12,09,600 | 37,590.99 ₹11,36,751.54 Lowest |
| 4.00 | Erection of the pillars by using chain pulley block Crane including labour charges etc., complete as directed by the site in-charge. | 26 | Each | 6,251 ₹1,62,526 | 6,974.8 ₹1,81,344.8 | 6,777 ₹1,76,202 | 6,711.6 ₹1,74,501.6 | 7,000 ₹1,82,000 | 5,954.9 ₹1,54,827.4 Lowest |
| 5.00 | Erection of the capitals by using chain pulley block Crane including labour charges etc., complete as directed by the site in-charge. | 26 | Each | 4,086.9 ₹1,06,259.4 | 4,560.12 ₹1,18,563.12 | 4,444 ₹1,15,544 | 4,388.04 ₹1,14,089.04 | 4,400 ₹1,14,400 | 3,893.31 ₹1,01,226.06 Lowest |
| 6.00 | Earth work excavation for flooring including labour charges etc., complete as directed by the site in-charge. | 24.56 | Cu.m | 667 ₹16,381.52 | 745.18 ₹18,301.62 | 588 ₹14,441.28 Lowest | 717.06 ₹17,610.99 | 650 ₹15,964 | 636.22 ₹15,625.56 |
| 7.00 | Laying of flooring with new granite stones of 100 mm thickness (Approx.) over lime concrete bed (1:2:4) and pointing the joints with Lime Surkhi Mortar (1:1:1) including cost, conveyance, loading and unloading of material and labour charges etc. complete as directed by the site in-charge. | 367.9 | Sq.m | 8,911 ₹32,78,356.9 | 9,942.8 ₹36,57,956.12 | 8,877 ₹32,65,848.3 | 9,567.6 ₹35,19,920.04 | 9,200 ₹33,84,680 | 8,488.9 ₹31,23,066.31 Lowest |
| 8.00 | Laying of flooring (over the already laid lime concrete bed) in the west side of the cloister mandapa by procuring stones of 100 mm thickness (Approx.) including cost, conveyance, loading and unloading of material and labour charges,etc., complete as directed by the site in-charge. | 135 | Sq.m | 6,160.88 ₹8,31,718.8 | 6,874.25 ₹9,28,023.75 | 5,888 ₹7,94,880 | 6,614.84 ₹8,93,003.4 | 6,200 ₹8,37,000 | 5,869.05 ₹7,92,321.75 Lowest |
| 9.00 | Construction of Brick core wall with Brick Masonry in Lime Mortar (1:1:1) including cost of the material, labour charges, transportation charges, loading and unloading etc., complete as directed by the site in-charge. | 211.3 | Cu.m | 9,124.75 ₹19,28,059.68 | 10,181.3 ₹21,51,308.69 | 8,999 ₹19,01,488.7 | 9,797.1 ₹20,70,127.23 | 9,300 ₹19,65,090 | 8,693.43 ₹18,36,921.76 Lowest |
| 10.00 | Hiring of 5 ton Crane including Diesel charges etc., complete as directed by the site in-charge. | 200 | Each | 2,375 ₹4,75,000 | 2,650 ₹5,30,000 | 2,474 ₹4,94,800 | 2,550 ₹5,10,000 | 2,400 ₹4,80,000 | 2,262.5 ₹4,52,500 Lowest |
Tender Value
₹85.1 L
EMD Value
₹2.1 L
Closing Date
21 Jul 2026, 11:00 amClosed
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P.)
As per Tender document
2026_ASI_915288_1
01/NIT/2026-2027/Amaravati/ Ongole Sub Circle
Open Tender
Civil Works
Works
180 days
udayagiri, ongole
As per Tender document
3 documents required · 3 mandatory
₹0
₹2.1 L
Yes
20 Aug 2026
1 Jul 2026
22 Jul 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing the debris on the adhistana of the cloister mandapa including labour charges etc., complete as directed by site-in-Charge. | 61.28 | Cu.m | 1 | ₹61.28 |
| 2 | Collection of the adhistana stone members inside the temple complex for resetting the adhistana including cost of the labours etc., complete as directed by the site in charge. | 9.07 | Cu.m | 1 | ₹9.07 |
| 3 | Removal and resetting of Adhistana of the cloister mandapa by procuring the 60% of new stones for missing adhistana portion for three layers of different thickness are 200mm, 300mm, 250mm including cost of the material, labour charges, loading and unloading charges, transportation charges, conveyance charges etc. complete as directed by the site in-charge. | 30.24 | Cu.m | 1 | ₹30.24 |
| 4 | Erection of the pillars by using chain pulley block Crane including labour charges etc., complete as directed by the site in-charge. | 26 | Each | 1 | ₹26 |
| 5 | Erection of the capitals by using chain pulley block Crane including labour charges etc., complete as directed by the site in-charge. | 26 | Each | 1 | ₹26 |
| 6 | Earth work excavation for flooring including labour charges etc., complete as directed by the site in-charge. | 24.56 | Cu.m | 1 | ₹24.56 |
| 7 | Laying of flooring with new granite stones of 100 mm thickness (Approx.) over lime concrete bed (1:2:4) and pointing the joints with Lime Surkhi Mortar (1:1:1) including cost, conveyance, loading and unloading of material and labour charges etc. complete as directed by the site in-charge. | 367.9 | Sq.m | 1 | ₹367.9 |
| 8 | Laying of flooring (over the already laid lime concrete bed) in the west side of the cloister mandapa by procuring stones of 100 mm thickness (Approx.) including cost, conveyance, loading and unloading of material and labour charges,etc., complete as directed by the site in-charge. | 135 | Sq.m | 1 | ₹135 |
| 9 | Construction of Brick core wall with Brick Masonry in Lime Mortar (1:1:1) including cost of the material, labour charges, transportation charges, loading and unloading etc., complete as directed by the site in-charge. | 211.3 | Cu.m | 1 | ₹211.3 |
| 10 | Hiring of 5 ton Crane including Diesel charges etc., complete as directed by the site in-charge. | 200 | Each | 1 | ₹200 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.04 MB
BOQ_961885.xls
BOQ • 0.32 MB
01SignedNIT.pdf
Additional Documents • 13.02 MB
cover1.pdf
Additional Documents • 4.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .