Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹20.6 L
EMD Value
₹20,650
Closing Date
26 Dec 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
PANCHAYAT UNION VAIYAMPATTI
Strengthening to the Road From Kombaipatti Road in A.Reddiyapatti Panchayat.VPR (R75) KM -0/0-0/690Vaiyampatti Block Tiruchirappalli District
2023_RDTN_400933_1
A2/3825/2023
Open Tender
Civil Works - Roads
Works
180 days
VAIYAMPATTI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,650
Yes
26 Dec 2023
18 Dec 2023
26 Dec 2023
18 Dec 2023
26 Dec 2023
18 Dec 2023
Amount
Strengthening to the Road From Kombaipatti Road in A.Reddiyapatti Panchayat.VPR (R75) KM -0/0-0/680 Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
BT Picking including all labour charges
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying US gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying open graded premix carpet with seal coat 20 mm consol-idated thickness using 0.18 Cum of 13.2 mm IRC size machine crushed HBG metal and 0.09 Cum of 11.2 mm IRC size machine crushed HBG metal with 14.6 Kgs of bitumen for premixing per 10 Sqm. metre of premix carpet and 0.09 Cum of 6.75 mm IRC HBG size machine crushed HBG metal with 9.80 Kg. of bitumen per 10 Sqm. of seal coat including cost and conveyance of all materials from approved sources to worksite and stacking them to standard departmental gauge for pre-measurement including bitumen which will be supplied by the department at the departmental section store at Panchayat Union Office including conveyance of bitumen from section stores to worksite and the cost of the same will be recovered from the contractors bill at the rates specified in the special condition appended herewith including heaking and mixing the materials using mini hot mix plant for premix carpet including all labour charges for spreading the same finishing to specifications, grades and cross section and consolidation by power roller including heating and sparying the bitumen for seal coat over finished permix carpet surfaces and spreading the 6.75 mm IRC chips uniformly over the surface and rolling with power roller rolling including hire and fuel charges for mini hot mix plant. power roller and all other tools and plants employed, 'including all other incidental charges etc., complete.
Provision for HM stone
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VGM CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .