Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
23 Nov 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (P and P) UC
DGM (P and P) UC, FACT LTD, Udyogamandal
Miscellaneous Instrumentation works in Acid and PC Area, Fert UC 2020-21
2020_FACT_594843_1
3004/2020-2021/E22382
Limited
Miscellaneous Works
Item Rate
365 days
FACT UDYOGAMANDAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
Yes
24 Nov 2020
4 Nov 2020
24 Nov 2020
4 Nov 2020
23 Nov 2020
4 Nov 2020
90 days
Miscellaneous Instrumentation works in Acid & PC Area, Fert UC 2020-21.
Replacement of air filter regulators of Control valves. Work includes removal of old defective air filter regulators (end connection size ¼” or ½ “) and fixing new tested air filter regulators on Control valves with proper supports and fasteners. Note: All the materials will be issued by FACT at free of cost.
Providing isolation valves of size 15NB , 800#. for impulse tappings of flow / pressure transmitters.Work includes welding of these socket welded valves on transmitter impulse line tapping. Note: All the materials and welding machine will be issued by FACT.
Fabrication and mounting of Instrument stanchions. Work includes fabrication of instrument stanchion (size 50 NB, SCH80 MS pipe,length 130cm) with base plate of size 225mm X225mm X 6mm.and fixing the stanchion on the floor at site using anchor bolts. Note: All the materials will be issued by FACT except welding and cutting machine.
Installation of Instrument Air Header and Air Line. The scope of work includes the transportation of all necessary items(including free supply items from FACT) from Lab / Stores to site. The work also includes pipe fabrication with suitable MS/Aluminium supports and welding works required for the connection to the existing 1"" to 2"" main Air distribution line at site (at a maximum distance of 200 m). The supports shall be proper aluminium/ MS angle support fixed using welding / proper SS304 fasteners. SS nut, bolt and washers of size M6X40 mm shall be used wherever required. The work shall include painting of supports with one coat of primer and two coats of chlorinated rubber paint of dark gray colour.Installation of Instrument Air Header shall be as per enclosed Instrument Air Supply Distribution Diagram, FEDO Engineering Specification for Instrument Erection-25ES401 / 94, ,Instumentation Works General Scope -25ES403 / 98 - R1 and instructions from the Engineer-in-Charge. All the materials will be issued by FACT.
Cleaning/brushing the spindle of inlet isolation valve of each Air Distributor(AD), Lubricating, closing and opening of inlet isolation valves, flushing out the AD, changing the defective ¼” distribution valves, lining up the AD, leak checking and providing seal plug for drain valves. All the materials will be issued by FACT at free of cost.
Dismantling of control valves (End connection flange size 100 NB, rating up to 600#, having weight range 125 to 250 Kg , total end connection flange bolts 16 nos) from plant site, transporting them to FACT-UD workshop and or loading to truck, bringing back to site and or unloading from truck, fixing back in position leak proof at site with proper gaskets, bolts & nuts. All the materials required for the work will be supplied by FACT as free issue.
Dismantling of control valves (End connection flange size 80 NB, rating up to 300#, having weight range 75 to 100 Kg , total end connection flange bolts 16 nos) from plant site, transporting them to FACT-UD workshop and or loading to truck, bringing back to site and or unloading from truck, fixing back in position leak proof at site with proper gaskets, bolts & nuts. All the materials required for the work will be supplied by FACT as free issue.
Dismantling of control valves (End connection flange size up to 50 NB, rating up to 300#, having weight range 50 to 75 Kg, total end connection flange bolts 16 nos) from plant site, transporting them to FACT-UD workshop and or loading to truck, bringing back to site and or unloading from truck, fixing back in position leak proof at site with proper gaskets, bolts & nuts. All the materials required for the work will be supplied by FACT as free issue.
Repairing & servicing of Level Gauges (Flange Size & Rating up to 50NB, 600#, Length up to 1500mm). The scope of work includes removal of level gauges from line, transporting from site to workshop, dismantling the level gauge assembly, replacing the damaged parts, assembling, cleaning, presuure testing, transporting from workshop to site and fixing it back on line. All the materials required for the work will be supplied by FACT as free issue.
Repairing & servicing of Level Switches (Flange Size & Rating up to 100 NB, 300#). The scope of work includes removal of level switches from line, transporting from site to workshop, dismantling the level switch assembly, replacing the damaged parts, assembling, cleaning, testing, transporting from workshop to site and fixing it back on line. All the materials required for the work will be supplied by FACT as free issue.
Repairing & servicing of flanged Thermowells with Thermocouples. (Flange Size & Rating :40 NB, up to 600#, Length up to 1000 mm). The scope of work includes removal of thermowell assembly from line, transporting from site to workshop, replacing the damaged parts, assembling, testing, transporting from workshop to site and fixing it back on line. All the materials required for the work will be supplied by FACT as free issue.
Fixing of condensing pots for transmitter impulse lines. Work includes fixing of condensing pots (size up to 80 NB, rating 600 #) on line (after transmitter first isolation valve) and connecting with transmitter impulse lines with proper pipe fittings. Condensing pot supports to be fabricated with 50 x 50 mm, 500 mm long MS angles and fixed on suitable location at site. Condensing pots to be mounted on these supporting angles with proper 'U' clamps. All the materials required for the work will be supplied by FACT as free issue.
Dismantling of Flush mounting type Level transmitters / Magnetic Flow Heads / Mass flow meters (End connection flange size 80NB / 100NB, rating up to 300#, having weight range 30 to 50 Kg , total end connection flange bolts 16 nos) from plant site, transporting them to Instrumentation lab, bringing back to site and fixing back in position leak proof at site with proper gaskets, bolts & nuts. All the materials required for the work will be supplied by FACT as free issue.
Fabrication and mounting of field Instrument supports. Work includes fabrication of instrument supports (size 50 NB, SCH80 MS pipe,"L"shape size 300X 200mm) and fixing the support on the "I" beam at plant site. Note: All the materials will be issued by FACT except welding and cutting machine.
Installation of Junction Boxes of size 350x420x150mm approx on newly fabricated MS Supports. The work shall include the fabrication of MS supports with necessary holes drilled for mounting the JBs and fixing it on to the available structures by welding/using fastners (SS 304 bolt, nut and washers)/anchor bolts on to the structure. The Junction box shall be mounted to the newly fabricated MS supports by using SS nut, bolt and washers of size M6 X 40. All the materials will be issued by FACT at free of cost.
Replacements of corroded terminal blocks in Existing Field Junction Boxes and terminating the cables in Terminal Block with proper crimping lugs & ferrules. Work include, disconnecting the wires from terminal blocks of existing field instrument field junction boxes, Removing the corroded terminal blocks (size up to Sq.4mm, Maximum 36 Nos in a junction box) and 35 mm DIN rails, Fixing new terminal blocks and DIN rail, Terminating the existing instrument signal wires (12 pair / 12 triad, wire size 2.5 sq. mm max.) with proper crimping lugs and ferrules. Terminal blocks shall be provided with cable identification markers. After termination, wires shall be dressed using cable ties and buttons. All the material required for the work will be supplied by FACT as free issue.
Providing New Temperature Point in Process Line. Work includes fixing of flanged thermowell (Flange size: 40 NB, Rating up to 300 #, "U" Length up to 1000 mm) on the nozzle provided in the pipe line or vessel, Peeling the armoured signal cable, Cable glanding and termination on the thermowell head assembly, Cable glanding and termination in the Field Junction Box, Terminating inside control room TB. Thermocople / RTD signal cable termination in JB's and TB's shall be done using crimping lugs and proper ferruling. Work also includes Loop Testing from field to Control Room. Individual control wires will be of size 1.5 sq.mm maximum. All the material required for the work will be supplied by FACT as free issue.
Installation of DP /Pressure transmitters on instrument stanchions/ supports. Work includes Installation of DP /Pressure Transmitters on stanchions/supports with proper "U" clamps,nuts& bolts. Fixing 2 valve/3 valve manifolds on transmitter body with proper gaskets and bolts&nuts. Note: All the materials will be issued by FACT at free of cost.
Fabrication and laying of transmitter impulse lines. Work includes Fabrication of transmitter impulse lines using SS tubes (Size 12mm ODX1.5mm thick) and fittings. Laying of these impulse lines from instrument 1st isolation valve to flow/pressure transmitter and connecting both ends using proper tube fittings . If required, impulse lines to be fixed by using proper clamps, nuts and bolts. Note: All the materials will be issued by FACT at free of cost.
Laying of 6 mm/8mm SS pneumatic tubing from air headers to the air filter regulators or I/P Converters of control valves located at the plant site. Work includes laying of SS pneumatic tubing of sizes 6mm/8mm OD with standard SS fittings from air headder to control valve accesseries. One end shall be connected at air header tapping and the other end shall be connected at the air filter regulator/ I/P end. Sharp bends shalll be avoided and proper support shall be given using clamps for the pneumatic tubing. All the materials will be issued by FACT.
Laying of Signal/Power Cables - 12 pair/ 20 pair/12Triad: Cables and identification tags will be supplied by FACT free of cost. The scope of work includes transportation of cables to site, Installation of signal/ power cables-20 pair / 12 pair / 12Triad with wires of size upto 2.5 SQMM by laying on new/existing cable tray/ rack / clamping on the wall / structure / routing through GI pipe/trenches. The cables are to be laid from junction boxes to Junction Boxes / DCS Control Room. Dressing of cables in racks shall be by using Aluminium strips of size 20x5mm at intervals of minimum 1 meter on horizontal runs and 30 cm on vertical runs. Clamping of cables on structure shall be by welding and fixing suitable cleats. The scope of work includes fixing identification tags on either end of the cables before entering the instruments, junction boxes or control room. The tags may be tied to the cable using SS wires. The supply of SS304 fasteners and SS wire as detailed above is included in this item.
Removal of unused armoured cables of size 12 / 20 pair, 12 triad from different plant areas in UC and transportation of the same to scrap yard or a place identified by the Engineer in charge.
Supply of skilled Instrument craftsmen for attending instrumentation revamping works, tagging works, cable glanding, Calibration assistance, aux.control room relatedUp keeping , instr.repair assistance etc on 8 hour Shift basis, as directed by Engineer-in- charge. They shall be ITI/ITC Instrumentation certificate holders with experience in similar jobs/Apprenticeship in FACT .
Supply of semi skilled Instrument craftsmen for supporting instrumentation revamping works, tagging works, cable glanding, Calibration jobs , aux.control room related up keeping , instr.repair assistance etc on 8 hour Shift basis, as directed by Engineer-in- charge. They shall be ITI/ITC Instrumentation certificate holders.
Cleaning and checking of sensor pH : Work includes removal of sensor from line, cleaning of sensor as per standard procedure, checking of pH sensor as per procedure using standard buffer solutions after connecting with transmitter. All materials for the job will be provided by FACT free of cost.
Calibration of transmitter pH: Work includes removal of sensor from line, cleaning and calibration of pH transmitter as per procedure using standard buffer solutions. Record the results before & after calibration like zero & slope and submit to Engineer-in-Charge. All materials for the job will be provided by FACT free of cost.
Calibration of Transmitter Differential Pressure (DP): Work includes isolating by closing the isolation valve, removing the HP and LP side process connection of transmitter, Calibration of DP transmitter as per standard procedure (5 point, upscale & downscale) using calibrating instruments, fixing back of process connection to transmitter and hooking up of transmitter to the process. Record the results before & after calibrations and submit to Engineer-in-Charge. All materials for the job will be provided by FACT free of cost.
Calibration of Pressure Transmitter: Work includes isolating by closing the isolation valve, removing the process connection of transmitter, Calibration of transmitter as per standard procedure (5 point, upscale & downscale) using calibrating instruments, fixing back of process connection to transmitter and hooking up of transmitter to the process. Record the results before & after calibration and submit to Engineer-in-Charge. All materials for the job will be provided by FACT free of cost.
Removal & Refixing of Pressure Gauge: Work includes isolating by closing the isolation valve, removal of Pressure Gauge (dial size 250mm max and connection 1/2" NPT) and its manifold. All materials for the job will be provided by FACT free of cost.
Installation of Temperature transmitters Work include installation of temperature transmitters on stanchions / supports with proper "U" clamps, nuts & bolts. Note: All the materials will be issued by FACT at free of cost.
Calibration of Pressure Gauge: Work includes calibration/ checking of Pressure (dial size 250mm max and connection 1/2" NPT) as per standard procedure using calibrating instruments. Record the results before & after calibration and submit to Engineer-in-Charge. All materials for the job will be provided by FACT free of cost.
Fabrication and errection of ladder type cable racks of size 65cm/40cm/30cm/20cm using Aluminium angles of size 50x50x6mm and Aluminium flats of size 50x8mm and their erection in wall/ supports in the Fert UC plants. Aluminium flat cable supports shall be provided as cross bar at intervals of 400mm by drilling two numbers of holes at each end and fixing it with fasteners SS304-size 8mm with 2nos of washers. The fixing of the fabricated rack shall be by using proper aluminium/ MS angle support or using proper anchor fasteners. The work shall include supply of SS304 nuts, bolts, washers required for the fabrication of cable trays, painting of MS supports with one coat of epoxy-based primer and two coats of epoxy paint of dark grey colour. Breaking of walls, sunshade etc to carry out the work comes under the scope of the contractor.The Aluminium angle & flat, MS structurals will be supplied by FACT free of cost.
Supply of skilled PLC Programmer for the checking and programming of the standard PLCs on 8 hour Shift basis.
Supply of skilled PLC Programmer for the checking and programming of the standard PLCs on 4 hour Shift basis.
V V ELECTRICALS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .