Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC | ₹11.6 L | L1 | Accepted-AOC Work awarded |
| 2 | L2₹11.9 LRejected-AOC | ₹11.9 L | L2 | Rejected-AOC Work awarded to L1 |
| 3 | L3₹12.2 LRejected-Finance | ₹12.2 L | L3 | Rejected-Finance Lowest bid accepted |
| 4 | L4₹13.7 LRejected-Finance | ₹13.7 L | L4 | Rejected-Finance Lowest bid accepted |
| 5 | L5₹13.9 LRejected-Finance | ₹13.9 L | L5 | Rejected-Finance Lowest bid accepted |
| Sl No | Description | Qty | Unit | SANTHOSHKUMAR K L4 | manakkal madhavan L3 | RAJAN P L2 | SAJI P L1 | JASIR CA L6 | SANOOP L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00DETAILED ESTIMATE | |||||||||
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 480 | sqm | 290 ₹1.4 L | 225 ₹1.1 L | 130 ₹62,400 | 100 ₹48,000 | 221.25 ₹1.1 L | 210 ₹1.0 L |
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 22.8 | sqm | 46 ₹1,048.80 | 35 ₹798 | 30 ₹684 | 70 ₹1,596 | 34.98 ₹797.54 | 45 ₹1,026 |
| 1.00 | OD275509/2025-2026::Chipping and removing old spalling/detective concrete and exposing the detective/corroded reinforcement of the ceiling, joint the additional bar wherever 1/3 diameter of the bar is corroded. Removel of the detective concrete across the bar should be at least 2mm beyond the detective bar so that the reinforcing bar can be cleaned with ribbon, wire brush etc. After cleaning the bar wash with clean water and collect all the spalled/ fallen concrete. Measurement is calculated for whole exposed area. Including cost of
materials, labour charges, conveyance of materials to site hire charges of tools etc complete. | 22.8 | sqm | 600 ₹13,680 | 350 ₹7,980 | 300 ₹6,840 | 400 ₹9,120 | 382.83 ₹8,728.52 | 500 ₹11,400 |
| 1.00 | OD275511/2025-2026:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat of nitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. | 22.8 | sqm | 800 ₹18,240 | 650 ₹14,820 | 450 ₹10,260 | 500 ₹11,400 | 618.31 ₹14,097.47 | 750 ₹17,100 |
| 1.00 | OD275516/2025-2026:The applying two component high build polymer modified cementitions reinstatement mortor Rendroc HB2 preferable with hand using wet on wet methed to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. | 22.8 | sqm | 800 ₹18,240 | 250 ₹5,700 | 150 ₹3,420 | 300 ₹6,840 | 222.89 ₹5,081.89 | 950 ₹21,660 |
| 1.01 | OD275517/2025-2026:The Ceiling surface is to be smoothened with modified mortor to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges, conveyance of meterials to site hire charges of tools etc complete. | 22.8 | sqm | 1,000 ₹22,800 | 275 ₹6,270 | 300 ₹6,840 | 400 ₹9,120 | 280.98 ₹6,406.34 | 950 ₹21,660 |
| 1.01 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 6,642.3 | sqm | 20 ₹1.3 L | 8 ₹53,138.40 | 10 ₹66,423 | 5 ₹33,211.50 | 12.68 ₹84,224.36 | 9 ₹59,780.70 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 6,642.3 | sqm | 45 ₹3.0 L | 35 ₹2.3 L | 50 ₹3.3 L | 40 ₹2.7 L | 50.05 ₹3.3 L | 47 ₹3.1 L |
| 1.01 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work | 6,642.3 | sqm | 65 ₹4.3 L | 75 ₹5.0 L | 60 ₹4.0 L | 65 ₹4.3 L | 70.54 ₹4.7 L | 67 ₹4.5 L |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
24 Feb 2026, 3:00 pmClosed
Executive Engineer
The Executive Engineer, PWD Buildings Division, Kozhikode
GENERAL Annual Maintenance 2025 26 to ABCD block attached to Govt medical college Kozhikode Chemical treatment to damaged structural members and painting General Civil Work
2026_PWD_837010_1
74/EEBK/2025-26
Open Tender
Civil Works - Buildings
240 days
Medical college
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
10 Apr 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
DETAILED ESTIMATE
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
OD275509/2025-2026::Chipping and removing old spalling/detective concrete and exposing the detective/corroded reinforcement of the ceiling, joint the additional bar wherever 1/3 diameter of the bar is corroded. Removel of the detective concrete across the bar should be at least 2mm beyond the detective bar so that the reinforcing bar can be cleaned with ribbon, wire brush etc. After cleaning the bar wash with clean water and collect all the spalled/ fallen concrete. Measurement is calculated for whole exposed area. Including cost of materials, labour charges, conveyance of materials to site hire charges of tools etc complete.
OD275511/2025-2026:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat of nitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete.
OD275516/2025-2026:The applying two component high build polymer modified cementitions reinstatement mortor Rendroc HB2 preferable with hand using wet on wet methed to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete.measurement is calculated as in the previous case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete.
OD275517/2025-2026:The Ceiling surface is to be smoothened with modified mortor to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges, conveyance of meterials to site hire charges of tools etc complete.
13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1409334.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.63 MB
BOQ_1409334.xls
BOQ • 0.31 MB
OfficeMemorandum.pdf
Other Document • 0.23 MB
Download all tender documents and submit your bid