Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 419 NEW SONAL SERVICE IND ESTATE LINK ROAD MALAD W MUMBAI 400064 | MUMBAI SUBURBAN | MAHARASHTRA | 400064 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance 5TH FLOOR B2 509 BOOMERANG CO OP PREMISES SOCIETY LIMITED CHANDIVALI FARM ROAD CHANDIVALI MUMBAI SUBURBAN MAHARASHTRA 400072 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance FLAT NO 301 SK ORCHID 3RD FLOOR SHAHU MILL ROAD RAJARAMPURI KOLHAPUR 416 001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
14 Feb 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive engineer
Bhatsa Dam Management Division, Bhatsanagar
Repairs and maintenance work at Bhatsa Dam, Tal-Shahapur, Dist-Thane
2025_CWRDK_1147346_1
Rate Call Notice No.7 for 2024-25
Open Tender
Civil Works
Item Rate
30 days
Bhatsanagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
17 Feb 2025
7 Feb 2025
17 Feb 2025
7 Feb 2025
14 Feb 2025
7 Feb 2025
Amount
ABOVE WATER LEVEL
Dismantling loose material / Guniting and Preparation of surface for old U.C.R. masonary including chiselling, wedging and removal of loose mortar, Raking out joints, cleaning by air water jetting etc. complete.
Providing and laying in situ self compacting cement concrete of grade M-20 (20 MSA) with admixture, superplasicizers and curing compound etc. including compacting, curing with all leads and lifts including steel sleep form shuttering etc. complete.
Pack grout filling the internal porous cavities greater than depth of 30cm and upto 1 metre deep in the UCR masonry: Treating the internal cavities greater than a depth 30cm and upto 1 metre deep in the masonry using injection pressure grouting to reduce the porosity of the masonry by drilling hole of 12.5 mm/25mm dia and 200mm deep and fixing PVC nozzles in triangular pattern Minimum 3 nos of PVC nozzles shall be fixed per m2 of the upstream area for grouting. Grouting the deep cavities inside the masonry joint using Poly cementatious materials or equivalent having High strength, quick setting, zero shrink cementatious grout/ along with plasticized, expanding-non shrink grout admixture under required consistency by using 40 psi grouting pump. The grouting material shall give a minimum compressive strength of 35N/mm2 in 28 days when cube tested. All works Complete using all relevant safety equipment’s with all lead and lifts complete as per specification including cost of all materials, machinery, labour, electricity, scaffolding, hanging platform, pulleys ,hire charges of cranes, curing, all relevant safety equipment’s, insurance charges, transportation with all leads and lifts and any other incidental charges as directed by Project Manager.{Work will be measured and paid based on weight of cement and cementitious mixture (without water) used}
Carrying out treatment at vertical Block joints as detailed below : 1.Racking out the Block Joint/ Contraction Joint material completely upto a depth of minimum 150mm from U/S to remove the deteriorated existing system and thoroughly cleaning the surface of the joint to remove all the loose particles, fungus and scale formation by using Air blower & Water jetat pressure. 2. Insertion of compressible Hydrophilic material -To be pushed into contraction joint from upstream side of dam and sealed by inserting compressible hydrophilic backup material which fits into the groove completely. Hydrophilic material shall be filled to a depth of minimum 100 mm. 3. Filling the joint by Polyurethane Sealant material upto and above the upstream surface level starting from the finished hydrophilic material surface. 4. Application of Adhesive and fixing minimum 2mm thick and minimum 150mm wide water resistant, UV resistant TPE(Thermo plastic elastomer)/EPDM based joint tape designed for water tightness of expansion and construction joints whichever as specified by the Project Manager on upstream surface of the Contraction joint. 5. Fixing of minimum 2mm thick Aluminium strips 150mm wide for anchoring TPE/TPO/EPDM (Geomembrane material) to U/s face of dam with the help of fasteners, approved by the Project Manager, placed 500mm c/c on each side of the strip to protect the treatment, by deploying expert labours having experience of working on dam structures by using latest machines, tools and all safety equipments as directed by the Project Manager, inclusive of charges for all materials, scaffoldings, electricity, labour, tools, hanging platform, pulleys, insurance and plants etc. complete.
BELOW WATER LEVEL
Dismantling loose material / Guniting and Preparation of surface for old U.C.R. masonry including chiselling, wedging and removal of loose mortar, Raking out joints, cleaning by air water jetting etc. complete (Under water work)
Raking and cleaning of masonry joints on upstream face of dam for masonry joint filling to a depth of 5cm including preparing of ‘T’ joint of masonry by removing of existing loose portion of stone masonry by breaking (using manual/ mechanical means) removing existing embedded M.S. bar, racking out the masonry joints to required depth, cleaning with air water jet under pressure for removing algae/ fungi etc, complete as per specification including cost of all materials, machinery, labour, scaffolding, hire charges of cranes, insurance charges transportation with all leads and lifts and any other incidental charges as directed by the Project Manager. As Directed by Engineer-In-charge. (Under water work)
Pointing of masonry joints on upstream face dam with UV resistant and anti-shrink materials / Rapid setting mortar/ epoxy based putty using crystalline technology(CT)/ Polymer/ Equivalent Technology, using cementitious materials conforming to BIS/EN-1504-3, Class R4(2014) standards as per requirement to reduce the porosity of concrete/ Masonry structure and to increase the strength of structure masonry joint filling to a depth of 5cm, applying bond coat before repair material application and top coat after finishing, complete as per specification including cost of all materials, machinery, labour, scaffolding, hire charges of cranes, insurance charges transportation with all leads and lifts and any other incidental charges as directed by Engineer-In-charge (Work will be measured and paid based on Weight of cement used). (Under water work)
Filling the deeper cavities or loose material area inside the masonry joints which are beyond 5cm and upto 30 cm using cementitious 1:3 (1 of OPC 53 grade cement ,3 of fine sand) cement mortar mixed with water proofing admixture (having 28th day compressive strength of more than 7.5N/mm2) inside the masonry joint upto 30 cm depth (underneath the top 5cm depth meant for pointing), using raking tools, complete as per specification including cost of all materials, machinery, Curing, labour, electricity, scaffolding, hanging platform, pulleys, hire charges of cranes, all relevant safety equipments, insurance charges, transportation with all leads and lifts and any other incidental charges as directed by Project Manager. (Work will be measured and paid based on Weight of cement used in 1:3 cement sand mortar filling). (Under water work)
Pack grout filling the internal porous cavities greater than depth of 30cm and upto 1 metre deep in the UCR masonry: Treating the internal cavities greater than a depth 30cm and upto 1 metre deep in the masonry using injection pressure grouting to reduce the porosity of the masonry by drilling hole of 12.5 mm/25mm dia and 200mm deep and fixing PVC nozzles in triangular pattern. Minimum 3 nos of PVC nozzles shall be fixed per 1m2 of the upstream area for grouting. .Grouting the deep cavities inside the masonry joint using Polycementatious materials or equivalant having High strength, quick setting, zero shrink cementatious grout/ along with plasticized, expanding-non shrink grout admixture under required consistency by using 40 psi grouting pump. The grouting material shall give a minimum compressive strength of 35N/mm2 in 28 days when cube tested. All works Complete using all relevant safety equipments with all lead and lifts complete as per specification including cost of all materials, machinery, labour, electricity, scaffolding, hanging platform, pulleys ,hire charges of cranes, curing, all relevant safety equipments, insurance charges, transportation with all leads and lifts and any other incidental charges as directed by Project Manager.{Work will be measured and paid based on weight of cement and cementitious mixture (without water) used} (Under water work)
Carrying out treatment at vertical Block joints as detailed below: 1. Racking out the Block Joint/ Contraction Joint material completely upto a depth of minimum 150mm from U/S to remove the deteriorated existing system and thoroughly cleaning the surface of the joint to remove all the loose particles, fungus and scale formation by using Air blower & Water jetat pressure. 2. Insertion of compressible Hydrophilic material -To be pushed into contraction joint from upstream side of dam and sealed by inserting compressible hydrophilic backup material which fits into the groove completely. Hydrophilic material shall be filled to a depth of minimum 100 mm. 3. Filling the joint by Polyurethane Sealant material upto and above the upstream surface level starting from the finished hydrophilic material surface. 4. Application of Adhesive and fixing minimum 2mm thick and minimum 150mm wide water resistant, UV resistant TPE (Thermo plastic elastomer)/EPDM based joint tape designed for water tightness of expansion and construction joints whichever as specified by the Project Manager on upstream surface of the Contraction joint. 5. Fixing of minimum 2mm thick Aluminium strips 150mm wide for anchoring TPE/TPO/EPDM (Geomembrane material) to U/s face of dam with the help of fasteners, approved by the Project Manager, placed 500mm c/c on each side of the strip to protect the treatment, by deploying expert labours having experience of working on dam structures by using latest machines, tools and all safety equipments as directed by the Project Manager, inclusive of charges for all materials, scaffoldings, electricity, labour, tools, hanging platform, pulleys, insurance and plants etc. complete. (Under water work)
Pointing of masonry joints on downstream face dam using cementitious 1:3 (1 of OPC 53 grade cement ,3 of fine sand) cement mortar mixed with water proofing admixture (having 28th day compressive strength of more than 7.5N/mm2) as per requirement to reduce the porosity of concrete/ Masonry structure and to increase the strength of structure masonry joint filling to a depth of 5cm, applying bond coat before repair material application and top coat after finishing, complete as per specification including cost of all materials, machinery, labour, scaffolding, hire charges of cranes, insurance charges transportation with all leads and lifts and any other incidental charges as directed by Engineer-In-charge (Work will be measured and paid based on Weight of cement used).
Naik COnstruction Company (BID ID -6486260)
R.K.Drillers (BID ID -6486046)
Sanrachana Structural Strengthening Pvt Ltd (BID ID -6494961)
Dynasoure Concrete Treatment Pvt Ltd (BID ID -6491963)
SHIVA STRUCTURES PVT LTD (BID ID -6493894)
RDECON STRUCTURAL SOLUTIONS PRIVATE LIMITED (BID ID -6493100)
PRAKASH BALAWANT MENGANE (BID ID -6494150)
stage.html
html • 0.03 MB
finance_1997316.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .