| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.8 L+₹31,352.23 (3.00%)Rejected-AOC ORIYARA HOUSE MAVILAKADAPURAM KASARAGOD PIN 671312 | KASARAGOD | KERALA | 671312 | L2 | Rejected-AOC L2 | |
| 3 | L3₹13.1 L+₹2.6 L (25.0%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹10.5 L
EMD Value
₹26,128
Closing Date
15 Nov 2022, 6:00 pmClosed
Assistant Engineer
Office of the A E ,LID EW Section Cheruvathur
pond renovation
2022_LSGD_526305_2
TN-02/AE/2022-23 dated03/11/2022
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
210 days
Cheruvathur G P
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹26,128
Yes
4 Jan 2023
8 Nov 2022
18 Nov 2022
8 Nov 2022
15 Nov 2022
8 Nov 2022
Amount
Appendix-A Renovation work of Vannathi Kulam
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD230588/2022-2023:DRY STONE Packing USING DEPARTMENT MATERIAL_ Dry stone without concrete levelling course masonry with departmental material including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD230589/2022-2023:DRY STONE Packing _ Dry stone without concrete levelling course masonry with good quality stone including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD9347/2022-2023::Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (Modified 50.6.7.1)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
Renovation work of Payyanki Aattipe Kulam
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD230564/2022-2023:DRY STONE Packing _ Dry stone without concrete levelling course masonry with good quality stone including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD230563/2022-2023:DRY STONE Packing USING DEPARTMENT MATERIAL_ Dry stone without concrete levelling course masonry with departmental material including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD12878/2022-2023::Laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. (Modified 50.6.7.1)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
RAJESH K
C NARAYANAN
Bidder Name
RAJESH K
C NARAYANAN
VINEESH V K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .