Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 Cr Construction of 3 lakh litres capacity OHT with staging height between 20 to 30 m, 5 lakh litres UG sump along with connection pipe lines between existing sump to new sump & distribution lines between OHT to Opal Hostels for NIT at Trichy. | Construction of 3 lakh litres capacity OHT with staging height between 20 to 30 m, 5 lakh litres UG sump along with connection pipe lines between existing sump to new sump & distribution lines between OHT to Opal Hostels for NIT at Trichy. | ₹1.2 Cr | L1 | - |
| 2 | L2₹1.5 Cr+₹22.8 L (18.2%)Financial bid opened Construction of 3 lakh litres capacity OHT with staging height between 20 to 30 m, 5 lakh litres UG sump along with connection pipe lines between existing sump to new sump & distribution lines between OHT to Opal Hostels for NIT at Trichy. | Construction of 3 lakh litres capacity OHT with staging height between 20 to 30 m, 5 lakh litres UG sump along with connection pipe lines between existing sump to new sump & distribution lines between OHT to Opal Hostels for NIT at Trichy. | ₹1.5 Cr+₹22.8 L (18.2%) | L2 | Financial bid opened |
| 3 | L3₹1.9 Cr+₹63.4 L (50.8%) Construction of 3 lakh litres capacity OHT with staging height between 20 to 30 m, 5 lakh litres UG sump along with connection pipe lines between existing sump to new sump & distribution lines between OHT to Opal Hostels for NIT at Trichy. | Construction of 3 lakh litres capacity OHT with staging height between 20 to 30 m, 5 lakh litres UG sump along with connection pipe lines between existing sump to new sump & distribution lines between OHT to Opal Hostels for NIT at Trichy. | ₹1.9 Cr+₹63.4 L (50.8%) | L3 | - |
| 4 | - | - | - | - | |
| 5 | - | - | - | - |
| Sl No | Description | Qty | Unit | M/S K VANI CONSTRUCTION L3 | M/s CREATORS ENGINEERS AND INTERIORS PVT LTD L2 | P VAJJIRAVEL L1 |
|---|---|---|---|---|---|---|
| 1 | Civil Portion | - | - | 5 ₹1,52,41,261.35 | -20 ₹1,16,12,389.6 | -35 ₹94,35,066.55 Lowest |
| 2 | Electrical Portion | - | - | -9 ₹35,82,376.98 | -20 ₹31,49,342.4 | -22.5 ₹30,50,925.45 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
19 Jul 2025, 10:30 amClosed
EE-TRICHY
K M N V S RAVI TEJA
CPWD NIT TRICHY
Construction of 3 lakh litres capacity OHT with staging height between 20 to 30 m, 5 lakh litres UG sump along with connection pipe lines between existing sump to new sump & distribution lines between OHT to Opal Hostels for NIT at Trichy. Subwork/Packages: Construction of 5 Lakh litres UG Sump along with connection pipe lines between existing sump to New Sump & Distribution lines to Opal Hostels for NIT at Trichy
119243
16/EE/TRICHY-I/05/NIT/SE (TRICHY)/CPWD/2025-26
OPEN
Civil Works - Buildings
NCB
6 months
Tiruchirappalli, Tamil Nadu
7 documents required · 7 mandatory
₹3.7 L
Not Applicable
19 Jul 2025
11 Jul 2025
19 Jul 2025
19 Jul 2025
17 Jul 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+16.pdf
document • 2.99 MB
GCC+2023+Constrcution%2Bworks.pdf
document • 23.40 MB
GCC+Construction+Correction+Slip+till+16062025.pdf
document • 21.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .