| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC VALLIKATTIL HOUSE MANGATTOOR KOLENCHERY | ERNAKULAM | KERALA | 680667 | ₹4.2 L | L1 | Accepted-AOC l1 |
| 2 | L2₹4.2 LRejected-AOC | ₹4.2 L | L2 | Rejected-AOC l2 |
| 3 | L3₹4.8 LRejected-AOC PAPPARIL H KADAYIRUPPU KOLENCHERY | ERNAKULAM | KERALA | 680667 | ₹4.8 L | L3 | Rejected-AOC l3 |
| Sl No | Description | Qty | Unit | WILSON V VARKEY L1 | M.P Thampi L2 | ELDO P V L3 |
|---|---|---|---|---|---|---|
| 1.00rectification | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 77.12 | cum | 226.2 ₹17,445.68 | 226.71 ₹17,485.01 | 257.63 ₹19,869.71 |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 6.93 | cum | 2,209.86 ₹15,314.33 | 2,214.9 ₹15,349.26 | 2,516.93 ₹17,442.32 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 159.02 | sqm | 339.05 ₹53,915.73 | 339.82 ₹54,038.18 | 386.16 ₹61,407.16 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 32.08 | cum | 7,523.7 ₹2.4 L | 7,540.84 ₹2.4 L | 8,569.14 ₹2.7 L |
| 1.00 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 160.6 | sqm | 301.85 ₹48,477.11 | 302.54 ₹48,587.92 | 343.79 ₹55,212.67 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 6.6 | cum | 6,965.08 ₹45,969.53 | 6,980.94 ₹46,074.20 | 7,932.89 ₹52,357.07 |
Tender Value
₹4.8 L
EMD Value
₹12,030
Closing Date
9 Oct 2025, 3:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PVIP SUBDIVISION NO 7 KOLENCHERY
It is proposed to construct a side wall at this chainage to strengthen the right bund. A side wall of length 55 m is included in this estimate.
2025_Irrig_803461_1
IRR/PII/3104/2025-2026
Open Tender
Civil Works - Canal
180 days
peringala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,065
Yes
₹12,030
Yes
23 Dec 2025
29 Sept 2025
10 Oct 2025
29 Sept 2025
9 Oct 2025
29 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1335704.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid