Tender ID
Tender Value
₹160.0 Cr
EMD Value
₹1.6 Cr
Closing Date
30 Jan 2026, 6:00 pmClosed
Executive Engineer, Gujarat Housing Board, Rajkot
Detail Designing and Construction of flat Type High Rise Residential Building cum Commercial Units including on site development with all infrastrucure Services for Economically Weaker Section at various place at Rajkot Division under PRADHAN MANTRI AWAS YOJANA 2.0 (U) (PACKAGE 4) 2nd Attempt
267331
2025-26
Open
Civil Works - Buildings
Turn-key
Rajkot
1 document required · 1 mandatory
₹23,600
EXECUTIVE ENGINEER GUJARAT HOUSING BOARD RAJKOT
₹1.6 Cr
20 Jan 2026
20 Jan 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
8 Section - 7 Bill of Quantities
9 Section - 8 Securities and Other Forms
10 Section - 9 Drawings
11 Section - 10 Documents to be furnished by Bidder
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Gujarat Housing Board invites bids for the construction of works detailed in the
table. The bidders may submit bids for any or all of the following works.
P Name of work Approximate Bid Cost of Period #Clas
ac value of security docume of s of
k works (Rs.)(Cr) (Rs.) nt compl Regis
Detail Designing and Cons 159,99,66,050/- 1,60,00, 23600 18 AA
truction of flat Type High 000/- /- Mont Clas
Rise Residential Buildings hs s in
cum Commercial Units spec
on site development with
all Infrastructure Services
for Economically Weaker buil
Section at Rajkot under ding
“PRADHAN MANTRI AWAS
YOJANA 2.0”(2nd attempt)
Location Area Road Width
EWS-2 Shastrinagar,
EWS-2 Jetpur, Rajkot -
Shop (10% Commercial) -
EWS-2 Mahuva, Bhavnagar 58773
EWS-2 Tarsamiya, -
Bhavnagar 80 8300
EWS-2 Tarsamiya, -
Bhavnagar 79 6179
EWS-2 Tarsamiya,
2. Prospective / Interested bidder may download the Bid Documents from website
https://www.tender.nprocure.com free of cost till the Time and Date as mentioned
on online NIT at website https://www.tender.nprocure.com.
3. # However, Bidder who is submitting the Bid Online will have to pay the Bid
Document Fee / Tender Fee through Demand Draft only of any Schedule Bank payable
at Rajkot and in favour of ‘Executive Engineer, Rajkot’. Once the Bid is received online,
Bid Document / Tender Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and Demand Draft/ FDR / Bank
Guarantee against Bid Security / EMD shall be submitted in electronic format through
online (by scanning) while uploading the bid, this submission shall mean that bid
document / tender fee and Bid Security / EMD has been received. Accordingly, the
offer of only those shall be opened whose Bid Document / Tender Fee and Bid Security
/ EMD have been received electronically. However, for the purpose of realization of
Demand Draft, and FDR / Bank Guarantee bidder shall send the same in original
through R.P.A.D. so as to reach to #‘Executive Engineer, GHB Division, Rajkot within
the date and time as mentioned on the online NIT at website
https://www.nprocure.com/ https://tender.nprocure.com under as mentioned under
the Schedule of E-Tendering .
Penal action for not submitting Demand Draft / FDR / Bank Guarantee in
original to Executive Engineer, Gujarat Housing Board, Rajkot / Tender Inviting
Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the
online NIT at website https://www.tender.nprocure.com in the presence of the
bidders or their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the
bids will be opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on 23-01-2026 at 12:00 hrs. at the Office of Executive
Engineer, Gujarat Housing Board, Rajkot to clarify the issues and to answer questions
on any matter that may be raised at that stage as stated in clause 9.2 of
‘instructions to Bidders’ of the bidding documents.
6. Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and should
be rounded off to the next thousand rupees.
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the
bidder cannot modify / edit / withdraw their submitted offer in any case. No
written or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date
of submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with
tender are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and the
bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the
format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked
strictly in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result
in disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the
past, it shall not be deemed to be a ground / reason for not giving required
information for this work / bid.
L. Information supplied for earlier projects shall not be considered while evaluation
of this bid. The Government will not ask for any other information, unless it is
found absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
For Building and Bridge Works following documents shall be submitted by bidders
in electronic format only through online by scanning and the (i) Bid Document Fee /
Tender Fee (ii) Bid Security / EMD should be sent in original to the Office of Executive
Engineer, Gujarat Housing Board, Rajkot / Tender opening authority through RPAD,
so as to reach the Office of Executive Engineer, Gujarat Housing Board, Rajkot /
Tender opening authority within 7 days from last day of submission of Bid.
(i) Bid Document Fee / Tender Fee
(ii) Bid Security
(iii) Registration Certificate of Appropriate Class
(iv) Registration Certificate of Special Category - Building I
(vi) Annual financial Turnover Certificate of last five years issued by CA along with
audited Balance sheet, Proffit loss statement, and auditors reports.
(vii) The Annual Financial Turnover of last five financial years.
(viii) One Similar completed work (RCC building Frame Structure height more than
16.5 mtr/G+4 ) Amounting Rs. 6399.86 Lakh
(ix) Similar Work Experience of last Five years.
(x) Cumulative work on hand along with copy Work orders.
(xi) Other Documents, as required…
INSTRUCTIONS TO BIDDERS
Section 1: Instructions to Bidders Vokra
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 9 19. Sealing & Marking of Bids
2. Source of Funds 25 20. Deadline for Submission of
3. Eligible Bidders 25 21. Late Bids
4. Qualification of the 26 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 30 E. Bid Opening and Evaluation
7. Site Visit 30 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 31 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 31 27. Correction of Errors
10. Amendment of Bidding 32 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 33 F. Award of Contract
13. Bid Prices 34 31. Award Criteria
14. Currencies of Bid and 34 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 34 33. Notification of Award and
Signing of Agreement
16. Bid Security 34 34. Performance Security
17. Alternative Proposals By 36 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 36 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
The work shall be executed on Turnkey basis from design to commissioning services
including soil investigation, all necessary engineering survey, construction, designing,
method of erection in accordance with layout plan and detailed architectural /
structural / services drawings duly approved as specified by GHB / PMC/ Consultant,
nothing extra shall be paid over and above quoted rate.
Scope of work contained in the paragraphs mentioned below is only indicative and not
exhaustive. In addition the contractor shall be responsible for executing all items
required for completing the houses in all respect to make the dwelling units habitable
and ready for occupation including all services, environment-fit for habitation with
electrical, landscaping works, water supply, sewerage, underground storm water drain,
rainwater harvesting system, roads, pathways, rooftop solar panel system, lighening
rrester etc. complete as per direction of Engineer-in-charge. The Indicative Project
Site location no. 1 EWS-2, Shastrinagar, Bhavnagar
Land area 554Sqm
Category Shop EWS - II
Unit carpet area as per
- Sqm 41.00 Sqm
Carpet area of a unit
including utility and N.A. 43.04 Sqm
No. of dwelling units NA
Total carpet area of
Total carpet area NA Sqm
No. of storey G+0 P+7
Parking as per GDCR
Above G+3 - Stilt parking is compulsory.
Parking Basement to be provided if there is space constraint in
providing parking as per GDCR norms.
Site location 2 EWS-2 Jetpur, Rajkot
TP, FP and Survey
Land area 33432 Sqm
Category Shop EWS - II
Unit carpet area as per
As per Planing 41.00 Sqm
Carpet area of a unit
including utility and As per Planing 43.04 Sqm
No. of dwelling units As per Planing
Total carpet area of
482 Sqm 4820.48 Sqm
Total carpet area NA Sqm
No. of storey G + 1 or G P+7
Parking as per GDCR
Above G+3 - Stilt parking is compulsory.
Parking Basement to be provided if there is space constraint in
providing parking as per GDCR norms.
Site location 3 EWS-2 Mahuva, Bhavnagar
Land area 58773 Sqm
Category Shop EWS - II
Unit carpet area as per
Carpet area of a unit NA
including utility and 43.04 Sqm
No. of dwelling units NA
Total carpet area of
NA 16871.68 Sqm
Total carpet area NA Sqm
No. of storey G+0 P+7
Parking as per GDCR
Above G+3 - Stilt parking is compulsory.
Parking Basement to be provided if there is space constraint in
providing parking as per GDCR norms.
Site location 4 EWS-2 Tarsamiya, Bhavnagar(R-31),
Land area 8300 Sq.m.
Category Shop EWS - II
Unit carpet area as per
Carpet area of a unit NA
including utility and 43.04 Sqm
No. of dwelling units NA
Total carpet area of
Total carpet area NA Sqm
No. of storey G+0 P+7
Parking as per GDCR
Above G+3 - Stilt parking is compulsory.
Parking Basement to be provided if there is space constraint in
providing parking as per GDCR norms.
Site location 5 EWS-2 Tarsamiya, Bhavnagar(R-10C)
Land area 6179 Sq.mtr.
Category Shop EWS - II
Unit carpet area as per
Carpet area of a unit NA
including utility and 43.04 Sqm
No. of dwelling units NA
Total carpet area of
Total carpet area NA Sqm
No. of storey G+0 G+3
Parking as per GDCR
Above G+3 - Stilt parking is compulsory.
Parking Basement to be provided if there is space constraint in
providing parking as per GDCR norms.
Site location 6 EWS-2 Tarsamiya, Bhavnagar(R-9)
TP, FP and Survey
Land area 9602 Sq.m.
Category Shop EWS - II
Unit carpet area as per
Carpet area of a unit NA
including utility and 43.04 Sqm
No. of dwelling units NA
Total carpet area of
NA 11018.24 Sqm
Total carpet area NA Sqm
No. of storey G+0 G+3
Parking as per GDCR
Above G+3 - Stilt parking is compulsory.
Parking Basement to be provided if there is space constraint in
providing parking as per GDCR norms.
Note: Total Carpet area of a Unit = Unit’s carpet area as per RERA + Carpet area of utility
excluding parapet wall + Carpet area of balcony excluding safety grill / railing as per
respective drawings enclosed to tender.
Dweling unit plan/Indicative planning is attached herewith for reference only. However,
bidder has to verify the planning at his end for suitability and quote accordingly. The
provided planning is just for information and better understanding with no liability to GHB.
Bidder is free to modify the layout as required. But, minimum carpet area has to be
achieved per DU as per the tender requirement.
1.1 Depedning upon demand of work, the contractor can be awarded additional work
up to 10% of tender indicated work scope by GHB. This additional work shall be
paid at approved tender rates only. (As per R&B, Guj. Govt. GR No. TNC -10 - 2017-
1.2 Floor height is to be maintained 2.9 m (from finished floor lavel to slab bottom) or
as per GDCR whichever is higher
1.3 The proposal of detail architectural and MEP design is to be prepared as per the
guidelines of UD & UHD and prevailing GDCR norms, but not lower than the
minimum specification for various types of dwelling unit criteria mentioned in the
tender and minimum requirement of the project.
1.4 Contractor / Developer have to obtain all the statutory clearance from the
concerned authority as and when required i.e. Fire, Rajachtti, fire opinion,
Environment Clearance, approval for water supply, drainage, electrical services,
lifts, etc. including Building Use (BU) Permisssion with all the required charges to
be paid to the local authority. Contractor shall be responsible for obtaning fire NOC
with all necessary compliance to local authority’s requirement including all
associated cost)
This is EPC Turnkey contract. Bidder has to quote rate per carpet area as 3 FSI is
available for PMAY projects. Purchase of additional FSI or Saving in FSI is not
applicable in this Tender.
1.5 Contractor / Developer will get the detailed soil investigation done as per relevant
IS code, NBC code etc. as applicable through any nationally accredited lab. The
department may varify the results submitted by the Contractor/ Developer, if
1.6 Tenderer may satisfy himself by conducting pre soil test if so required.
1.7 Prepare complete structural design, drawing for foundation, super structure and
for other related structures in the Housing pocket i.e. UGRs, Pumps, DG set, Pump
houses, etc. to be provided in this Housing scheme as per provision contained in IS
code / relevant codes, but not lower than the minimum specification mentioned in
the tender and minimum requirement of the project.
1.8 Provision of protection against seismic forces as per relevant IS codes for structure
1.9 The structural drawing shall be approved as specified by PMC. If any modification
in design / drawing is needed, as per site conditions, the Contractor / Developer
shall do / redo without any extra cost. The decision of the GHB shall be final and
binding. No claim whatsoever will be entertained in this regard.
1.10 Planning, preparing drawing for internal services, landscaping, and execution
of the same i.e. internal sanitary work, water supply work, drainage system etc.
complete for the building including all pipes, its fittings, testing etc. complete.
1.11 For the project all the necessary approval and permission is to be taken by
the bidder at his own expenses and all the refundable deposits (excluding all type
of electrical connections) will be borne by GHB. Further Bidders please note that,
the TP incremental charge (Betterment & Amenities Charges for land only) for
the land will be borne by GHB. Local electrical supply company deposits for meter
& transformer etc. shall not be refundable and shall be borne by the Bidder only.
- Also for water connection, Drainage Connection and Electric Connection
charge shall be in the scope of contractor. Also External Electrical works
including HT substation within campus is in scope of contractor. GHB will
sign required documents only.
- The Contractor shall get the project registered with RERA in due
coordination with GHB. The Contractor shall be solely responsible for all
necessary documentation, compliance, legal obligations, etc. related to
RERA regulations.
1.12 Water supply: Water supply lines will be laid as per scheme prepared,
submitted by the contractor and approved as specified by PMC appointed by
A. UGR of the required capacity / of the quantity approved by PMC
appointed by GHB.
B. Planning, designing and construction of underground reservoirs,
waterpump houses for water supply, for fire-fighting tank including
installing of pumps, standby water supply pumps as per approved
drawings / specifications or as directedby Engineer-in-charge.
C. Pumping arrangement from UGR to OHT of each block shall have to be
provided by contractor.
D. External water supply within the premises shall have to be provided by
the contractor.
E. Contractor shall have to construct tube wells as per the requirements
for DUs and Horticulture in addition to supply of corporation /
nagarpalika. Capacity of tube wells shall be sufficient so, if in case of
breakdown service of corporation / nagarpalika for water supply, water
can be supplied to benificiaries with tube well. Tube well shall be
executed with items as per relevant IS Code.
External water supply infrastructure arrangement within the premises
(including water pipeline from UG tank to ULB supply line on external
road) shall have to be provided by the contractor. One or more bore of
sufficient capacity to fill UG tank within 8 hours shall be provided by
contractor for domestic water supply in every plot as per concern with
department. Also if the bore well used during construction work by the
contractor, all the pump sets/pipes/cables etc. will have to replace with
new by the contractor and warranty shall be start from the date of
handover/possession of the houses. Nothing extra shall be payable.
1.13 Refuse area will be constructed in the building as per GDCR
requirement/Local authority requirements. Internal storm water drain
(underground pipe) to be designed and constructed with Rain water harvesting
system as per approved norms. Trenches, sump and de-water pumping system
of adaquate numbers and capacity as per approved design shall be provided for
basement with disposal arrangement directly to the external storm / sewage
drain of local authority. The de-watering pump for this shall be cutter type
submersible pumps. Responsibility of getting storm water drain system
approved is included in the scope of work
1.14 Planning, designing and execution of all services like water supply, rain water
harvesting system, roof top solar panel system, sewerage, drainage system,
roads, paths, electrification and all connected sub structures and super structures
within the premises, as per by-laws and norms of the local bodies including
making connections with the peripheral services after getting the services design
approved from the local bodies/ Central Ground Water Board, GHB’s role shall be
limited only to sign the application/ drawings / documents for submission to the
local bodies in the capacity of the owner for approval. In case of water supply and
sewerage, the responsibility of getting the scheme approved from service
provider (HOUSING BOARD/ULB ) is included in the scope of work/ tender apart
from internal and external water supply/ sewerage & drainage lines to be laid to
make the system of water supply and sewerage and drainage functional/
complete. However, the cost of connection of water supply lines/ sewer lines
from peripheral connection point/ out fall sewer shall also be borne by
contractor. If in any case in the nearby plot area water supply and sewerage
infrastructure are not available from corporation and nagarpalika then
contractor has to provide sufficient number and capacity tubewell for water
supply. The Contractor must provide Sewage Treatment Plant/Tertiary Sewage
Treatment plant as suggested by GPCB/Local authority.
If suggested or required by CPCB/GPCB/Local Authority, the contractor must
provide Sewage Treatment plant/Tertiery Sewage Treatment plant .
1.15 The bidder has to carry out maintenance till successfully handover services
to the society of association without any extra cost. The following items to be
procured with warrantee/guarantee for 2 years from the supplier and bidder
shall ensure that any defects or damage occurring under normal operating
conditions (excluding misuse or negligence by the Association) are rectified or
replaced at no additional cost during the warranty period:
Water supply system with tube wells
Pumps for domestic / flushing water supply and fire protection
Solar panel system
Streetlights, Common lights (LED lights)
Fire protection system
Elevators / Lifts
Underground Storm water drainage and External Sewerage
The Contractor has to handover dwelling units to beneficiaries on a pro-rata basis
based on completion of dastavej between GHB and beneficiaries. The Dwelling units
shall be defect free at the time of handing over.
Preparation of landscaping plan including parks, plantation and execution of the same with
i) The development of park: water hydrants, grassing creeper planting trees
etc. complete as per HOUSING BOARD/ULB norms as per specification and
drawing approved by the competent authority of GHB.
ii) Complete levelling/ dressing including filling of earth, its supply, disposal of
surplus earth, (if any) shall be the property of GHB & will be disposed to the
approved disposal point or at the place as directed by engineer in charge. No
extra payment for disposal shall be allowed.
1.16 Planning, designing and construction of boundary wall for the whole scheme area,
decorative MS gate of height not less than 1.8 m and weight shall not be less than
kg/sqm, above gate and approx. 6.0 m and above height from FFL decorative slab to
cast at entrance to give better appearance of entryalong with wicket gate and Security
cabin of size not less than 9.0 sqm, dust bin, sign boards, guide map, location board,
direction boards, numbering of Housing with benificiary name to be displayed at
parking of wooden / ss plate as approved by GHB, letter box of size 230 x 75 x 280 mm
from 22 guage steel plate with lock etc. complete as per drawing approved by GHB.
1.17 All the internal roads shall be of tremix RCC roads having width as per GDCR norms
and 1.00 mt. wide paths shall be covered with 60 mm thick M30 grade rubber moulded
paver blocks with PCC as per design approved by GHB.
1.18 Taking all precautionary measure to safeguard against any accident for the
contractors employees, general public, supervisory staff of GHB by providing necessary
safety equipments, helmets and MS sheet barricading etc. at work site. The site has to
be kept clean all the time of all debris, rubbish, and dirt & surplus/waste material.
1.19 De-silting will also be done by the contractor before handing over the completed
Housing pocket to GHB. All machine, equipment and labour for this purpose will be
arranged by contractor.
1.20 Contractor shall provide internal as well as external infrastructure for all the DUs
with liaison to DGVCL/TORRENT the rates include all the necessary provisions
required to be made to get electricity for all DUs i.e. extension of electric lines,
transformers, inclusive of increasing load by calculating all DUs requirements, deposits
to be paid in DGVCL/TORRENT etc. complete. Also with DUs electrification scope of
work includes electrification for common purpose like street lights, lifts, water pump
sets etc. No extra payment shall be paid for any work related to electrical infrastructure.
1.21 The Contractor will submit the model for layout of the project specifying
details provided in layout along with in the tender documents in one month from
stipulated date of start. He will also submit a model of modules of houses
specifying all floors and its adjoining area. The scale of module shall be 1:500 for
layout plan and 1:100 for dwelling unit. The bidder has to provide a model of
layout and building unit along with a walkthrough presentation in one month from
stipulated date of start.
1.22 Contractor shall erect batch mix plant (minimum 30 cum/hr or more) fully
automatic, computerized for preparation of Design mix concrete as per IS code at his
own cost and shall prepare all concrete accordingly.
1.23 Internal & external electrification work as per specification given in the tender
document & directions of GHB as per scope of work & specifications appended with the
NIT which includes LT/ HT supply, water supply arrangement, fire-fighting, lightening
arrester, roof top solar panel system, lifts and DG sets, for both the interior and exterior
As per minimum specification point no.
“For small sites with space constraints, contractor can use RMC after approval from
Engineer-In-Charge”
1.24 Contractor has to obtain labour licensee from Gujarat labour welfare board.
1.25 Defect liability period would be uniformly seven years from the date of
completion of the project or possession of building taken over by resident association
whichever is later. However maintenance of other building activities, such as
cleaning, sweeping of pocket & de-silting of sewer lines, S.W. Drain shall be done only
once prior to handing over the respective pocket. The maintenance will be only
limited to removal of defects noticed in the works carried out by the contractor during
defect liability period. Repair and maintenance of lift and all the pump sets of bore
well, underground sump & Fire tank shall be the responsibility of contractor for at
least 1 year after handing over of services to association. Thereafter beneficiaries
association will maintain the lift service. Nothing extra shall be payable.
1.27 The final ground level will be decided soon before actual start of work to avoid
water logging at site. In any case other land stormwater passing from scheme area
should not allow. Contractor has to raise the ground as per requirement to resolve this
issue. Plinth level shall be minimum (+) 600 mm above the nearby highest finished road
level and Parking floor level shall be minimum (+) 150 mm above the nearby highest
finished road level or natural ground level of the plot whichever is higher.If natural
ground level (NGL) of proposed project site is lower than nearest existing highest road
level, than required earth filling up to highest road level by keeping gradual slope to
easy drain out of rain water towards main entry should be done without claiming any
extra cost. For above arrangement contractor has to do all necessary work without
claiming any extra cost. Changes, if any, would not affect the agreed rates and no claim
on this account shall be entertained. If in any case NGL is (+) 600 mm above the nearby
highest finished road level, contractor has to keep plinth at least 150mm higher than
1.28 The above scope of work includes cost of all materials, manpower, equipment’s,
T&P, Fixtures, accessories, royalties, taxes, watch & ward, and all other essential
elements for completion and maintenance of works as aforesaid whatsoever the
approval accorded by GHB before acceptance of tender is only for tendere valuation.
Any change, modification, revision etc. required to be done by GHB, proof consultants
etc. in accordance with applicable standards and tender document will have to be done
at contractor’sacost and nothing extra shall be payable. Also contractor shall have to
take all the permissions including B.U. permission from the concerned departments on
his own expense required as per rules and regulations. The Contractor shall get the
project registered with RERA in due coordination with GHB. The Contractor shall be
solely responsible for all necessary documentation, compliance, legal obligations, etc.
related to RERA regulations.Stipulated time limit, to complete the entire work fit for
habitation is as per Tender notice.
1.29 2 hr fire rating should be for all structural component of building. Slab thickness
should be minimum 115 mm or as per 2 hr fire rating whichever is higher.
1.30 One stretcher cum pessengare lift of adequate size shall be provided in each block.
Capacity of strectcher cum passenger lift shall be minimum 15 person and while
capacity of fire lift shall be minimum 8 persons. The provision of strectcher cum
passenger lift & fire lift is mandatory in building as per GDCR/NBC normsor above,
whichever is more.
1.31 Any changes needs revision in drawing or in execution should have to be done by
contractor without any extra claim. Rajachitthi and all other necessary Government
approvals, if required shall be obtain by the contractor at his own cost. Contractor shall
engage their own Engineer / Architect on record, Clerk of Works on record, Strucrure
Engineer on record, Supervisor on record, etc. registered with the local authority for
getting rajacthitthi.
1.32 Contractor has to submit compliance report of remarks (observation) given by
PMC/GHB during scrutiny and review of architectural, structural and MEPF drawings
with revision of the drawings invariably.
1.33 For Architectural, Structural and MEPF services contractor has to submit DBR
(Design Basis Report) with conceptual drawing, data sheet and calculation before
submitting Architectural, structural and MEPF detail drawing for review. MEPF design
shall be carried out based on latest NBC norms and guidelines and relevant IS codes.
1.34 Approval from CFO for fire fighting provision and approval for electrical provision
like substation, meter room, alignment of conduit for electrical work any MEPF
drawings is in the scope of Contractor.Any changes needs revision in drawing or in
execution should have to be done by contractor without any extra claim.
1.35 DG-Set shall be in the scope of conractor of adequate capacity for Lifts, Fire fighting,
water supply, parking and common area lighting of each blocks, utilty (pump room,
meter room, security cabin) areas, street lights.
1.36 Testing of materials as per relevant IS code to be followed and it is in the scope of
1.37 Contractor to design and construct the houses by covering minimum specification
for vatious types of dwelling units & minimum specification mentioned in tender.
1.42 DEVELOPMENT DETAILS
Detail Planning Norms as per the guidelines of latest NBC and Urban Development
and Urban Housing Department & latest GDCR.
The developer / contractor should also maintain the design as per the GDCR, town
planning norms & bench marking standards set by the competent authority.
General planning and finishing should be such that enhances overall stability and
1.43 The Gujarat Housing Board invites bids for the Construction of works (as defined
in these documents and referred to as ‘the works”) detailed in the table given in
IFB. The bidders may submit bids for any or all of the works detailed in the table
1.44 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.45 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are
1.46 The title of land is with Gujarat Housing Board. If any issues regarding
possession of site incures in future, amicable solution will be taken at board level.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat /
Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information,
a statement that the Bidder is neither associated, nor has been associated, directly
or indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to
provide consulting services for the preparation or supervision of the works, and
any of its affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information,
a preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to
be adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
#4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Post Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum
pass/ fail criteria regarding the Applicant’s general and particular experience,
personnel and equipment capabilities and financial positions, as demonstrated by
the applicant’s responses in the forms attached to the letter of application (
specified requirement for joint ventures are given under para 4.6 below )
Subcontractors experience and resources shall not be taken in to account in
determining the applicants compliance with the qualifying criteria
To qualify for more than one contract, the applicant must demonstrate having experience
and resources sufficient to meet the aggregate of the qualification criteria for each
contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and
the financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
Applicant should indicate actual figures of costs and amount for the works
executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign
currency the above enhanced multiplying factors will not be applied. Instead, the
current market exchange rate (State Bank of India BC Selling rate as on the last
date of submission of the bid) will be applied for the purpose of conversion of the
amount in foreign currency into India rupees.
4.5.3. General Experience.
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum annual financial turnover (defined as billing for works
in progress and completed in all classes of civil engineering construction
works only) in any one year, over the last five years of the annual value of
contract / contracts applied for.
(b) Experience in successfully completing or substantially completing at least one
residential housing/commercial project of height more than 16.5 m/G+4 of
at least 40 percent of the value of proposed contract within the last five
The works may have been executed by the applicant as prime contractor or
as a member of a joint venture or as a nominated sub-contractor. As
subcontractor, he should have acquired the experience of execution of all
major items of works under the proposed contract. In case a project has been
executed by a joint venture, weight towards experience of the project would
be given to each joint venture in proportion to their financial participation
in the joint venture.
Substantially completed works means those works which are at least 90 %
completed as on the date of submission (i.e. gross value of work done up to
the last date of submission is 90 % or more of the original contract price)
and continuing satisfactorily.
For these, a certificate from the employers shall be submitted along with the
application incorporating clearly the name of the work, contract value,
billing amount, date of commencement of works, satisfactory performance
of the contractor and any other relevant information.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish
with their bid, a detailed construction planning and methodology supported with
layout and necessary drawings and calculations to allow the employer to review
their proposals. The numbers, types and capacities of each plant/equipment shall
be shown in the proposals along with the cycle time for each operation for the
given production capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available,
liquid assets (aggregate of working capital, cash in hand and uncommitted bank
guarantees) and / or credit facilities up to 25 percent of the value of the contract
/ contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If
necessary, the employer will make inquiries with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration
resulting from contracts completed or under execution by him over the last five years.
A consistent history of awards against the Applicant or any partner of a joint venture
may result in failure of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have:
Made misleading or false representation in the forms, statements submitted, and
Record of poor performance such as abandoning the work, rescinding of contract
for which the reasons are attributable to the non – performance of the contractor;
consistent history of litigation awarded against the applicant or financial failure
due to bankruptcy. The rescinding of contract of a joint venture on account of
reasons other than non – performance, such as Most Experienced partner of joint
venture pulling out, court directions leading to breaking up of a joint venture
before the start of work, which are not attributable to the poor performance of the
contractor will, however, not affect the qualification of the individual partners.
#4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others)
(Applicable only for estimated project cost of 50 Crore and above)
4.6.1. Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para
4.5.3 & 4.5.6 above. The joint venture must collectively satisfy the criteria of para
4.5.3 & 4.5.6 above. The experience of the other joint venture partners shall be
considered if it is not less than 30 percent of the qualifying criteria in para 4.5.3
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and
shall be submitted with a copy of the joint venture agreement providing the joint
and several liabilities with respect to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its partners
individually or as a partner in any other joint venture. In case dissolution of a joint
venture, each one of the constituent firms may qualify if they meet all the
qualification requirements, subject to the written approval of the Employer.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if
their available bid capacity at the expected time of bidding is more than the total
estimated cost of the works. The available bid capacity will be calculated as under:
Assessed Available Bid Capacity = ( A*N*2-B), where
A = Maximum value of work executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into
account the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works
to be completed during the next 2 years ( period of completion of work for
which bids are invited ); and
N = Number of years prescribed for completion of the works for which the bids
Note :- In Case of joint venture, the available bid capacity will be applied
for each partner to the extent of his proposed participation in the
execution of the work.
4.8 Even though the bidders meet the above qualifying criteria, they are subject
to be disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals
with the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of
his Bid, and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that may
be necessary for preparing the Bid and entering into a contract for construction
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and
addenda issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as
Volume-V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of
contract, contract data, forms, terms, technical specifications, bill of quantities,
forms, Annexes and drawings in the Bid Document. Failure to comply with the
requirements of Bid Documents shall be at the bidder’s own risk. Pursuant to
clause 26 hereof, bids which are not substantially responsive to the
requirements of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may
notify the Employer in writing or through E-mail at the Employer’s address
indicated in the invitation to bid. The Employer will respond to any request for
clarification which he received earlier than 15 days prior to the deadline for
submission of bids. Employer’s response will be published on website including
a description of the enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting
which will take place at the address, venue, time and date as indicated in the
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on
any matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to
reach the Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the
source of enquiry) and the responses given will be published without delay on
the tender website i.e. www.tender.nprocure.com. Any modification of the
bidding documents listed in sub-Clause 8.1 which may become necessary as a
result of the pre-bid meeting shall be made by the Employer exclusively
through the issue of an Addendum pursuant to Clause 10 and not through the
minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the
bidding documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The
Employer will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause
8.1) shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Schedule for Quoting of Rates for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based
on the priced Schedule for Quoting of Rates submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and
words) for all items of the Works described in the Schedule for Quoting of Rates
along with total bid price (Both in figures and words). Items for which no rate or
price is entered by the bidder will not be paid for by the Schedule for Quoting of
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid
Price submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian
Rupees. All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline
date forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the
Employer may request that the bidders may extend the period of validity for a
specified period. A bidder may refuse the request without forfeiting his bid
security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his security for a
period of the extension, and in compliance with Clause 16 in all respects.
#16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown
in column 4 of the table of IFB for this particular work. This Bid security shall be
in favor of Employer as named in Appendix and may be in one of the following
a. Bank Guarantee from any scheduled Indian bank, in the format given in
Volume III. (Bank Guarantee is applicable only for Bid Estimated
Amount of 01 Crore and above) and Bank Guarantee of Schedule and
Private Banks shall be considered as per GoG Finance Department’s
Circular No. FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as
per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign
Bank approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1) Road &
Building Department or (2) Narmada Water Resources, Water Supply and
Kalpsar Department of Govt of Gujarat. Exemption Certificate is
applicable only when Registration Certificate of Appropriate Class
and Category of Approved Contractors is required as eligible criteria
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety
for the bid shall be valid for 45 days beyond the validity of the bid i.e. total validity
of 120+45 = 165 Days
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as
indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer
as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the
end of the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has
signed the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit
to (i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited and
his tender will be rejected. Punitive action will be taken on such contractors. (As
per GoG R&B Dept’s Gr. No. S/22/2017/6369/D, Dt.08/06/2018)
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance
or time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered
further in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause
of these Instructions to bidder as the “Technical Bid “and “Financial Bid” in
separate parts to be uploaded.
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of
the Employer and the bidders previously subject to the original deadline will then
be subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed
in Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids
and the expiration of the original period of bid validity specified in Clause
above or as extended pursuant to Clause 15.2 may result in the forfeiture of the
Bid security pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made
pursuant to Clause 22, in the presence of the Bidders or their representatives who
choose to attend at time, date and the place specified in Appendix in the manner
specified in Clauses 20 and 23.3, In the event of the specified date of Bid opening
being declared a holiday for the Employer, the Bids will be opened at the
appointed time and location on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security furnished
does not conform to the amount and validity period as specified in the invitation
for bid (ref. Column 4 and paragraph 3), and has not been furnished in the form
specified in Clause 16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with
respect to the Qualification information and other information furnished
in part I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the
clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification
the Evaluation Committee will finalize the list of responsive bidders whose
financial bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the
total amount of each bid, any discount and such other details as the Employer
total amount of each bid, any discount and such other details as the Employer
may consider appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the
total amount of each bid, any discount, and such other details as the Employer
total amount of each bid, any discount, and such other details as the Employer
may consider appropriate, will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to
23.9 The Employer shall prepare minutes of the Bid opening, including the
information disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison
of Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to
influence the Employer’s processing of Bids or award decisions may result in the
rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer
may, at his discretion, ask any Bidder for clarification of his Bid, including
breakdowns of unit rates. The request for clarification and the response shall be
in writing or by e-mail, but no change in the price or substances of the Bid shall be
sought, offered, or permitted except as required to confirm the correction of
arithmetic errors discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to bring
additional information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid
evaluation, bid comparison or contract award decision may result in the rejection
of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine
whether each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b)
has been properly signed; (c) is accompanied by the required securities and; (d)
is substantially responsive to the requirements of the Bidding document. During
the detailed evaluation of the “Financial Bid”, the responsiveness of the bids will
be further determined with respect to the remaining bid conditions, i.e., priced
Schedule for Quoting of Rates, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits
in any substantial way, inconsistent with the Bidding documents, the Employer’s
rights or the Bidder’s obligations under the Contract; or (c) whose rectification
would affect unfairly the competitive position of other Bidders presenting
substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the
requirements of the Bidding documents or otherwise result in unsolicited benefits
for the Employer, shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will
not be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the
Engineer’s estimate of the cost of work to be performed under the contract the
Employer may require the Bidder to produce detailed consistency of those prices
with the construction methods and schedule proposed. After evaluation of the
price analyses, the Employer may require that the amount of the performance
security set forth in Clause 34 be increased at the expense of the successful
/bidder to a level sufficient to protect the Employer against financial loss in the
event of default of the successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are
unrealistically priced low and which cannot be substantiated satisfactorily by the
bidder may be rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose
Bid has been determined.
(i) to be substantially responsive to the Bidding documents and who has
offered the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price
which is the lowest evaluation in any of the packages opened earlier than
the one consideration.
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest
evaluated bid. The contract will in such cases be awarded to the next lowest
bidder at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject
any Bid, and to cancel the Bidding process and reject all Bids, at any time prior to
the award of contract, without thereby incurring any liability to the affected
bidder or Bidder or any obligation to inform the affected Bidder or Bidders of the
grounds for the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or facsimile
confirmed by registered letter. This letter (hereinafter and in the condition of
contract called the “Letter of Acceptance”) will state the sum that the Employer
will pay the Co ntractor in consideration of the execution, completion, and
maintenance of the Works by the Contractor as prescribed by the Contract
(hereinafter and in the Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject
only to the furnishing of a performance security in accordance with the
provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of
Acceptance. Within 21 days of receipt, the successful Bidder will sign the
Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
34. Performance Security
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder
shall furnish to the Employer an irrevocable and unconditional guarantee
from a Bank in the form set forth in Section 8 (the “Performance Security”)
for an amount equal to 5% (five percent) of its Contract Price. In case of bids
mentioned below, the successful Bidder, along with the Performance
Security, shall also furnish to the Authority an irrevocable and unconditional
guarantee from a Bank in the same form given at Section 8 towards an
Additional Performance Security (The “Additional Performance Security”) for
an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10%
but upto 20% of the Estimated Project Cost, then the Additional
Performance Security shall be calculated @ 20% of the difference in
the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus
10% of the Estimated Project Cost and (ii) Contract Price offered by
the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20%
of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 30% of the difference in the (i)
Estimated Project Cost (as mentioned in Bid Document) - Minus 10%
of the Estimated Project Cost and (ii) Contract Price offered by the
selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the
Defects Liability Period and the Additional Performance Security shall be
valid beyond 28 (twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a
Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India
and acceptable to the Employer. As per GoG Finance Department’s Circular No.
FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
34.1 shall constitute sufficient grounds for cancellation of the award and
forfeiture of the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as
stipulated in the Conditions of Contract, subject to maximum amount, as stated
in the Contract Data.
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in
completing for the contract in question and will declare the firm ineligible, either
indefinitely or for a stated period of time, to be awarded a contract with National
Highways Authority of India/ State PWD and any other agencies, if it at any time
determines that the firm has engaged in corrupt or fraudulent practices in
completing for the contractor, or in execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause
of the Conditions of Contract.
APPENDIX TO ITB
Clause Reference
With respect to
1. The Name of the Employer is Gujarat Housing Board [ Cl.1.1]
2. The last five years.
3. This Annual Financial Turnover Amount is Rs. 106,66,44,033.33/- [Cl.4.5.3 (a)]
4. Value of Work is Rs. 159,99,66,050.00/-
6. The cost of electric work is Rs.
7. The cost of water supply / sanitary works is Rs.
8. Liquid assets and / or availability of credit facilities [Cl.4.5.6 ]
9. Price level of the financial year [Cl. 4.5.2]
10. The pre-bid meeting will take place at …………. [Cl. 9.2.1]
11. The technical Bid will be opened at the office of the
12. Address of the Employer:
14. The bid should be submitted latest by [Cl. 20.1 & 20.2]
As stated on online NIT
15. The bid will be opened at Rajkot [Cl. 23.1 ]
As stated on online NIT
16. The Bank Draft in favor of Executive Engineer, GHB, Rajkot
18. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common base
value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which
they propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
Contractors Superintendence, Supervision, Technical Staff & Employees:
i. The contractor shall provide all necessary superintendence during execution
of the work and all along thereafter as may be necessary for proper fulfilling of
the obligations under the contract.
ii. The contractor shall immediately after receiving letter of acceptance of tender
and before commencement of the work, intimate in writing to the Engineer-in-
Charge the name(s),qualifications, experience, age, address(s) and other
particulars along with certificates, of the principal technical representative to
be in-charge of the work and other technical representative(s) who will be
supervising the work. The Engineer-in-Charge shall within 3 days of receipt of
such communication intimate in writing his approval or otherwise of such a
representative(s) to the contractor. Any such approval may at any time be
withdrawn and in case of such withdrawal, the contractor shall appoint another
such representative(s) according to the provisions of this clause. Decision of
the tender accepting authority shall be final and binding on the contractor in
this respect. Such a principal technical representative and other technical
representative(s) shall be appointed by the contractor soon after receipt of the
approval from Engineer-in-Charge and shall be available at site before start of
iii. All the provisions applicable to the principal technical representative under the
Clause will also be applicable to other technical representative(s). The
principal technical representative and other technical representative(s) shall
be present at the site of work for supervision at all times when any construction
activity is in progress and also present himself/themselves, as required, to the
Engineer in-Charge and/or his designated representative, to take instructions.
Instructions given to the principal technical representative or other technical
representative(s) shall be deemed to have the same force as if these have been
given to the contractor. The principal technical representative and other
technical representative(s) shall be actually available at site fully during all
stage of execution of work, during recording/checking /test checking of
measurements of works and whenever so required by the Engineer-in-Charge
and shall also note down instructions conveyed by the Engineer-in-Charge or
his designated representative(s) in the site order book and shall affix his/their
signature in token of noting down the instructions and in token of acceptance
of measurements/checked measurement/ test checked measurements. The
representative(s) shall not look after any other work. Substitutes, duly
approved by Engineer-in-Charge of the work in similar manner as aforesaid
shall be provided in event of absence of any of the representative(s) by more
iv. If the Engineer-in- charge, whose decision in this respect is final and binding on
the contractor, is convinced that no such technical representative(s) is/are
effectively appointed or is/are effectively attending or fulfilling the provision
of this clause, a recovery (non-refundable)shall be effected from the contractor
and the decision of the Engineer-in-Charge as recorded in the site order book
and measurement recorded checked/test checked in Measurement Books shall
be final and binding on the contractor. Further if the contractor fails to appoint
suitable technical Principal technical representative and/or other technical
representative(s) and if such appointed persons are not effectively present or
are absent by more than two days without duly approved substitute or do not
discharge their responsibilities satisfactory, the Engineer-in-Charge shall have
full powers to suspend the execution of the work until such date as suitable
other technical representative(s) is/are appointed and the contractor shall be
held responsible for the delay so caused to the work. The contractor shall
submit a certificate of employment of the technical representative(s) along
with every on account bill/final bill and shall produce evidence at any time so
required by the Engineer-in-Charge.
v. The contractor shall provide and employ on the site only such technical
assistants as are skilled and experienced in their respective fields and such
foremen and supervisory staff as are competent to give proper supervision to
vi. The contractor shall provide and employ skilled, semiskilled and unskilled
labour as is necessary for proper and timely execution of the work. The
Engineer-in-Charge shall be at liberty to object to and require the contractor to
remove from the works any person who in his opinion misconducts himself, or
is incompetent or negligent in the performance of his duties or whose
employment is otherwise considered by the Engineer-in-Charge to be
vii. Such person shall not be employed again at works site without the written
permission of the Engineer in-Charge and the persons so removed shall be
replaced as soon as possible by competent substitutes. The technical staff
required at site as per quantum of work but minimum at each site, as per table
MINIMUM REQUIREMENT OF TECHNICAL REPRESENTATIVE(S)
Employment of a qualified site engineer by contractor (Package wise):
The contractor shall employ full time technically qualified staff during the execution
of this work as under:
One Project Manager B.E./B.Tech. Civil having minimum 15years of
One Graduate Civil Engineers (having 5 years experiecne) for Two High rise
towers & One Diploma Civil Engineers (having 10 years experience) for each
Electrical site Engineer having Degree in Electrical with 05 years experience.
The Engineer employed must have sufficient experience to handle the work
independently. Such an Engineer shall have to stay at the site of work and he
shall not be entrusted with any other duty except of this work.
One Sr. Surveyor having 10 years experience with one Surveyor having
years experience.
One QA / QC Engineer with minimum 5 years experience.
No. of persons will depend on the size of project and as per instruction of
Engineer-in-charge.
Within 15 days of issue of work-order the Contractor will have to furnish to
Engineer-in-charge of the work the Name, Qualifications, copy of mark sheet, Colour
Photograph and the appointment order issued such engineers engaged for this
contract work. If 15 days after issue of work order such designated Site Engineers
do not resume or do not remain present on site of work, the recovery at the rate of
Rs.15,000-00 per month per Engineer will be made from the bills/deposit/dues of
the contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used
for the purpose of post qualification as provided for in Clause 4 of the Instruction to
Bidders. This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration _________________________________
Principal place of business _________________________________
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2024-2025
Work performed in the last five years 2023-2024
(in Rs. Lakhs) 2022-2023
1.3.1 Work performed as prime contractor, work performed in the past as a nominated
sub-contractor will also be considered the sub-contract involved execution of all
main items of work described in the bid documents, provided further that all other
qualification criteria are satisfied (in the same name) on works of a similar nature
over the last five years** and in current year before the submission of the bid.
Projec Name of Descriptio Contrac Value Date Stipulated Actual date Remark
t the n of work t No. of of period of of explainin
Name Employe contrac issue completio completion g reasons
r t (Rs. of n * for delay
Crore) work & work
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as
a nominated sub-contractor, will also be considered provided the sub-contract
involved execution of all main items of work described in the bid document,
provided, further that all other qualification criteria are called (in the same name
and style) in the last five years** and in current year before the submission of
Year Name Name of Quantity of work performed (Cum/MT) Remarks*
of the the Cement Masonry Earth Bituminous (indicate
work Employer Concrete Works Work contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and
works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Descriptio Plac Contrac Name & Value Stipulated Value of Anticipate
n of works e& t No. Address Contrac Period of Works* d of
State of t (Rs. Completio remaining completion
Employe Cr) n to be
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Sub-Contractor Experience in
works Contractor (Name & similar work
Attach copies of certificates on possession of valid license for executing water
supply/ sanitary work/ building electrification works.
1.8 Financial reports for the last five years: audited balance sheets, profit and loss
statements, auditors’ reports (in case of companies/corporations), etc. List them
below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the
instruction to Bidders. (Name of Consultant engaged for project preparations is *
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
* Fill the name of Consultant
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. _______________________________________ is a reputed company
with a good financial standing.
If the contract for the work, namely ________________________________ is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. ________________ to meet their working capital requirements for executing the
above during the contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the
required attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s. _____________
work of Government of Gujarat/Government of India/any Board or
Corporation under Government of Gujarat/Government of India nor any
contract awarded to us for such works have been rescinded, during last five
years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm
or corporation to furnish pertinent information deemed necessary and
requested by the Department to verify this statement or regarding any (our)
competence and general reputation.
4. The Undersigned understands and agrees that further qualifying information
may be requested, and agrees to furnish any such information at the request
of the Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake that our firm
M/s………………………………………………………..………………………….. would invest a minimum
cash up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General P. No. D. Cost Control
1 Definitions 58 37 Bill of Quantities
2 Interpretation 59 38 Changes in the Quantities
3 Language and Law 60 39 Variations
4 Engineer’s Decisions 60 40 Payments for Variations
5 Delegations 60 41 Cash Flow Forecasts
6 Communications 60 42 Payment Certificates
7 Sub-Contractors 60 43 Payments
8 Other Contractors 61 44 Compensations Events
9 Personnel 61 45 Tax
10 Employer’s & Contractor Risk 61 46 Currencies
11 Employers Risks 61 47 Price Adjustment
12 Contractor’s Risk 62 48 Retention
13 Insurance 62 49 Liquidated damages
14 Site Investigations Reports 62 50 Bonus
15 Queries about the Contract 63 51 Advance Payment
16 Contractors to Construct the works 63 52 Securities
17 The Works to be Completed By the 63 53 Deleted
Intended Completion Date
18 Approval by the Engineer 63 54 Cost of Repair
20 Discoveries 63 E. Finishing the Contract
21 Possession of the Site 64 55 Completion
22 Access to the Site 64 56 Taking Over
23 Instructions 64 57 Final Account
24 Disputes 64 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 65 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 66 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 67 F. Special Conditions of Contract
30 Delays Ordered by The 67 63 Labour
Engineer 64 Compliance with labour regulations
31 Management Meetings 67 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the
Conditions of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities
forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified
by the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of Defects
Liability Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by
the Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data
and calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in replacement
of the Engineer) who is responsible for supervising the Contractor,
administering the Contract, certifying payments due to the Contractor, issuing
and valuing Variations to the Contract, awarding extensions of time, and valuing
the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily
to the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s
Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified
in the Contract Data. The Intended Completion Date may be revised only by the
Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor
for incorporation in the works.
Plant is any integral part of the work which is to have mechanical,
electrical, electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the
Contract and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the
Contractor shall commence execution of the works. It does not necessarily
coincide with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with
the Contractor to carry out a part of the work in the Contract which includes work
Temporary Works are works designed, constructed, installed, and
removed by the Contractor which are needed for construction or installation of
A Variation is an instruction given by the Engineer, which varies the
The Works are what the Contract requires the Contractor to construct,
install, and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural,
male also means female or neuter and the other way around. Heading have
no significance. Words have their normal meaning under the language of
the Contract unless specifically defined. The Engineer will provide
instructions clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references
to the Completion Date and Intended Completion date for the whole
2.3 The documents forming the Contract shall be interpreted in the following
order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated
in the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions
are effective only when in writing. A notice shall be effective only when it
is delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified
in contract data, with the approval of the engineer but may not assign the
Contract without the approval of the Employer in writing. Subcontracting
shall not alter the Contractor’s obligations. Sub-contracting of supply or
specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category
for the part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors,
public authorities, utilities and the Employer between the dates given in
the Schedule of other Contractor. The Contractors shall as refer to in the
Contract Data, also provide facilities and services for them as described in
the Schedule. The employer may modify the schedule of other contractors
and shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of
Key Personnel as referred to in the Contract Data to carry out the functions
stated in the Schedule or other personnel approved by the Engineer. The
Engineer will approve any proposed replacement of key personnel only if
their qualifications, abilities, and relevant experience are substantially
equal to or better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor
shall ensure that the person leaves the Site within seven days and has no
further connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s
risks, and the Contractor carries the risks which these Contracts states are
Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far
as they directly affect the execution of the Works, the risks of war,
hostilities, invasion, act of foreign enemies, rebellion, revolution,
insurrection or military or usurped power, civil war, riot commotion or
disorder (unless restricted to the Contractor’s employees), and
contamination from any nuclear fuel or nuclear waste or radioactive toxic
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury
and death which arise during and in consequence of the performance of
the Contract other than the excepted risks are the responsibility of the
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor
to the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates
required, the Employer may affect the insurance which the Contractor
should have provided and recover the premiums the Employer has paid
from payments otherwise due to the Contractor or, if no payment is due,
the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the
approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date
and shall carry out the Works in accordance with the programme
submitted by the Contractor, as updated with the approval of the Engineer,
and complete them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if they
comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the
temporary or permanent work are subject to prior approval by the
Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on
the Site. The details
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to
notify the engineer of such discoveries and carry out the Engineer’s
instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor.
If possession of a part is not given by the date stated in the Contract Data
the Employer is deemed to have delayed the start of the relevant activities
and this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site
is not handed over to the Contractor, then contractor/ Employer may fore-
close the contract. Contractor/Employer has to foreclose the work within
30 days after lapse of 25%-time limit and after 30 days foreclosure option
will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any
place where materials or plants are being manufactured/ fabricated/
assembled for the works.
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining
to works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to
have them audited by auditors appointed by the Employer, if so required
by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
#Superintending Engineer(Higher Authority)within 14 days of the
notification of the Engineer's decision. If the issue is not resolved, any party
can refer the matter for conciliation within 15 days from the decision given
by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the #Superintending Engineer, both the parties have
to refer to the Chief Engineer concern for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the #Superintending Engineer, both the parties
have to refer to the #Commisioner, Gujarat Housing Board,
Government of Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer
the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal.
If the Contractor fails to refer a claim / dispute to the Higher Authority
within 14 days of the notification of the Engineer's decision, the Contractor
shall not be entitled to any additional payment/claim if he doesn’t follow
the above sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to
the Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along
with monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress achieved
on the timing of the remaining work including any changes to the sequence
of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract
data. If the Contractor does not submit an updated programme within this
period, the Engineer may withhold the amount stated in the Contract data
from the next payment after the date on which the overdue programme
has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible for
completion to be achieved by the Intended Completion Date without the
Contractor taking steps to accelerate the remaining work and which would
cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the
Intended Completion Date within 35 days of the Contractor asking the
Engineer for a decision upon the effect of a compensation event or
Variation and submitting full supporting information. If the Contractor has
failed to give early warning of a delay or has failed to cooperate in dealing
with a delay, the delay by this failure shall not be considered in assessing
the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the
Employer his decision. The employer shall in not more than 21 days
communicate to the engineer the acceptance or otherwise of the Engineer’s
decision. If the employer fails to give his acceptance, the Engineer shall not
grant the extension and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of
any activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of
specific likely future events or circumstances that may adversely affect the
quality of the work, increase the Contract price or delay the execution of
works. The Engineer may require the contractor to provide an estimate of
the expected effect of the future event or circumstance on the contract
price and completion date. The estimate is to be provided by the
Contractor as soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and
considering proposals for how the effect of such an event or circumstance
can be avoided or reduced by anyone involved in the work and in carrying
out any resulting instruction of the Engineer.
C. QUALITY CONTROL
# 33. Identifying Defects/ Defect liability period
33.1 : Defect liability period : The contractor shall be responsible to make good
and remedy at his own expense any defect which may develop or may be
noticed before the period mentioned hereunder from the certified date of
completion. The Engineer in charge shall give the contractor a notice in
writing about the defects and the contractor shall make good the same
within 15 days of receipt of the notice. In the case of failure on the part of
the contractor, the Engineer-in-charge may rectify or remove or re-execute
the work at the risk & cost of the contractor. The Engineer-in-charge shall
be entitled to appropriate the whole or any part of the amount of security
deposit towards the expenses, if any, Incurred by him in rectification,
removal or re-execution. The Defects Liability period shall be as under….
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period
shall be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount
put tender), the period shall be 12 (Twelve) months from the certified date
of completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be
Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be seven years
following date of possession of building taken over by resident association
or the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall
be treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated
Circular No.TNC/10/2016/Clause 17A (Correction/(1)C Dated
33.2 Free maintenance guarantee period for works of Road/Bridge
(a) For resurfacing work of road free maintenance guarantee period one
year from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee
from the certified date of completion. During this period the contractor
shall visit the site every six months along with the concerned Section
Officer / Deputy Executive Engineer and will examine the work already
carried out in this contract like road work, jungle cutting, side
shoulders, side gutter, road furniture, patta etc. and will prepare Km.
wise inspection report duly signed by all concerned and any defect
observed shall be done within 15 days by the contractor at his risk and
cost as per the direction of Engineer in charge. The contractor needs to
do videography of these visits and require to submit at the time of
release of FMG. If B.T. the surface during the maintenance period of
years is worn out then agency shall have to provide renewal coating as
per tender item as directed by the Engineer-in-charge. The amount
equivalent to 5% of each running bill shall be withheld and will be
released after the free maintenance guarantee period (i.e. 4 years) is
However, this amount shall be released against fixed deposit or
bank guarantee pledged in the name of Executive Engineer after
completion certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates
under no circumstances shall exceed the allowable limit set forth in the
relevant clause for the material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment /
cutting for side shoulders, side gutters, kilometer / indicator / guard
stones, sign boards etc. are completed in all respect by the contractor.
After completion of the miscellaneous items, the above said 2%
withheld amount shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd.
(3) Videography for the surface under Maintenance Guarantee is to be
done as per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for
the work costing more than Rs. 5.00 Crore.
(4) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
(5) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his
own risk and cost, the existing lane(s) of the road so that the traffic
worthiness and safety thereof are at no time materially inferior as
compared to their condition 10 (ten) days prior to the date of the
Agreement, and shall undertake the necessary repair and maintenance
works for this purpose; provided that the Contractor may, at his cost,
interrupt and divert the flow of traffic if such interruption and
diversion is necessary for the efficient progress of works and conforms
to Good Industry Practice; provided further that such interruption and
diversion shall be undertaken by the Contractor only with the prior
written approval of the Executive Engineer which approval shall not be
unreasonably withheld. For the avoidance of doubt, it is agreed that the
Contractor shall at all times be responsible for ensuring safe operation
33.3 The Engineer shall check the Contractor’s work and notify the Contractor
of any defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a
Defect and to uncover and test any work that the Engineer considers may
34.1 If the engineer instructs the Contractor to carry out a test not specified in
the Specification to check whether any work has a Defect and the test
shows that it does, the Contractor shall pay for the test and any samples. If
there is no defect the test shall be a Compensation Event.
34.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of
actual charges.
34.3 The contractor shall set up a material testing laboratory at site. The
contractor shall ensure and certify the calibration of the equipment so
installed and shall maintain the same in working order throughout the
period of construction. The contractor shall also provide necessary trained
staff for carrying out such tests for using such equipment. The tests shall
be carried out under the supervision of the Engineer-in-charge. 70% of the
total tests to be done is to be carried out on site laboratory if the facilities
are available as per tender terms and conditions, remaining 10% tests is to
be carried out at govt./ Semi Govt. laboratory and 20% tests is to be carried
out at Govt. recognized laboratory.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the
end of the defects Liability Period, which begins at Completion and is
defined in the contract data. The Defects Liability Period shall be extended
for as long as Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the
notified defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor
is paid for the quantity of the work done at the rate in the Bill of Quantities
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to
the original specifications , drawings, designs and instructions that may
appear to him to be necessary or advisable during the progress of the work
and the contractor shall be bound to carry out the work in accordance with
any instruction in this connection which may be given to him in writing
signed by the Engineer and such alteration shall not invalidate the contract
and any additional work which the contractor may be directed to do in the
manner above specified as part of the work shall be carried out by the
contractor on the same conditions in all respects on which he agreed to do
the main work and at the same rate as are specified in the tender for the
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the
excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no
rate is specified in this contract, then such class of work shall be carried
(i) At the rate derived from the item within the contract which is comparable
to the one involving additional or altered class of work; where there are
more than one comparable items, the item of the contract which is nearest
in comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest
comparable item shall be final and binding on the contractor.
(ii)If the rate cannot be derived in accordance with (i) above, such class of
works shall be carried out at the rate entered in the Schedule of Rates of
the division for the year in which the tender was received, increased or
decreased by the percentage by which the tender amount is more or less
as compared to the amount arrived at the rates in the “Schedule of Rates”
of the Division in the year in which the tender was received. If the Schedule
of rates of the Division does not contain all the items, the percentage
increase or decrease of the tender shall be calculated considering such
items which were included in the “Scheduled Rates” of the division for the
year and for materials consumed on such item the rate to be charged would
be the basic rate taken into account for fixing the rate in S.O.R. referred to
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of
work shall be carried out at the rate decided by the competent authorities
on the basis of detailed rate analysis after hearing the contractor before a
Committee of two Superintending Engineers stationed at the same place or
the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the
“Schedule of Rates” of the Division is ordered to be carried out before the
rate is agreed upon, then the contractor shall within seven days of the date
of receipt by him of the order to carry out the work, inform the Engineer-
in-charge of the rate, which it is his intention to charge for such class of
work and if the Engineer in charge does not agree to this rates, he shall by
notice in writing be at liberty to cancel his order to carry out such class of
work and arrange to carry it out in such manner as he may consider it
advisable, provided always that if the contractor shall commence work or
incur any expenditure in regard thereof before the rates shall have been
determined as lastly herein before mentioned, then in such cases he shall
only be entitled to be paid in respect of the work carried out or expenditure
incurred by him prior to the date of the determination of the rate as
aforesaid according to such rate or rates as shall be fixed by the Engineer-
in-charge. In the event of the dispute, the decision of the Superintending
Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the
designs, drawings and specifications recommended by the contractor and
accepted by the competent authority, the alternation above referred to
shall be within the scope of such designs, drawings and specifications
appended to the tenders.
The time limit for the completion of the work shall be extended in
the proportion that the increase in the cost occasioned by alterations bears
to the cost of the original work and the certificate of the Engineer-in-charge
as to such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount
certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within
days and certify the amount to be paid to the Contractor after taking in to
account any credit or debit for the month in question in respect of
materials for the works in the relevant amounts and under conditions set
forth in sub-clause 32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of
the items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reduce the proportion of any item previously certified in any certificate in
the light of later information
43.1 Payments shall be adjusted for deductions for advance payments,
retention, other recoveries in terms of the contract and taxes at source, as
applicable under the law. The Employer shall pay the Contractor the
amounts certified by the Engineer within 28 days of the date of each
43.2 Payment of GST (prevailing rates) on the amount payable under the
contract to the Contractor will be made by the Employer. Hence, it is the
responsibility of the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not
be paid by the Employer and shall be deemed covered by other rates and
prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will
approve EOT with eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing
on due date of bid submission except GST. However, any subsequent
changes in the tax structure by Government after due date of bid
submission will be compensated (+/-) on availability or submission of
actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the
contractor fails to provide such information and if any financial obligation
may arise due to change in tax structure, same will be recovered from the
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price
of labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion
date or extensions granted by the Engineer and shall not apply to the
work carried out beyond the stipulated time for reasons attributable to
the contractor.
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during
R = Total value of work done during the month. It would include the
amount of secured advance granted, if any, during the month less the
amount of secured advance recovered, if any during the month. It will
exclude value for works executed under variations for which price
adjustment will be worked separately based on the terms mutually
47.2 To the extent that full compensation for any rise or fall in costs to the
contractor is not covered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be deemed
to include amounts to cover the contingency of such other rise or fall in
48.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the
48.2 On Completion of the whole of the Works half the total amount retained is
48.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has
passed and the Engineer has certified that all Defects notified by the
Engineer to the Contractor before the end of this period have been
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer
shall consider the said request of the Contractor provided that the refund
hereunder shall be made in tranches of not less than 1% (One Percent) of
the Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guarantee for an equal amount substantially in the
format of Bank Guarantee for Performance Guarantee enclosed with SBD
and valid up to 60 day beyond the scheduled / extended Defects Liability
Period. On completion of the whole works, the contractor has however an
option to submit a fresh irrevocable and unconditional Bank Guarantee for
an amount equal to 5% of the total value of work executed substantially in
the format of Bank Guarantee for Performance Guarantee enclosed with
SBD and valid up to 60 days beyond the Defect Liability Period and yet
refund the Retention Money Bank Guarantee submitted for refund of
Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate
per day stated in the Contract Data for each day that the Completion Date
is later than the Intended Completion Date (for the whole works or the
milestone as stated in the contract data). The total amount of liquidated
milestone as stated in the contract data). The total amount of liquidated
damages shall not exceed the amount defined in the Contract Data. The
Employer may deduct liquidated damages from payment due to the
Contractor. Payment of liquidated damages does not affect the Contractor’s
49.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated
damages by the Contractor by adjusting the next payment certificate. The
Contractor shall not be entitled for any interest on the over payment
calculated from the date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated
in the tender, then the contractor shall pay to the employer the relevant
sum stated in the Contract Data as Liquidated damages for such default and
not as penalty for everyday or part of day which shall elapse between
relevant time for completion and the date stated in the taking over
certificate of the whole of the works on the relevant section, subject to the
limit stated in the contract data.
The employer may, without prejudice to any other method of
recovery deduct the amount of such damages from any monies due or to
become due to the contractor. The payment or deduction of such damages
shall not relieve the contractor from his obligation to complete the works
on from any other of his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if
applicable any Section, a Taking Over Certificate has been issued for any
part of the Works or of a Section, the liquidated damages for delay in
completion of the remainder of the Works or of that Section shall, for any
period of delay after the date stated in such Taking-Over-Certificate, and in
the absence of alternative provisions in the Contract, be reduced in the
proportion which the value of the part so certified bears to the value of the
whole of the Works or Section, as applicable. The provisions of this Sub-
clause shall only apply to the rate of liquidated damages and shall not affect
the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall
pay to the contractor a sum stated in Contract Data as bonus for every
completed month but subjected to maximum amount as stated in
Contract Data; which shall elapse between the date of completion of all
items of works as stipulated in the contract, including variations ordered
by the Engineer and the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with
time limit of the works is equal or more than 6 months. The bonus would
be paid as under
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the
Contract Date by the date stated in the Contract Date, against provision by
the Contactor of an Unconditional Bank Guarantee in a form and by a bank
acceptable to the Employer in amounts and currencies equal to be at least
110% of the advance payment. The guarantee shall remain effective until
the advance payment has been repaid, but the amount of the guarantee
shall be progressively reduced by the amounts repaid by the Contractor.
The Mobilization advance would be deemed as interest bearing advance at
an interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,
plant and Mobilization expenses required specifically for execution of the
Works. The Contractor shall demonstrate that advance payment has been
used in this way by supplying copies of invoices or other documents to the
51.3 The advance payment shall be repaid by deduction proportionate amount
from payments otherwise due to the Contractor, following the schedule of
completed percentages of the Works on a payment basis. No account shall
be taken of the advance payment or its repayment in assessing valuations
of work done, variations, price adjustments, Compensation Events, or
Liquidated damages.
52.1 The performance Security (including additional security for unbalanced
bids) shall be provided to the Employer no later than the date specified in
the Letter of Acceptance and shall be issued in an amount and form and by
a bank or surety acceptable to the Employer, and denominated in Indian
Rupees. The performance Security shall be valid until a date 60 days from
the date of expiry of Defects Liability Period and the additional security for
unbalanced bids shall be valid until a date 28 days from the date of issue of
the certificate of completion.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of
Completion of the works and the Engineer will do so upon deciding that
the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of
the Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the
total amount that the Contractor considers payable as full and final
total amount that the Contractor considers payable as full and final
settlement of all claims under the Contract for items before the end of the
Defects Liability Period. The Engineer shall issue a Defect Liability
Certificate and certify any final payment that is due to the Contractor
within 56 days of receiving the Contractor's account if it is correct and
complete. If it is not, the Engineer shall issue within 56 days a schedule that
states the scope of the corrections or additions that are necessary. If the
Final Account is still unsatisfactory after it has been resubmitted, the
Engineer shall decide on the amount payable to the Contractor and issue a
payment certificate, within 56 days of receiving the Contractor’s revised
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of
excesses and savings in final account is observed, the Engineer/Employer
shall be at liberty to restrict the final payment of BOQ items to the lowest
amount evaluated of the bids considering the final quantities and the rates
quoted including the rebates if any. Payment of variation items shall
however be made at the rates approved by the Employer, within 90 days
from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the
58.2 If the Contractor does not supply the Drawings and/or manuals by the
dates stated in the Contract data, or they do not receive the Engineer’s
approval, the Engineer shall withhold the amount stated in the Contract
Data from payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other
party causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is
shown on the current programme and the stoppage has not been
authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the
Works and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into
liquidation other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it
within a reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of
days for which the maximum amount of liquidated damages can be paid
as defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in
corrupt or fraudulent practices in competing for or in executing the
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract
execution. “Fraudulent practice” means a misrepresentation of facts in
order to influence a procurement process or the execution of a contract to
the detriment of the borrower, and includes collusive practice among
Bidders (prior to or after bid submission) designed to establish bid prices
at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to
the Engineer for a cause other than those listed under Sub Clause
above, the Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract
by the Contractor, the Engineer shall issue a Certificate for the value of the
work done less advance payments received up to the date of the issue of
the certificate, less other recoveries due in terms of the contract, less taxes
due to deducted at source as per applicable law and less the percentage to
apply to the work not completed as indicated in the Contract data.
Additional Liquidated Damages shall not apply. If the total amount due to
Additional Liquidated Damages shall not apply. If the total amount due to
the Employer exceeds any payment due to the Contractor the difference
shall be a debt payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of
a fundamental breach of Contract by the Employer, the Engineer shall issue
a certificate for the value of the work done, the cost of balance material
brought by the contractor and available at site, the reasonable cost of
removal of equipment, repatriation of the Contractor’s personnel
employed solely on the works, and the Contractor’s cost of protecting and
securing the Works and less advance payment received up to the date of
the certificate, less other recoveries due in terms of the contract and less
taxes due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works
are deemed to be property of the Employer, if the Contract is terminated
because of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor
shall make the Site safe and stop work as quickly as possible after receiving
this certificate and shall be paid for all work carried out before receiving it
and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
63. Submission of drawings/design:
The drawings and document in order of priority and chronological order
as mentioned below should be submitted for approval of the Engineer-in-
Sr. No Description Duration
1 All architectural DBR & working Within 2 weeks from the date
drawings: plans, elevations and section of issuing of work order
of buildings and DUs; Soil investigation
report, Project Schedule, DCIs, QAP &
2 Structure DBR; Sub-structure design Within 2 weeks from the date
and drawings of approval of architectural
working drawings
3 Detail architectural drawings; super- Within 3 weeks from the date
structure design and drawings; MEPF of approval of sub-structure
DBR design drawings
4 MEPF services design and drawings; Within 3 weeks from the date
Ancillary building drawings of approval of MEPF DBR
DBRs, Design calculations and drawings will be submitted by the contractor as per
schedule given above which will be approved from the PMC engaged by GHB. It is
entirely the responsibility of the contractor to get the above designs approved and
finalized within aforesaid period. Any delay on this account will attract
compensation for delay as per clause
Contractor shall submit all necessary material samples for approval within
month of getting approval of detail architecture drawings. Contractor shall
construct a sample DU on ground at an approved location near site entrance as
per approved drawings and material samples within 6 months from getting work
order. This sample DU shall be demolished at the end of project. Nothing extra
shall be payable for construction and demolition of this sample flat.
The contractor shall submit all design calculations, documents, drawings, etc. in
soft copy (native files) for review and approval of PMC. The contractor shall
supply 7 colour copies of approved drawings (minimum 100 gsm paper, minimum
A3 size) within 2 days from the receipt of approval. In addition to above sets of
drawings, contractor shall keep necessary sets of drawings required at site for its
execution as directed by the Engineer-in-charge.
64. Handing over of Flats/Houses:
Three months before the likely date of completion of flats in all respects,
contractor shall intimate to the Engineer-in-charge the following.
a. The contractors/agency shall lay the services as per approved plan by
concern department. On completion of services the contractor /agency will
submit the required number of completion plan to various authorities/
beneficiaries for handing over. The GHB also reserves the right to withhold
the amount which is likely to be payable to these agencies as deficiency
charges. The decision of the Engineer-in-charge in this regard shall be final
and binding on the contractor(s)/agency(s).
b. The contractor shall have to give possession of DUs completed in all
respect to the beneficiaries as and when directed by GHB after completion
of the allotment procedure as per Govt. guidelines.
c. The contractor shall make necessary payment towards minimum
electricity charges to the local authority (i.e. PGVCL ) for each DU till
handing over of the respective DUs to each beneficiary and the same shall
be reimbursed by GHB. The Reimbursement shall be done only for the
minimum electrical charges bill received for DU from the supply company
on submission of actual bill and payment receipt as documentary evidence.
Payment shall be done on monthly basis based on the submission of the bills
received from the supply company and receipt for payment done.
d. Contractor has to prepare and submit the required plans and schedules for
dwellings units for Dastavej as well as shall submit agency plan during
handing over of the projects as per the instructions from Engineer In
e. The final completion shall be considered based on receipt of BU permission
or Lokarpan whichever is Later. BU permission should be un conditional
and no work should be pending including the snag list if any. 1% of handing
over milestone shall not be considered in final bill. After BU permission or
lokarpan whichever is later. GHB / beneficiary shall take over defect free
possession from developer within 6 months. 1% handing over milestone
shall be released after completion of handing over or taking of possession
65. Site Office for GHB & PMC
The contractor shall construct/provide air-conditioned site office at the
project site as per drawing provided by PMC & GHB, with toilet facility &
meeting room with all furniture, including computer, laser colour printer-
A3 Size, (with scanner), projector, internet etc. as per requirement of PMC &
GHB. Nothing extra for this facility shall be payable. Necessary printer toner
and paper to be supplied and all facilities are to be maintained by the
contractor. The contractor shall provide covered car parking for GHB & PMC
as per the requirement of PMC & GHB
The Contractor shall, unless otherwise provided in the Contract,
make his own arrangements for the engagement of all staff and labour,
local or other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the
Engineer may prescribe, showing the staff and the numbers of the several
classes of labour from time to time employed by the Contractor on the site
and such other information as the Engineer may require.
67. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-
contractor shall abide at all times by all existing labour enactments and
rules made thereunder, regulations, notification and bye laws of the State
or central Government or local authority and any other labour law
(including rules), regulations, bye laws that may be passed or notifications
that may be issued under any labour law in future either by the State or the
Central Government or the local authority. Salient features of some of the
major labour laws that are applicable to the construction industry are
given below. The Contractor shall keep the Employer indemnified in case
any action is taken against the Employer by the competent authority on
account of contravention of any of the provisions of any Act or rules made
thereunder, regulations or notifications including amendments. If the
Employer is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for observance of the provisions
stipulated in the notifications/bye laws/Acts/Rules/regulations including
amendments, if any, on the part of the Contractor, the Engineer/employer
shall have the right to deduct any money due to the Contractor including
his amount of performance security. The Employer/Engineer shall also
have the right to recover from the Contractor any sum required or
estimated to be required for making good the loss or damage suffered by
The employees of the Contractor and the Sub-Contractor in no case shall
be treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE
TO ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS
A) Workmen Compensation Act 1923 :- The Act provides for compensation in
case of injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under
the Act on satisfaction of certain conditions on separation if an employee has
completed 5 years service or more on death, the rate of 15 days wages for
every completed year of service. The Act is applicable to all establishments
employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides
for monthly contributions by the employer plus workers @ 10% or 8.33% The
benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for
certain welfare measures to be provided by the Contractor to contract labour
and in case the Contractor fails to provide, the same are required to be
provided, by the Principal Employer by Law. The principal Employer is
required to take Certificate of Registration and the Contractor is required to
take license from the designated Officer. The Act is applicable to the
establishments or Contractor of Principal Employer, if they employ 20 or more
contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than
the Minimum Wages fixed by appropriate Government as per provisions of the
Act, if the employment is a scheduled employment. Construction of Building,
Roads, Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are
to be paid, when it will be paid and what deductions can be made from the
wages of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not
making discrimination against female employees in the matter of transfer,
training and promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual
bonus subject to a minimum of 8.33% of wages and maximum of 20 % of
wages to employees drawing Rs. 3500/- per month or less. The bonus to be
paid to employees getting Rs, 2500/- per month or above Rs. 3500/- per
month shall be worked out by taking wages as Rs. 2500/- per month only. The
Act does not apply to certain establishments. The newly set-up
establishments are exempted for five years in certain circumstances. Some of
the State Governments have reduced the employment size from 20 to 10 for
the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike or
lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced
by some of the State and Central Government to 50). The Act provides for
laying down rules governing the conditions of employment by the Employer
on matters provided in the Act and get the same certified by the designated
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade
unions of workmen and employers. The Trade Unions registered under the
Act have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in
Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment &
Conditions of service) Act 1979:- The Act is applicable to an establishment
which employs 5 or more inter-state migrant workmen through an
intermediary (who has recruited workmen in one state for employment in
the establishment situated in another state).The inter-state migrant
workmen, is an establishment to which this Act becomes applicable, are
required to be provided certain facilities such as housing, medical aid,
traveling expenses from home upto the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of
employment and Conditions of Service) Act 1996 and the Cess Act of
1996:- All the establishments who carry on any building or other
constructions work and employ 10 or more workers are covered under this
All such establishments are required to pay cess at the rate not exceeding 2%
of the cost of construction as may be modified by the government. The
Employer of the establishment is required to provide safety measures at the
Building or construction work and other welfare measures, such as canteens,
First Aid facilities, Ambulance, Housing accommodations for workers near
the workplace etc. The Employer to whom the Act applies has to obtain a
registration certificate from the Registering Officers appointed by the
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable
to premises employing 10 persons or more with aid of power or 20 or more
persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof
from time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental
management plan for best energy use, waste management, the
reduction of pollution as in EMS (Environmental Management
system)ISO-14001-2015
68. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
68.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
#Superintending Engineer (Higher Authority) within 14 days of the
notification of the Engineer's decision. If the issue is not resolved, any party
can refer the matter for conciliation within 15 days from the decision given
by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the #Superintending Engineer, both the parties have to
refer to the #Chief Engineer concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the Superintending Engineer, both parties have to
refer to the #Commisioner , Gujarat Housing Board, Government of
Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract
Dispute Arbitration Tribunal. If the Contractor fails to refer a claim /
dispute to the Higher Authority within 14 days of the notification of the
Engineer's decision, the Contractor shall not be entitled to any
additional payment/claim if he doesn’t follow the above sequence in
stipulated time. However, during such period, he would not stop the
work in any case.
69. The bidder has to carry out maintenance till successfully handover services
to the society of association without any extra cost. The following items to
be procured with warrantee/guarantee for 2 years from the supplier and
bidder shall ensure that any defects or damage occurring under normal
operating conditions (excluding misuse or negligence by the Association)
are rectified or replaced at no additional cost during the warranty period:
Water supply system with tube wells
Pumps for domestic / flushing water supply and fire protection
Solar panel system
Street lights, Common lights (LED lights)
Fire protection system
Elevators / Lifts
Underground Storm water drainage and External Sewerage Network
70. The Bidder shall be responsible to provide connections to nearest
municipal services available including Water Supply, Sewerage, Rainwater
disposal and Electrical connection up to 200 meters from the site
boundary. No additional payment shall be done by the client in this regard.
Clause Reference With
respect To section
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Gujarat Housing Board
Address: 3rd floor, GHB office, new 150 fit ring road, katariya
Name of authorized Representative (will be intimated later)
2. The Engineer is Executive Engineer, Rajkot Division
Name of Authorized Representative: Executive Engineer, Rajkot
3. The Defects Liability Period is seven years from the date of [CL.1.1&33]
completion or handing over of building to resident association
whichever is later.
4. The Start Date shall be 1st days for the date of issue of the Notice to [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is 18 [CL.1.1,17&2]
Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date
Milestone 1 i.e. 12.5 % 1/4th of Time period.
Milestone 2 i.e. 37.5 % 1/2th of Time period.
Milestone 3 i.e. 75% 3/4th of Time period.
Milestone 4 i.e. 100% 100% of Time period.
6. The Site is located at Jetpur, Mahuva, and Bhavnagar. [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of with items as per B.O.Q. The works shall,
inter alia, include the following, as Specified or as directed: [CL.1.1]
Construction of multistoried residential Flats of various category including
Soil investigation, all type of engineering survey, detail planning, Designing,
obtaining approval of all concerned authorities for construction, and all
constructing activities like excavation, construction of all types of structure,
finishing works like plastering, painting, flooring etc, doors, window, grills,
window safety grill and all internal & external amenities, electrification, water
supply, drainage, storm water drain, roof top solar panel system, c.c. roads,
path, water proofing treatment, anti-termite treatment, lift-elevators,
compound wall, gate with security cabin, firefighting system, lightening
arrester, landscaping, rainwater harvesting, anganwadi, society office and any
other requirement as mentioned in tender with all material and labour etc. as
per minimum required specifications stated in tender documents and Design
approved by PMC appointed by GHB, including all taxes except GST charges,,
royalties, RERA submission and compliances, obtaining final BU Permission
from local authority and comprehensive operation & maintenance etc.
complete including preparing and submitting all final record plans, as built
plan as mentioned in the scope of work of the tender document on GHB open
Land at Jetpur, Mahuva, Bhavnagar city in Gujarat State.
Site clearance; setting – out and layout; widening of existing carriageway
and strengthening including camber corrections; construction of new
road/ Parallel service road; bituminous pavements
remodeling/construction of Junctions, intersections, bus bays, lay-bays;
supplying and placing of drainage Channels, flumes, guard posts and
guard other related items; construction/extension of cross drainage
works, bridge, approaches and other related stones; protective works for
roads/bridge; all aspects of quality assurance of various components of
the works; rectification of The defects in the completed works during the
Defects Liability Period; submission of “As- built’’ drawings and any
other related documents; and other item of work as may be required to
be carried out for completing the work in accordance with the drawings
and the provisions of the contract and to ensure safety.
(B) Bridge Works
Site clearance; setting out, provision of foundations, piers abutments and
bearing; prestressed/reinforced cement concrete superstructure;
wearing coat, hand railings, expansion joints, approach slabs, drainages
spouts/ downtake pipes, arrangements for fixing light posts, water
mains, utilities etc; provision of suitably designed protective works;
providing wing/return walls; provision of road markings, road signs etc.;
all aspects of quality assurance; clearing the site and handing over the
works on completion; rectification of the defects during the Defects
Liability Period and submission of “As-built” drawings and other related
documents; and other items of work as may be required to be carried out
for completing the works in accordance with the drawings and the
provisions of the contract and to Insure safety
(C) Other Items [CL.1.1]
Any Other Items as required to fulfill all contractual obligations as per the Bid
10. The following documents also form part of the Contract: [CL.2.3(9)]
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death [CL13]
is Rs. 5 lakhs per occurrence with the number of occurrences limited to
four. After each occurrence, the contractor will pay an additional
premium necessary to make insurance valid for four occurrences
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be …………………….. [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 60 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs. 1 lakhs
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the course
of execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring
additional mobilization by the contractor, e.g. ordinary soil
to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps,
etc. not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or
military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such
that the gross % weight of the components shall remain as 100% .
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to
labour shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for local
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of opening
of technical Bids as published by Labour Bureau, Ministry
of Labour, Government of India
Li = The consumer price index for industrial workers for the
State for the month under consideration as published by
the Labour Bureau, Ministry of Labour, Government of
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of
cement procured by the contractor
Vc = Increase or decrease in the cost of work during the
month under consideration due to changes in rates
C0 = The all India wholesale price index for Ordinary
Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as
published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Ci = The all India average wholesale price index for Ordinary
Portland Cement for the month under consideration as
published by Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry
of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars) on 28 days preceding the date of opening of Bids as published by the
Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long
Products Rebars) for the month under consideration as published by
Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the
nearest centre on the day 28 days prior to the scheduled date of
opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest
centre for the 15th day of the month under consideration.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for fuel and
Fo = The official retail price of High Speed Diesel (HSD) at the
existing consumer pumps of IOC at the nearest centre on the day
prior to the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps
of IOC at the nearest centre for the 15th day of the month of the
under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil
has been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in
accordance with the following formula
Vp= Increase or decrease in the cost of work during the month
under consideration due to changes in rates for plant and
machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the
month under consideration as published Office of the Economic
Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer
of machinery for mining, quarrying and Construction for the
month under consideration as published Office of the Economic
Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and
parts has been chosen to represent the Plant and Machinery
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials
other than cement, steel, bitumen and POL procured by the
contractor shall be paid in accordance with the following formula
Vm = Increase or decrease in the cost of work during the month
under consideration due to change in rates for local materials other
than cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on
days preceding the scheduled date of opening of technical Bids, as
published by the Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the
month under consideration as published by the Office of the
Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than
cement, steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment for the
entire contract:
1. Labour -Pl 36.76%
2. Cement – Pc 6.59%
3. Steel - Ps 16.53%
4. Bitumen - Pb 0%
6. Plant & Machinery Spares Pp 9.19%
7. Other Materials - Pm 29.42%
25. The proportion of payments retained (retention money) shall be 6% {CL.
48} from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work {CL.49}
delay in completion of works (1/2000)th of the Initial
contract price, rounded off to
the nearest Thousand, per day.
For sectional Completion
(wherever specified In item
of Contract data) (1/2000)th of
initial contract price per
housing block, rounded off to
the nearest thousand per day.
27. Maximum limit of liquidated damages 10 percent of the Initial {CL.49}
For delay in completion work Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given
as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract{CL. 50}
Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
#Nature of Advances Amount (Rs.) Conditions to
i Mobilization 10% of the contract On submission of
Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The
contractor may furnish four
bank guarantees of 2.5 % of
each valid for the full period.
ii Equipment 90% for new and 50% of After equipment is brought to
depreciated value for old site (provided the Engineer is
equipment. Total satisfied That the equipment is
amount will be subject to required for performance of the
a maximum of 5% of the contract) and on submission of
Contract Price unconditional Bank Guarantee
for amount of advance
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after
fulfillment of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL.
The advance loan shall be repaid with percentage deduction from the interim
payments certified by the Engineer under the Contract. Deduction shall
commence in the next Interim Payment Certificate following that in which the
total of all such payments to the Contractor has reached not less than
percent of the Contract Price or 6 (six) months from the date of payment of
first installment of advance, whichever period concludes earlier, and shall be
made at the rate of 20 percent (collectively for both Mobilization Advance
and Equipment Advance) of the amounts of all Interim Payment Certificate
until such time as the loan has been repaid, always provided that the loan shall
be completely repaid prior to the expiry of the original time for completion
pursuant to Clause 17 and
33. The securities shall be for the following minimum amounts equivalent {CL.
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be
decided after evaluation of the bid) as additional security in terms of ITB
The standard form of Performance security acceptable to the Employer shall
be an unconditional Bank Guarantee of the type as presented in Section 8 of
the Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL.
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL.
58} are required within 28 days of the issue of certificate of completion of the
whole or section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58}
by the Date required is Rs. Lakhs.(As per Payment Stages)
37. The following events shall also be fundamentals breach of contract:
{CL.59.2} “The Contractor has contravened Sub- clause 7.1 and Clause 9 of
38. The percentage to apply the value of the work not completed representing {Cl
60} the Employer’s additional cost for completing the Works shall be 20 per
TECHNICAL SPECIFICATION
1. In the specifications "as directed" / "approved" shall be taken to mean "as directed" /
"approved by the Engineer-in-Charge".
2. Wherever a reference to any Indian Standard appears in the specifications, it shall be
taken to mean as a reference to the latest edition of the same in force on the date of
3. In "Mode of Measurement" in the specifications wherever a dispute arises in the
absence of specific mention of a particular point of aspect the provisions on these
particular points, or aspects in the relevant Indian Standards shall be referred.
4. All measurements and computations, unless otherwise specified, shall be carried out
nearest to the following limits:
a) Length, width and depth (height) 0.01 meter
b) Areas 0.01 Sq. Mt.
c) Cubic Contents 0.01 Cu. Mt.
In recording dimensions of work the sequence of length, width and height (depth) or
thickness shall be followed.
5. The distance which constitutes lead shall be determined along the shortest practical
route and not necessarily the route actually taken, the decision of the Engineer-in-
charge in this regard shall be taken as final.
6. Where no lead is specific, it shall mean "all leads"
7. Lift shall be measured from plinth level.
8. Up to "floor two levels" means actual height of floor (Max.4 M) up to 3 Mt. above
9. Definite particulars covered in the items of work, though not mentioned or elucidated
in it specifications shall be deemed to be included therein.
10. Reference to specifications of materials as made in the detailed specification of the
items of works is in the form of a designation containing them kuber of the
specification of the material and prefix 'M’ e.g. 'M-5',
11. Approval to the samples of various materials given by the Engineer-in-charge shall
not absolve the contractor from the responsibility of replacing defective material
brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on
account of any such materials being rejected by the Engineer-in-charge.
12. The contract rate shall be for the work completed in all aspects.
13. No collection of materials shall be made before it is got approved from the
Engineer-in-charge.
14. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stored in such a manner as to prevent damage, deterioration or
intrusion of foreign matter and to ensure the preservation of their quality and fitness
15. Materials, if and when rejected by the Engineer-in-charge, shall be immediately
removed from the site of work.
16. No materials shall be stored prior to, during and after execution of a structure in such
a way as to cause or lead to damage or overloading of the various components of the
17. All works shall be carried out in a workman like manner as per the best techniques for
the particular item.
18. All tools, templates, machinery and equipment for correct execution of the work as
well as for checking lines, levels, alignment of the works during execution shall kept in
sufficient numbers and in good working condition on the site of the work.
19. The mode, procedure and manner of execution shall be such that it does not cause
damage or over-loading of the various components of the structure during execution
or after completion of the structure.
20. Special modes of construction not adopted in general Engineering practice if proposed
to be adopted by the Contractor, shall be considered only if the contractor provides
satisfactory evidence that such special mode of construction is safe, sound and helps
in speedy construction and Completion of work to the required strength andquality.
Acceptance of the same by the Engineer-in-Charge shall not, however absolve the
contractor of the responsibility of any adverse effects and consequences of adopting
thk same in the course of execution of completion of the work.
21. All installations pertaining to water supply and fixtures there of as well as drainage
lines and sanitary fittings shall be deemed to be completed only after giving
satisfactory tests by the contractor.
22. The contractor shall be responsible for observing the rules and regulations imposed
under the "Minor Minerals Act", and such of the laws and rules prescribed by
Government form to time.
23. All necessary safety measures and precautions (including those laid down in the
various relevant Indian Standards) shall be taken to ensure the safety of men. Materials
and machinery on the works as also of the work itself.
24.The testing charges of all materials shall be borne by the Contractor.
25. Approval to any of the executed items for the work does not in any relieve the
contractor of his responsibility for the correctness, soundness and strength of the
structure as per the drawings and specifications.
26. This is a turnkey contract. While efforts have been made to cover the scope of thework
as defined under specifications and narration etc. but there may be some ambiguities
or missing items but the contractor shall be responsible for executing all the items
required for completion of house in all respects to make them habitable and ready for
occupation and to make services functional and operations including external and
internal services.
27. Progress Monitoring: Contractor shall submit monthly progress report indicating
financial & physical progress of the work as well as design, quality and safety progress
reports till the works are completed. The work will be executed as per CPM/PERT
chart to be submitted by contractor duly signed along with tender. The contractor will
be responsible for completion of job as per CPM/PERT Milestone chart.
BUILDING WORKS & ROAD WORKS SPECIFICATIONS
All the specifications to be followed for execution of work shall be as per the general
technical specifications of R & B Department for building works, road works/ GWSSB,
Govt. of Gujarat Relevant, IS Specification shall be followed for construction of buildings.
In case, IS Specifications are not available, the decision of the GHB shall be final. The
ambiguity in regards to interpretation of specification(s), the decision of the GHB shall be
final and binding. Wherever, any reference to any Indian Standard specification occurs in
the documents relating to this contract the same shall be inclusive of all amendments
issued thereto or revisions thereof, if any, up to the date of receipt of tenders. Samples of
building materials, door and window fitting, sanitary ware and other articles required for
completion of work shall be got approved from Engineer-in-charge before their use in the
work. Preference shall be given to those articles which bears IS certification mark. In case
articles bearing IS certificatirr mark are not available, the quality of the sample brought
by contractor shall be judged by the standard laid down in the relevant IS specification, All
materials and articles brought by the contractor(s) to the site for use shall confirm to
sample approved which shall be preserved till the completion of work.
ELECTRICAL & MECHANICAL WORKS SPECIFICATIONS
All the specifications to be followed for execution of work shall be as per the specifications
of R & B Department, Govt. of Gujarat & DGVCL/Torrent and NBC guidelines.
INFRASTRUCTURE SPECIFICATIONS
All the specifications to be followed for execution of work shall be as per the specifications
of GWS & SB (for water supply, sewerage, drainage, storm water drainage, rain water
harvesting and grey water treatment plant) and Ministry of Surface Transport, Govt. of
Gujarat (for development of roads) and general technical specifications of R & B
Department/ GWSSB, Govt. of Gujarat.
HORTICULTURE SPECIFICATIONS
All the specifications shall be as per relevant GDCR of DIRECTORATE of HORTICULTURE.
Relevant IS Specification shall be followed for construction of buildings. In case, IS
Specifications are also not available, the decision of the Executive Engineer shall be final.
FIRE PROTECTION SYSTEM SPECIFICATIONS
1.0 Fire Extinguisher: The scope of work under this part of the specification covers
supply and installation of internal appliances as per requirements specified in
schedule & marked on drawings and instructions of engineer-in-charge.
Makes of all the appliances supplied and installed shall be as per the ‘List of
Approved Make’ or as approved by LFA and shall be of identical design for the
entire premises. Mounting accessories, indicator boards etc. are part of the scope
of supply of internal appliances.
1.1 Specifications:
Internal appliances with various fire extinguishing medium shall conform to the
following specifications and shall be installed and maintained as per IS: 2190 /
Portable Extinguishers of the following types shall be installed according to local
CFO requirement.
1.1.1 CO2 Type: The CO2 Extinguisher shall be ISI mark, with initial charge with high
pressure cylinder, complete with wheel type valve, internal discharge tube, with
high pressure discharge hose with horn and suspension brackets. The
extinguisher shall have ISI mark of 2878 or latest Indian standard and capacity
shall be 2 Kgs.
1.1.2 ABC (Powder) Type : 6 Kg ABC (Powder) type fire extinguisher shall conform to
IS 15683 or latest Indian Standard & will be with all accessories & mounting
2.0 Pipe Work :
2.0.1 All the materials shall be of TAC/LFA approved, best quality conforming to the
specifications and subject to the approval of the Client or his representative. If so
directed, materials shall be tested in an approved testing laboratory & the
contractor shall produce the test certificate in original to the Engineer-in-charge
& the entire charges for original as well as repeated tests shall be borne by the
2.0.2 Before welding, the pipe faces shall be cleared & then shall be welded conformig
to IS : 9595 – 1980. The electrodes used for welding shall comply with IS:814. the
laying of welded pipe shall also comply to IS 5822 – 1986. The welding joints shall
be tested in accordance to IS:3600, Part
2.0.3 Pipes and fittings shall be fixed truly vertical, horizontal or in slopes as required in
a neat workman like manner.
2.0.4 Pipes shall be fixed in a manner as to provide easy accessibility for repair and
maintenance and shall not cause obstruction in shafts, passages etc.
2.0.5 Pipes shall be securely fixed to walls, and ceilings by suitable clamps or supported
at every 3 mtr. & at change of direction as required. Only approved type of anchor
fastners shall be used for RCC ceiling and walls.
2.0.6 Valve and other appurtenances shall be so located that they are easily accessible
for operations, repairs and maintenance.
2.1 Pipes : Pipes of the following types are to be used:
2.1.1 MS/ G.I. pipes as per IS: 1239, heavy duty (for pipes of sizes 150 mm N.B. and
below) suitably lagged on the outside to prevent soil corrosion. M.S. pipes buried
below ground shall be lagged as per IS:
2.1.2 MS/GI pipe lines upto 150 mm dia. shall have all fittings as per IS: 1239, Part-II
(heavy grade) while pipelines above 150 mm dia shall be fabricated from IS:
Gr.320 pipes as applicable or from steel plates.
2.1.3 For MS/GI pipelines upto 50 mm dia screwed jointing shall be adopted, while for
pipelines above 50 mm dia welded or flanged construction is to be carried out or
as specified in Schedule of quantities.
2.1.4 Hangers and supports shall be capable of carrying the sum of all concurrently
acting loads. They shall be designed to provide the required supporting effects and
allow pipeline movements as necessary. All guides, anchor, braces, dampener,
expansion joint and structural steel to be attached to the building structure
trenches etc. shall be provided. Hangers and components for all piping shall be
approved by the Consultant / Client / Architect.
2.1.5 The piping system shall be capable of withstanding 150% of the working pressure
including water hammer effects.
2.1.6 Flanged joints shall be used for connections to vessels, equipment, flanged valves
and also on suitable straight lengths of pipeline of strategic points (@ at every 15-
20 mtr.) to facilitate erection and subsequent maintenance work.
2.1.7 Excavation for pipe line shall be in open trenches. Pipes shall be buried atleast one
meter below ground level and shall have 230 mm x 230 mm masonry supports
atleast 300mm high at 3m intervals. Masonry work to have plain cement concrete
foundation (1 cement: 4 coare sand: 8 stone aggregate) of size 380 x 380 x 75 thick
resting on firm soil.
2.1.8 Wherever required Contractor shall support all trenches or adjoining structures
with adequate supports to prevent landslides.
2.1.9 On completion of testing and painting trenches shall be refilled with excavated
earth in 15 cm layers and compacted.
2.1.10 Contractor shall dispose off all surplus earth within the site.
2.1.11 Contractor shall provide suitable cement concrete anchor blocks for overcoming
pressure trusts in underground / external pipes. Anchor blocks shall be of cement
concrete 1:2:4 mix.
3.1 Valves shall be used to start, stop or control flow. Non-return valves shall be
provided unidirectional flow.
3.2 Butterfly valve conforming to BS 5155 or as indicated in BOQ will be used for
isolation of flow in pipelines. Optionally, gate valves having outside screw rising
spindle shall be used and shall be as per IS: 780 / 14846 PN 1.0/1.6, as applicable.
For sizes 50mm to 200mm, Butterfly valve shall be as per IS: PN = 1.6 or as
specified in Schedule of quantities. Non-return valves shall be swing check/spring
operated type. An arrow mark in the direction of flow shall be marked on the body
of the valve. Thesecvalves shall conform to IS:5312 for swing type or API 596/598
for spring type check valvesc3.3 Valves below 50 mm size shall have screwed
ends while those of 50 mm and higher sizes shall have flanged connections. Drain
lines will have locks for draining.
4.0 Internal Hydrant:
Internal hydrant shall be provided at each landing or at suitable location
consisting of single / twin headed gunmetal landing valve as indicated in BOQ
with 63 mm dia oblique female instantaneous pattern with caps & chains. Outlet
and 80 mm inlet (IS: 5290-1969) with separate shut off valve. Landing valves
shall be 63 mm dia. Oblique female instantaneous pattern with caps and chains.
Landing valves shall be of gunmetal and fitted with instantaneous coupling
conforming to IS: 901. The valve body, stop valve, check valve, nut, instantaneous
female outlet and blank cap shall be of leaded-tin bronze conforming to Grade-II
of IS: 318-1962. The valve spindle shall be of brass rod conforming IS: 320 -
The hand wheel shall be mild steel or cast iron washers gaskets shall be of rubber
conforming to IS:638 - 1965 or leather conforming to IS: 581 : 1969. The coupling
shall be fitted with an internal plug secured by chain landing valves shall be
installed on hydrant riser at a height of 1.0 to 1.2 meter from th0 floor level.00
Each internal hydrant shall be provided with two nos. 63 mm. Diameter
mtr. Long hose pipe with gunmetal male and female instantaneous type coupling,
machined wound with G.I. wire hose of IS 636 type A and couplings to IS:903 with
IS certification, gunmetal branch pipe with nozzle conforming to IS:903.
Hoses pipes shall be of fabric reinforced rubber lines as per IS:636 Type II or
canvas hose as per IS:4927, with nominal size of 63 mm and lengths of 15 meter
or 7.5 meter, as per quantities specified for in schedule or bill of quantity.
All hose pipes shall carry ISI marking on the body of the hose.
The hose shall have instantaneous spring lock-type coupling on ends. The
instantaneous coupling shall be as per IS: 901. It shall be fixed to each other by
copper rivets and galvanized M.S. wires and leather bands. All coupling shall be
interchangeable with each other and shall bear ISI markings.
6.0 Hose Cabinets (Hose Box)
Each hydrant shall be housed in a Hose cabinet of suitable size. The hydrant
cabinet shall hold double / single headed hydrant as specified, 2 hoses and one
branch pipe as required. Internal hydrants shall normally fit the size of the niche
made for it. The cabinet shall be of minimum 16 SWG M.S. sheet with centre
opening, double glass front doors (cleat glass of 4mm thickness). The glass shall
be firmly fixed by means of steel clips and screw with rubber beading. Hinges shall
also be screwed and not weld d. The corner members (frame) shall be of 25 x
x 3 mm thick angle. The hose box shall be firmly fixed to the wall/support by
means of brackets and dash fasteners. The steel work shall have one coat of
primer and two coats of red paint. The words “Yard Hydrant”, “Hydrant” etc.
should be painted in white or red on the glass in 75 mm high letters. The hose box
shall be lockable for internal hydrant installation.
Hose Reel The hose reel shall be directly tapped from the riser through a 25 /
32 mm dia pipe, the drum and the reel being firmly held against the wall by use of
dash fasteners. The hose reel shall be swinging type (180degrees) and the entire
drum, reel etc. shall be as per IS: 3876 and IS: 884. The rubber tubing shall be of
best quality and the nozzle shall be shut off type.
7.0 Branch Pipes
Branch pipe shall be of either gun metal or aluminium and should conform to IS:
903. One end of the branch pipe will receive the coupling while the other end shall
have a nozzle screwed to it. It shall bear ISI marking.
9.0 Yard / External Hydrant
Yard or External Hydrants shall be as per IS: 908 and the valve as per IS:5290. The
hydrant shall consist of stand post assembly and a masonry base 200 mm X
mm X 200 cm high and shall be made at the point where it comes out of the soil.
The valve shall complete with hand wheel, quick coupling connection spring and
blank cap. The hydrant shall be laid on 150 dia. or as mentioned in BOQ.
Yard or External hydrant shall be controlled by a cast iron sluice valve. Hydrant
shall have oblique female instantaneous pattern 63 mm diameter outlets with
caps and chains. The hydrant shall be of gunmetal and flange inlet and single
outlet conforming to IS: 5290, a duck foot bends and flanged riser of required
height to bring the hydrant to level above ground. The valve body, stop valve,
check valve, nut, instantaneous female outlet and blank cap shall be of leaded-tin
bronze conforming to Grade-II of S:318-1962. The valve spindle shall be of brass
rod conforming IS:320 - 1962. The hand wheel shall be mild steel or cast iron
washers gaskets shall be of rubber conforming to IS:638 - 1965 or leather
conforming to IS: 581 : 1969. Each external hydrant shall be provided with two
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
F PMAY 2 Tender_18_12_2025 SBD Book_Final_Rajkot.pdf
Jetpur_Survey for Tender.pdf
Mahuva_Survey for tender.pdf
R 9.pdf
R 31.pdf
R-10C PMAY2.pdf
Shastrinagar_Survey for tender.pdf
Unit Plan_page-0001.pdf
annexure.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .