Loading…
Loading…
| Sl No | Description | Qty | Unit | VISHNU K L2 | PRABEESH L1 |
|---|---|---|---|---|---|
| 1.00Compound wall and yard tile | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 4.3 | cum | 395.69 ₹1,701.47 | 359.72 ₹1,546.8 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.91 | cum | 8,726.18 ₹7,940.82 | 7,932.89 ₹7,218.93 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.82 | cum | 10,960.32 ₹19,947.78 | 9,963.93 ₹18,134.35 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.48 | sqm | 424.78 ₹2,327.79 | 386.16 ₹2,116.16 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 39.75 | sqm | 1,109.41 ₹44,099.05 | 1,008.55 ₹40,089.86 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.88 | cum | 14,049.4 ₹68,490.83 | 12,772.18 ₹62,264.38 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 463.19 | kilogram | 123.67 ₹57,282.71 | 112.43 ₹52,076.45 Lowest |
| 1.01 | OD527985/2024-2025:Providing and laying 60mm thick factory made cement concrete interlocking paver block of
M30 grade made by block making machine with strong vibratory compaction, of approved
size,design and shape laid in required colour and pattern over and including 50 mm thick
compacted bed of coarse aggregate,filling the joints with fine sand etc.all complete as per the
direction of engineer in charge | 9.5 | sqm | 1,101.39 ₹10,463.21 | 1,001.26 ₹9,511.97 Lowest |
Tender Value
₹1.9 L
EMD Value
₹4,824
Closing Date
8 Aug 2025, 5:00 pmClosed
LINDA C K
LIDEW CHALISSERY
Annual Plan-2024-25 PROJECT NO.222 COMPOUND WALL AND FRONT YARD TILE WORK FOR ANGANAWADI NO.87 IN CHALISSERI GP-PROJECT NO.22225
2025_LSGD_780652_1
02/2025/AE/LIDEW/CHY PHASE4
Open Tender
Civil Works - Buildings
Item Rate
LID EW CHALISSERY
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,824
Yes
4 Nov 2025
31 Jul 2025
11 Aug 2025
31 Jul 2025
8 Aug 2025
31 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1279533.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .