Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC NORTH BADHARGHAT TRIPURA W PIN 799003 | WEST TRIPURA | TRIPURA | 799003 | ₹7.6 L | L1 | Accepted-AOC STOOD L1 |
| 2 | L2₹8.1 L+₹55,661.31 (7.34%)Rejected-Finance DHALESWAR AGARTALA WEST TRIPURA PIN 799007 | AGARTALA | WEST TRIPURA | TRIPURA | 799007 | ₹8.1 L+₹55,661.31 (7.34%) | L2 | Rejected-Finance HIGHER THAN L1 |
| 3 | L3₹9.2 L+₹1.6 L (20.9%)Rejected-Finance | ₹9.2 L+₹1.6 L (20.9%) | L3 | Rejected-Finance HIGHER THAN L1 |
| 4 | L4₹9.5 L+₹1.9 L (25.1%)Rejected-Finance | ₹9.5 L+₹1.9 L (25.1%) | L4 | Rejected-Finance HIGHER THAN L1 |
| 5 | L5₹9.6 L+₹2.0 L (26.2%)Rejected-Finance AGARTALA TRIPURA W PIN 799008 | WEST TRIPURA | TRIPURA | 799008 | ₹9.6 L+₹2.0 L (26.2%) | L5 | Rejected-Finance HIGHER THAN L1 |
Tender Value
₹12.4 L
EMD Value
₹24,849
Closing Date
30 Apr 2026, 2:00 pmClosed
The Executive Engineer Agri West Agartala
The Executive Engineer West-I Department of Agriculture and F W Agartala Tripura
Establishment of Centre of Excellence for flower at Lembucherra SH const of surface drain. (2nd Call)
2026_AGRI_72146_1
53/AGRI/EE(WEST)/2025-26 (2nd Call)
Open Tender
Civil Works
Percentage
45 days
LEMBUCHERRA
AS PER DNIT
7 documents required · 7 mandatory
₹1,000
₹24,849
14 Jul 2026
23 Apr 2026
30 Apr 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | - | Cum | - | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | - | - |
| 3 | 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | cum | - | - |
| 4 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:- In cement mortar 1:4 ( 1cement : 4 fine sand ). | - | Sqm | - | - |
| 5 | Providing and laying cement concrete 1:2:4 (1 cement: 2 fine sand : 4 graded well burnt brick aggregate) flooring finished with a floating coat of neat cement including cement slurry, rounding of edges and strips and cost of glass strips etc. all complete as per direction of Engineer-in-charge. 10.6.1 40mm thick. | - | Sqm | - | - |
| 6 | 12 mm cement plaster of mix 12.1.2 Cement mortar 1:4 (1 cement : 4 fine sand) | - | Sqm | - | - |
| 7 | Neat cement punning. | - | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_73424.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
DNIT53.pdf
Tender Documents • 2.97 MB
BOQ_73424.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .