| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | ₹3.1 L | L1 | Accepted-AOC Work awarded and Agreement Executed |
| 2 | L2₹3.2 LRejected-AOC | ₹3.2 L | L2 | Rejected-AOC Work awarded and Agreement Executed |
| Sl No | Description | Qty | Unit | ISMAIL T L1 | V N RAJENDRA KUMAR L2 |
|---|---|---|---|---|---|
| 1.00Desilting well | |||||
| 1.00 | 100.54.4.7:Desilting open wells of dia above 6.0m and up to 9.0m and depth up to 13.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 42.39 | cum | 2,105.85 ₹89,266.98 | 2,208 ₹93,597.12 |
| 1.00 | 100.54.4.8:Desilting open wells of dia above 6.0m and up to 9.0m and depth up to 15.0m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete. | 42.39 | cum | 2,265.43 ₹96,031.58 | 2,375 ₹1.0 L |
| 1.00 | OD186836/2025-2026:Construction of temporary bund using earth filled cement bags including cutting of the earth, filling, conveying and placing in position, , Placing of polyethene sheets on the bund, placing bamboos poles at regular intervals, dismantling the sand/ earth filled cement bag from the foundation site of bund apron on both side, removing the sand/ earth from the bag and disposing the damaged cement bags properly as per the direction of the department officers including all cost and labour chargers and hire for tools and plants etc., complete. | 15 | metre | 6,175.2 ₹92,628 | 6,475 ₹97,125 |
| 2.00Leading channel cleaning | |||||
| 2.00 | OD186837/2025-2026:Cleaning leading channel including bailing out and all cost and conveyance of material, including labour charges, hire for tools etc.. complete | 45 | cum | 651.49 ₹29,317.05 | 683 ₹30,735 |
Tender Value
₹3.5 L
EMD Value
₹9,000
Closing Date
30 Jan 2026, 3:00 pmClosed
Executive Engineer
PH Division Sulthan Bathery
O M Water Supply Schemes DRW 2026 ARWSS to Kaniyambetta Desilting well, leading channel and infiltration gallery at RWPS Neerattadi-General Civil Work
2026_KWA_828511_1
WRD/KWA-CE(NR)/TR34/26882/2025
Open Tender
Civil Works - Water Works
Neerittady
Please refer Tender documents.
7 documents required · 7 mandatory
₹950
₹9,000
3 Jun 2026
17 Jan 2026
31 Jan 2026
17 Jan 2026
30 Jan 2026
17 Jan 2026
Desilting well
100.54.4.7:Desilting open wells of dia above 6.0m and up to 9.0m and depth up to 13.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete.
100.54.4.8:Desilting open wells of dia above 6.0m and up to 9.0m and depth up to 15.0m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete.
OD186836/2025-2026:Construction of temporary bund using earth filled cement bags including cutting of the earth, filling, conveying and placing in position, , Placing of polyethene sheets on the bund, placing bamboos poles at regular intervals, dismantling the sand/ earth filled cement bag from the foundation site of bund apron on both side, removing the sand/ earth from the bag and disposing the damaged cement bags properly as per the direction of the department officers including all cost and labour chargers and hire for tools and plants etc., complete.
Leading channel cleaning
OD186837/2025-2026:Cleaning leading channel including bailing out and all cost and conveyance of material, including labour charges, hire for tools etc.. complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1390866.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1390866.xls
BOQ • 0.30 MB
BIDDOC.pdf
Tender Documents • 0.78 MB
Affidavit.pdf
Other Document • 0.47 MB
Integritypact.pdf
Other Document • 0.05 MB
Download all tender documents and submit your bid