Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
14 Jul 2025, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
MID Baramulla
Rewinding of 3-Phase 60 HP Horizontal Motor at Lift Irrigation Scheme Achabal 2nd of MISD Sopore.
2025_IFC_280315_5
eNIT 14 of 2025-26 MISD Sopore
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
21 Jul 2025
2 Jul 2025
15 Jul 2025
2 Jul 2025
14 Jul 2025
2 Jul 2025
Amount
Disconnecting of all motor leads, dismantling of motor, taking out the rotor from the stator, and complete disassembly as per requirement of job.
Mechanical transportation, loading, unloading and handling of pump using appropriate means of transport like Minivan upto a lead of 18 Km per trip.
Complete rewinding of 60hp horizontal motor by standard specific gauge of copper wire required for 60 hp motor. The job includes complete insulating paper, tapings, required sticks, etc.
Assembling of all motor parts, coupling and alignment with pump, reconnecting of leads and testing on full load.
Deduct cost of old scrap extracted from the equipment. (80% or as per actual).
City Engineering Works (BID ID -2399790)
Asif Engineering Works (BID ID -2400746)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .