Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹72.3 L
EMD Value
₹1.8 L
Closing Date
10 Aug 2026, 11:30 amClosed
AGM MM CGMT
CGMT CG CIRCLE RAIPUR
Installation Dismantling and Recovery of Battery and Power Plant in Bilaspur BA under Chhattisgarh Circle
2026_BSNL_284721_1
Installation Dismantling and Recovery of Battery and Power Plant in Bilaspur BA under CG Circle
Open Tender
Miscellaneous Works
Works
365 days
BILASPUR
please refer tender document
4 documents required · 4 mandatory
₹1,770
Yes
A O (A and B) BSNL CG CIRCLE
₹1.8 L
Yes
11 Aug 2026
20 Jul 2026
11 Aug 2026
20 Jul 2026
10 Aug 2026
20 Jul 2026
20 Jul 2026 - 27 Jul 2026
Financial Bid For Zone-1 (Bilaspur OA)
S.No. Work Unit Qty Rate Quoted by Bidder
In Figure In Words Total (In Rs)= Qty x Rate
1 Installation of 100/200/300 AH Li-ion battery with transportation and A.T. per set 2
2 Installation of 100/200/300 AH VRLA battery with transportation and A.T. per set 2
3 Installation of 100/200/300 AH Li-ion battery with A.T. per set 2
4 Installation of 100/200/300 AH VRLA battery with A.T. per set 2
5 Installation of 400/500 AH Li-ion battery with transportation and A.T. per set 60
6 Installation of 400/500 AH VRLA battery with transportation and A.T. per set 53
7 Installation of 400/500AH Li-ion battery with A.T. per set 59
8 Installation of 400/500AH VRLA battery with A.T. per set 7
9 Installation of 600/700/800/900 AH Li-ion battery with transportation and AT per set 5
10 Installation of 600/700/800/900 AH VRLAbattery with transportation and AT per set 73
11 Installation of 600/700/800/900 AH Li-ion battery with A.T. per set 4
12 Installation of 600/700/800/900 AH VRLA battery with A.T. per set 7
13 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH Li-ion battery with transportation and AT per set 2
14 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH VRLAbattery with transportation and AT per set 15
15 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH Li-ion battery with A.T. per set 1
16 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH VRLA battery with A.T. per set 1
17 Installation of 3000/4000AH Li-ion battery with transportation and AT per set 1
18 Installation of 3000/4000AH VRLA battery with transportation and AT per set 4
19 Installation of 3000/4000AH Li-ion battery with A.T. per set 1
20 Installation of 3000/4000AH VRLA battery with A.T. per set 2
21 Installation of upto 50 A SMPS power plant with transportation and AT per set 50
22 Installation of upto 50 A SMPS power plant with A.T. per set 20
23 Installation of 100A( 3+1) SMPS power plant with transportation and AT per set 10
24 Installation of 100A( 3+1) SMPS power plant with AT per set 3
25 Installation of 100A (5+1)/(7+1) SMPS power plant with transportation and AT per set 2
26 Installation of 100A (5+1)/(7+1) SMPS power plant with AT per set 4
27 Installation of 100A (9+1)/(13+2) SMPS power plant with transportation and AT per set 4
28 Installation of 100A (9+1)/(13+2) SMPS power plant with AT per set 4
29 Dismantling of 200/300/400/500 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 1
30 Dismantling of 200/300/400/500 AH VRLA battery including its packing & transporting within Bilaspur BA per set 173
31 Dismantling of 200/300/400/500 AH Li-ion battery without transportation per set 1
32 Dismantling of 200/300/400/500 AH VRLAbattery without transportation per set 7
33 Dismantling of 600/700/800/900 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 1
34 Dismantling of 600/700/800/900 AH VRLAbattery including its packing & transporting within Bilaspur BA per set 73
35 Dismantling of 600/700/800/900 AH Li-ion battery without transportation per set 1
36 Dismantling of 600/700/800/900 AH VRLA battery without transportation per set 1
37 Dismantling of 1000/1100/1200/1300/1400/1500AH Li-ion battery including its packing & transporting within Bilaspur BA per set 1
38 Dismantling of 1000/1100/1200/1300/1400/1500AH VRLA battery including its packing & transporting within Bilaspur BA per set 14
39 Dismantling of 1000/1100/1200/1300/1400/1500AH Li-ion battery without transportation per set 1
40 Dismantling of 1000/1100/1200/1300/1400/1500AH VRLAbattery without transportation per set 1
41 Dismantling of 2000/2500/4000 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 1
42 Dismantling of 2000/2500/4000 AH VRLA battery including its packing & transporting within Bilaspur BA per set 4
43 Dismantling of 2000/2500/4000 AH Li-ion battery without transportation per set 1
44 Dismantling of 2000/2500/4000 AH VRLA battery without transportation per set 1
45 Dismantling of Power Plant upto 50 Amp. Including its packing & transporting within Bilaspur BA per set 15
46 Dismantling of Power Plant upto 50 Amp. without transportation per set 3
47 Dismantling of Power Plant of 100 Amp including its packing & transporting within Bilaspur BA per set 3
48 Dismantling of Power Plant of 100 Amp without transportation per set 3
49 Supply and preparation of copper lugs at sites > 50 sq.mm per no 10
50 Supply and fixing of runway at sites per mtr 30
51 AC/ DC Cable laying work per mtr 1000
52 Supply and installation of DCDB 8 poles of 32 A per no 3
53 Supply and installation of DCDB 8 poles of 100 A per no 4
54 Supply and fixing of HRC fuse with open base up to 100 A at sites per no 4
55 Supply and fixing of HRC fuse with open base> 100 A at sites per no 40
56 Supply of DC cable of up to 50 sq. mm per mtr 100
57 Supply of DC cable of up to 120 sq. mm per mtr 100
58 Welding for Battery set with material Per No/Set 140
59 Adhesive for Battery set with material Per No/Set 140
G_Total of package (In Rs.)
Financial Bid For Zone-2 (Raigarh OA)
S.No. Work Unit Qty
Rate Quoted by Bidder
In Figure In Words Total (In Rs)= Qty x Rate
1 Installation of 100/200/300 AH Li-ion battery with transportation and A.T. per set 1
2 Installation of 100/200/300 AH VRLA battery with transportation and A.T. per set 1
3 Installation of 100/200/300 AH Li-ion battery with A.T. per set 1
4 Installation of 100/200/300 AH VRLA battery with A.T. per set 1
5 Installation of 400/500 AH Li-ion battery with transportation and A.T. per set 10
6 Installation of 400/500 AH VRLA battery with transportation and A.T. per set 30
7 Installation of 400/500AH Li-ion battery with A.T. per set 5
8 Installation of 400/500AH VRLA battery with A.T. per set 10
9 Installation of 600/700/800/900 AH Li-ion battery with transportation and AT per set 10
10 Installation of 600/700/800/900 AH VRLAbattery with transportation and AT per set 10
11 Installation of 600/700/800/900 AH Li-ion battery with A.T. per set 5
12 Installation of 600/700/800/900 AH VRLA battery with A.T. per set 5
13 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH Li-ion battery with transportation and AT per set 4
14 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH VRLAbattery with transportation and AT per set 4
15 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH Li-ion battery with A.T. per set 3
16 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH VRLA battery with A.T. per set 3
17 Installation of 3000/4000AH Li-ion battery with transportation and AT per set 1
18 Installation of 3000/4000AH VRLA battery with transportation and AT per set 1
19 Installation of 3000/4000AH Li-ion battery with A.T. per set 1
20 Installation of 3000/4000AH VRLA battery with A.T. per set 1
21 Installation of upto 50 A SMPS power plant with transportation and AT per set 25
22 Installation of upto 50 A SMPS power plant with A.T. per set 10
23 Installation of 100A( 3+1) SMPS power plant with transportation and AT per set 10
24 Installation of 100A( 3+1) SMPS power plant with AT per set 5
25 Installation of 100A (5+1)/(7+1) SMPS power plant with transportation and AT per set 2
26 Installation of 100A (5+1)/(7+1) SMPS power plant with AT per set 2
27 Installation of 100A (9+1)/(13+2) SMPS power plant with transportation and AT per set 2
28 Installation of 100A (9+1)/(13+2) SMPS power plant with AT per set 2
29 Dismantling of 200/300/400/500 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 5
30 Dismantling of 200/300/400/500 AH VRLA battery including its packing & transporting within Bilaspur BA per set 5
31 Dismantling of 200/300/400/500 AH Li-ion battery without transportation per set 5
32 Dismantling of 200/300/400/500 AH VRLAbattery without transportation per set 40
33 Dismantling of 600/700/800/900 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 1
34 Dismantling of 600/700/800/900 AH VRLAbattery including its packing & transporting within Bilaspur BA per set 7
35 Dismantling of 600/700/800/900 AH Li-ion battery without transportation per set 1
36 Dismantling of 600/700/800/900 AH VRLA battery without transportation per set 20
37 Dismantling of 1000/1100/1200/1300/1400/1500AH Li-ion battery including its packing & transporting within Bilaspur SSA per set 1
38 Dismantling of 1000/1100/1200/1300/1400/1500AH VRLA battery including its packing & transporting within Bilaspur SSA per set 2
39 Dismantling of 1000/1100/1200/1300/1400/1500AH Li-ion battery without transportation per set 1
40 Dismantling of 1000/1100/1200/1300/1400/1500AH VRLAbattery without transportation per set 1
41 Dismantling of 2000/2500/4000 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 1
42 Dismantling of 2000/2500/4000 AH VRLA battery including its packing & transporting within Bilaspur SSA per set 1
43 Dismantling of 2000/2500/4000 AH Li-ion battery without transportation per set 1
44 Dismantling of 2000/2500/4000 AH VRLA battery without transportation per set 1
45 Dismantling of Power Plant upto 50 Amp Including its packing & transporting within Bilaspur BA per set 15
46 Dismantling of Power Plant upto 50 Amp without transportation per set 15
47 Dismantling of Power Plant of 100 Amp including its packing & transporting within Bilaspur BA per set 5
48 Dismantling of Power Plant of 100 Amp without transportation per set 5
49 Supply and preparation of copper lugs at sites > 50 sq. mm per no 15
50 Supply and fixing of runway at sites per mtr 30
51 AC/ DC Cable laying work per mtr 300
52 Supply and installation of DCDB 8 poles of 32 A per no 5
53 Supply and installation of DCDB 8 poles of 100 A per no 5
54 Supply and fixing of HRC fuse with open base up to 100 A at sites per no 25
55 Supply and fixing of HRC fuse with open base> 100 A at sites per no 25
56 Supply of DC cable of up to 50 sq. mm per mtr 40
57 Supply of DC cable of up to 120 sq.mm per mtr 30
58 Welding for Battery set with material Per No/Set 15
59 Adhesive for Battery set with material Per No/Set 10
G_Total of package (In Rs.)
Financial Bid For Zone-3 (Surguja OA)
S.No. Work Unit Qty Rate Quoted by Bidder
In Figure In Words Total (In Rs)= Qty x Rate
1 Installation of 100/200/300 AH Li-ion battery with transportation and A.T. per set 10
2 Installation of 100/200/300 AH VRLA battery with transportation and A.T. per set 30
3 Installation of 100/200/300 AH Li-ion battery with A.T. per set 10
4 Installation of 100/200/300 AH VRLA battery with A.T. per set 20
5 Installation of 400/500 AH Li-ion battery with transportation and A.T. per set 10
6 Installation of 400/500 AH VRLA battery with transportation and A.T. per set 30
7 Installation of 400/500AH Li-ion battery with A.T. per set 10
8 Installation of 400/500AH VRLA battery with A.T. per set 25
9 Installation of 600/700/800/900 AH Li-ion battery with transportation and AT per set 5
10 Installation of 600/700/800/900 AH VRLAbattery with transportation and AT per set 15
11 Installation of 600/700/800/900 AH Li-ion battery with A.T. per set 4
12 Installation of 600/700/800/900 AH VRLA battery with A.T. per set 10
13 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH Li-ion battery with transportation and AT per set 2
14 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH VRLAbattery with transportation and AT per set 4
15 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH Li-ion battery with A.T. per set 2
16 Installation of 1000/1100/1200/1300/1400/1500/2000/2500 AH VRLA battery with A.T. per set 4
17 Installation of 3000/4000AH Li-ion battery with transportation and AT per set 1
18 Installation of 3000/4000AH VRLA battery with transportation and AT per set 1
19 Installation of 3000/4000AH Li-ion battery with A.T. per set 1
20 Installation of 3000/4000AH VRLA battery with A.T. per set 1
21 Installation of upto 50 Amp SMPS power plant with transportation and AT per set 30
22 Installation of upto 50 Amp SMPS power plant with A.T. per set 30
23 Installation of 100A( 3+1) SMPS power plant with transportation and AT per set 8
24 Installation of 100A( 3+1) SMPS power plant with AT per set 15
25 Installation of 100A (5+1)/(7+1) SMPS power plant with transportation and AT per set 10
26 Installation of 100A (5+1)/(7+1) SMPS power plant with AT per set 10
27 Installation of 100A (9+1)/(13+2) SMPS power plant with transportation and AT per set 5
28 Installation of 100A (9+1)/(13+2) SMPS power plant with AT per set 5
29 Dismantling of 200/300/400/500 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 4
30 Dismantling of 200/300/400/500 AH VRLA battery including its packing & transporting within Bilaspur BA per set 25
31 Dismantling of 200/300/400/500 AH Li-ion battery without transportation per set 15
32 Dismantling of 200/300/400/500 AH VRLAbattery without transportation per set 20
33 Dismantling of 600/700/800/900 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 6
34 Dismantling of 600/700/800/900 AH VRLAbattery including its packing & transporting within Bilaspur BA per set 15
35 Dismantling of 600/700/800/900 AH Li-ion battery without transportation per set 8
36 Dismantling of 600/700/800/900 AH VRLA battery without transportation per set 6
37 Dismantling of 1000/1100/1200/1300/1400/1500AH Li-ion battery including its packing & transporting within Bilaspur BA per set 2
38 Dismantling of 1000/1100/1200/1300/1400/1500AH VRLA battery including its packing & transporting within Bilaspur BA per set 2
39 Dismantling of 1000/1100/1200/1300/1400/1500AH Li-ion battery without transportation per set 2
40 Dismantling of 1000/1100/1200/1300/1400/1500AH VRLAbattery without transportation per set 2
41 Dismantling of 2000/2500/4000 AH Li-ion battery including its packing & transporting within Bilaspur BA per set 1
42 Dismantling of 2000/2500/4000 AH VRLA battery including its packing & transporting within Bilaspur BA per set 1
43 Dismantling of 2000/2500/4000 AH Li-ion battery without transportation per set 1
44 Dismantling of 2000/2500/4000 AH VRLA battery without transportation per set 1
45 Dismantling of Power Plant upto 50 Amp Including its packing & transporting within Bilaspur BA per set 30
46 Dismantling of Power Plant upto 50 Amp without transportation per set 4
47 Dismantling of Power Plant of 100 Amp including its packing & transporting within Bilaspur BA per set 25
48 Dismantling of Power Plant of 100 Amp without transportation per set 4
49 Supply and preparation of copper lugs at sites > 50 sq.mm per no 40
50 Supply and fixing of runway at sites per mtr 300
51 AC/ DC Cable laying work Pr. Mtr. 300
52 Supply and installation of DCDB 8 poles of 32 A per no 25
53 Supply and installation of DCDB 8 poles of 100 A per no 10
54 Supply and fixing of HRC fuse with open base up to 100 A at sites per no 25
55 Supply and fixing of HRC fuse with open base> 100 A at sites per no 7
56 Supply of DC cable of up to 50 sq. mm per mtr 300
57 Supply of DC cable of up to 120 sq. mm per mtr 200
58 Welding for Battery set with material Per No/Set 191
59 Adhesive for Battery set with material Per No/Set 10
G_Total of package (In Rs.)
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TENDERDOCUMENTT.pdf
Tender Documents • 0.86 MB
Finnancialbid.xls
Other Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .