| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹41.6 CrAccepted-AOC | ₹41.6 Cr | 2 | Accepted-AOC L1 |
| 2 | 1₹41.6 CrRejected-Finance | ₹41.6 Cr | 1 | Rejected-Finance Unwilling to execute agreement |
| 3 | 3₹3.0 CrRejected-AOC | ₹3.0 Cr | 3 | Rejected-AOC L2 |
| 4 | 4₹45.1 CrRejected-AOC | ₹45.1 Cr | 4 | Rejected-AOC L3 |
| 5 | 5₹45.5 CrRejected-AOC | ₹45.5 Cr | 5 | Rejected-AOC L4 |
Tender Value
₹39.3 Cr
EMD Value
₹5 L
Closing Date
13 Jan 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER
PH CIRCLE, KWA, MALAPPURAM
JJM-CWSS to Thazhekkode and Alipparamba Pt - Additional Pipe line Extension, providing FHTCs and road restoration of NH, PWD and Panchayth Road for Package 1,2,3-Re appropriation -Additional Pipe line Extension, FHTCs and road restoration
2024_KWA_641022_1
SE/PHC/MPM/216/2023-24
Open Tender
Civil Works - Water Works
540 days
ALIPARAMBA
REFER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹16,540
₹5 L
PH CIRCLE, KWA, MALAPPURAM
3 Sept 2024
6 Jan 2024
15 Jan 2024
6 Jan 2024
13 Jan 2024
6 Jan 2024
6 Jan 2024 - 8 Jan 2024
8 Jan 2024
Amount
Appendix A - Additional Pipe line extension
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
OD222700/2023-2024:Dismantling manually/by mechanical means and disposal of materials within 50meters lead asper direction of Engineer in charge - Bituminous road
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
OD192726/2023-2024:Filling up with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete
100.10.1:Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 90mm Nominal Outer Diameter pipes.
18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore
OD201995/2023-2024:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Appendix B : - Cost of Materials
100.98.154:Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 90mm Outer Dia.
OD56702/2022-2023:Specials for 90 mm PE pipe
Appendix C- Providing additional FHTCs
100.60.13.1.2:Providing 15mm (1/2 inch) house connection with 15mm water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5m using 20mm ( 1/2 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.13.4.2:Providing 15mm (1/2 inch) house connection with 15mm water meter from existing AC / GI mains up to 125 mm dia., up to a length of 5m using 20mm ( 1/2 inch ) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16 Compression / GM / Brass specials viz. brass ferrule, brass hexagonal nipple, GM full way wheel valve, bend, MTA, FTA, couplers, GI / MS Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.2.1.2:Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains from 140mm to 200mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.23.3.1:Providing 15mm PVC Tap in the water meter assembly for 15mm ( 1/2 inch ) water connection, using 20mm ( 1/2 inch ) Indian Standard uPVC Class 6 pipes, uPVC specials and PP PN 16 Compression specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
OD13686/2023-2024:Dismantling manually/by mechanical means and disposal of materials within 50meters lead asper direction of Engineer in charge - Bituminous road
100.60.15.1.1:Providing additional length of house connection pipe using 20 mm (1/2 inch) PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PN16 specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers.
100.98.211:Supply of PVC Pipe, 6kg/cm2, 63mm Dia.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Appendix - D - Working charge - HDD along NHAI road
OD216083/2023-2024:Horizontal Direct Drilling HDD 600mm bore along/across roads, conveying ,jointing and pulling 500 mm HDPE pipe (PN16) already supplied ,with minimum drill length of 8m and at depth not exceeding 2M in normal rout (wherever no underground culvert ,bridge crossings etc )but shall not be less than 1.50M ,testing the pipe line to required test pressure ,including surveying the site for collecting information about Underground utility information and other obstructions using suitable modern sensing equipments ,pit making, pilot drilling, pre reaming, closing of pit with normal soil and consolidation as directed by the road authorities, without damaging other utility installations, Providing HDD rout markers at pit locations with provisions for extending/interconnections to the pipe lines already laid etc complete
Appendix - E - Cost of Materials - For HDD
100.37.9.1:In situ fabrication of M.S. pipes of size 300mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete.
100.37.9.2:Fabricating M.S. flanges of diameter 300mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.9.3:Cutting 300mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.9.4:Welding 300mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.37.9.5:Grinding cut and weld edges of 300mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates.
100.98.208:Supply of HDPE Pipe PE 100 (IS 4984/1995), 16kg, 500mm Outer Dia.
Appendix -F-Duct For NHAI Utility Pipe laying
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
Appendix -G-LSGD Road restoration
3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
OD201980/2023-2024:Filling with Quarry Muck Filling up low laying and water logged areas with local material / quarry muck , spreading in layers ,levelling the top at site and consolidation by ramming .etc complete for improving the CBR value of subgrade (OD from DSR 51.2.3)
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
5.1.1a:Prime Coat :- Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.3a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means :- Type A (II) Bitumen (S-65)
Appendix-H- ROAD RESTORATION -Panchayath Concrete Road
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Appendix I - NHAI Road restoration for DUCT
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
O ABDUL MAJEED
Malabar Tech
MIDLAND ENGINEERING AND CONTRACTING COMPANY
Fakrudheen ali ahammed
Bidder Name
Malabar Tech
Fakrudheen ali ahammed
O ABDUL MAJEED
MIDLAND ENGINEERING AND CONTRACTING COMPANY
MOHAMMED RASHID V.P.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf