Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC NH 148 B NEAR BABA GHISARAM FILLING STATION VILLAGE PALI MAHENDERGARH 123029 | MAHENDERGARH | MAHENDERGARH | HARYANA | 123029 | ₹12.6 L | L1 | Accepted-AOC LOA |
| 2 | L2₹14.9 L+₹2.4 L (18.7%)Rejected-Finance TYPE 2 RITURAJ SINGH AKBARPUR SARAI GHAGH KANNAUJ UTTAR PRADESH SARAIMEERA KANNAUJ UTTAR PRADESH 209725 | KANNAUJ | UTTAR PRADESH | 209725 | ₹14.9 L+₹2.4 L (18.7%) | L2 | Rejected-Finance Highest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non responsive |
Tender Value
₹15.0 L
EMD Value
₹30,040
Closing Date
7 Mar 2025, 3:00 pmClosed
NAVEEN RATHEE
ED - Ambala
Installation of Additional Solar Panel system in Court Complex at Pehowa, Shahabad and Kurukshetra under e-Courts Phase-III projects.
2025_HRY_430951_1
2025DF02F4F9 2FA1 4860 BE01 E2EEC6128577663BAR
Open Tender
Civil Works
Works
180 days
Ambala Cantt
Installation of Additional Solar Panel system in Court Complex at Pehowa, Shahabad and Kurukshetra under e-Courts Phase-III projects.
2 documents required · 2 mandatory
₹1,000
₹30,040
Yes
23 Apr 2025
28 Feb 2025
7 Mar 2025
1 Mar 2025
7 Mar 2025
1 Mar 2025
Amount
[32.70.2]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:- (a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. (b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC (c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency (d) Data Monitoring System complete with accessories. (e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (f) Lightning and surge voltage protection. (g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 2. Above 10 kWp and up to 100 Kwp [Through Rate]
OM SOLAR SOLUTIONS (BID ID -1223076)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .