Loading…
Loading…
Tender Value
₹11.1 L
EMD Value
₹12,000
Closing Date
24 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Chief Officer, Khambhat Nagarpalika, Khambhat
CONSTRUCTION WORK OF DRAINAGE LINE AND WATER PIPELINE IN NAGARPALIKA VARIOUS AREA @ KHAMBHAT NAGARPALIKA, KHAMBHAT DIST. ANAND (2ND ATTEMPT)
286409
2025-2026
Open
Civil Works
Anand
14 documents required · 14 mandatory
₹900
Chief Officer Khambhat Nagarpalika
₹12,000
14 Mar 2026
14 Mar 2026
14 Mar 2026
24 Mar 2026
14 Mar 2026
Date Of Opening of Technical Bid On Date :31/03/2026 At 11.00 Am (If Possible)
Date Of Opening of Price Bid On Date :31/03/2026 At12.00 Pm (If Possible)
KHAMBHAT NAGAR PALIKA,
KHAMBHAT. Dist: ANAND
PHONE No: (02698)221340
Khambhat Nagar Palika Page
02 DETAIL OF TENDER NIVIDA
CHIEF OFFICER,NAGAR PALIKA, KHAMBHAT
CONSTRUCTION WORK OF DRAINAGE LINE AND WATER PIPELINE IN NAGARPALIKA
VARIOUS AREA @ KHAMBHAT NAGARPALIKA, KHAMBHAT DIST. ANAND (2ND
(A) Details Of Tender Item:
Sr. Estimated EMD Tender Time Limit of
No. Tender Value (1% Of Estimated Fee Work
Name Of Work (Rs.) Amount in Rs.) In Rs.
CONSTRUCTION WORK OF
DRAINAGE LINE AND WATER
1 PIPELINE IN NAGARPALIKA 1109816.00 12000.00
VARIOUS AREA @ KHAMBHAT
NAGARPALIKA, KHAMBHAT DIST.
ANAND (2ND ATTEMPT)
(B) Schedule For E-Tendering Is Fixed as Under:
Up To Date: 24/03/2026Till 18:00 Hrs.
Last Date Downloading of Tender Documents
On Line Submission of Qualification Bid with Up To Date 24/03/2026Till 18:00 Hrs.
Technical Bid &Price Bid Document
Submission Of EMD, Tender Fee & Supporting Up To Date: 30/03/2026 At the Office of Chief Officer
Document About Eligibility in Hard Copy. Khambhat Nagar Palika By RPAD/Speed Post in Sealed
Cover. Duly Super Scribed with Name of Work & Tender
Date Of Opening of Price Bid On Date 31/03/2026 And 11.00 Pm (If Possible)
Date Of Commencement of Work Within 15 Days from The Issuance of Work Order
Security Deposit 5.5% Of Estimated Cost, 3.0% Security Deposit Of
Estimated Cost Shall Be Paid in The Form of FDR
Immediately After the Acceptance of Tender and
Remaining 2.5% shall be deducted from R.A Bill
Defects Liability Period Three Year from The Date of Actual Date of Completion
of Work. The Amount Of 3.0% Security Deposit Shall Be
Released After the Expiry of Defects Liability Period.
Remaining 2.5% Shall be Released after 1 yEar From
Date of Completion of Work
C Tenderer Shall Submit Their Offer I.E. Technical Bid as Well as Price Bid in Electronic Format on Above
Khambhat Nagar Palika Page
Mentioned Website.
D Submission Of Tender Fees, Bid Security and Other Valid Documents:
Tender Fee Inform Of DD And Bid Security I.E. EMD In The Form Of FDR In Favor Of “Chief Officer
Khambhat Nagar Palika“From Any Nationalized / Scheduled Bank And Shall Be Valid Up To 120 Days.
FDR Issued After the Last Date of Submission of Tender Will Not Be Considered as Valid or Accepted in
Hard Copy Submission Up to Date: 30/03/2026 At the Office of Chief Officer Khambhat Nagar Palika By
RPAD/Speed Post in Sealed Cover Duly Super Scribed with Name of Work & Tender ID No. Pre-
Qualification of Contractor Will Be Done on The Basis of Hard Copy Document and Same Will Be Verified
E Submission Of Hard Copy DocumentatKhambhat Nagar Palika
A Valid Registration Certificate Of Government Approved Contractor Class ‘E-2’ And Above
B Bank Solvency Certificate Not Less Than 20 % Of Estimated Amount
C Register Of Firms
D Partnership Deed (If Applicable)
F Tender Fee (DD)in Favor Of " Chief Officer Khambhat Nagar Palika”
G EMD (FDR) In Favor Of " Chief Officer Khambhat Nagar Palika”
H Last Three Year IT Return Copy and Seal and Sign of CA.
I Contractor Should Have an Experience of Work Completion (Form 3A) Of Similar Work of
Government Or Semi Government In Last 3 Year As Under
(1) One Work 80% Of Estimated Amount OR
(2) Two Work 50% Of Estimated Amount OR
(3) Three Work 40% Of Estimated Amount
J Contractor Shall Submit EPF/PF Account Number, Certificate with Hard Copy of Tender. And
Necessary Document of Above Registration at Time of Every R.A. Bill With Name of
K Contractor Have Submitted GST No. With Stamp and Sign Along with Physical Submission.
Contractor Daily Working
Contractor Have to Maintain Daily Work Register as Per R & B Dept. Format.
Contractor Must Be Submitted Daily Work Photos Send Via WhatsApp or Other Apps
(Chief Officer, Municipal Engineer, Consultant Engineer)
Note: - Contractor has to Responsible for Raised the Drainage Manhole Frame & Cover to New
Road Surface Level without any cost.
If Damage Water Supply Line, Drainage line, Gas Line or any Other Utility in Work Progress
then Contractor has to Responsible Repair Its Own Cost
F Opening Of Tender:
I After Evaluation of Tech. Bid, Price Bid of Only Those Bidders Would Be Opened Online Who
Are Found to Be Eligible.
ii Further Details/Clarification If Any Required Will Be Available from Chief Officer Khambhat
Nagar Palika, Station Road, Khambhat. Dist.: Anand Phone No: (02698)221340
G General Instructions:
I The Fees for On Line Tender Document Will Not Be Refunded Under Any Circumstances.
Khambhat Nagar Palika Page
II EMD In the Form Specified in Tender Document Shall Only Be Accepted.
III Tenders Without Valid Tender Document, Fees, Earnest Money Deposit (EMD) And Which Do
Not Fulfill All or Any of The Condition or Submitted Incomplete in Any Respect Will Be
IV Conditional Tender Shall Not Be Accepted.
V This Tender Notice Shall Form a Part of Tender Document.
VI The Tenderers Are Advised to Read Carefully The "Instruction for Tenderer" And "Eligibility
Criteria" Contained in The Tender Documents.
VII The Internet Site Address For E-Tender Is Http://Nagar Palika. Nprocure.Com and That of
Corporate Web Site Is Www.Nprocure.Com
VII The Nagar Palika Reserves the Rights to Reject Any or All Tenders Without Assigning Any
Reason Thereof.
IX Before The Deadline for Submission of Bids, The Employer May Modify the Bidding
Documents by Issuing Corrigendum.
X Contractor must have to submit required testing report as per R & B department criteria (10%
test report must be of GERI Lab & 90% test in Gov. App. Lab)
Khambhat Nagar Palika
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
03 - APPENDIX TO BID DETAILS
Name of Scheme : 15% VIVEKADHIN GRANT (2024-25)
District : ANAND
Name of Work : CONSTRUCTION WORK OF DRAINAGE LINE AND WATER
PIPELINE IN NAGARPALIKA VARIOUS AREA @ KHAMBHAT
NAGARPALIKA, KHAMBHAT DIST. ANAND (2ND ATTEMPT)
Tender Fee : Rs.
Amount Put to Tender : Rs.1109816.00
Earnest Money : Rs.
Time Limit for Completion : 3 (Three) Months from the Date of Work Order
Brief Description of Works:
The Main Scope of Works/Service to Be Provided to The Contractor Under This Bid Will Be as Under
Khambhat Nagar Palika Page
Name & Address ofConsultant Of This Work:
C. M. Engineering
Project Management Consultant
Name & Address ofExecuting Authority:
Municipal Engineer
Khambhat Nagarpalika
Khambhat, Dist : Anand
Name & Address Of Next Higher Authority:
Khambhat Nagar Palika
Khambhat, Dist : Anand
Khambhat Nagar Palika
Khambhat, Dist: Anand
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
4-NOTICE INVITING TENDERS
Name Of Work : CONSTRUCTION WORK OF DRAINAGE LINE AND WATER PIPELINE
IN NAGARPALIKA VARIOUS AREA @ KHAMBHAT NAGARPALIKA,
KHAMBHAT DIST. ANAND (2ND ATTEMPT)
SCHEME : 15% VIVEKADHIN GRANT (2024-25)
1. Tender Is Invited on Behalf of KHAMBHAT Nagar Palika. The Estimated
Cost of Work Is Rs.1109816.00 This Estimate However, Is Given as A
2. The Work Is Required to Be Completed Within 3 (Three) Months as Per the Terms of The
Contract Conditions.
3. The Contractors Whose Names Are on The Approved List of Contractors ofGujarat State R &B
Dept. / W.R.D. Class ‘E-2’ And Above Will Be Permitted to Tender. Not More Than One
Tender Shall Be Submitted by A Contractor or By Neither a Firm of Contractors nor Two Or
More Concerns in Which an Individual Is Interested as A Proprietor And / Or A Partner. If
They Do So, All Such Tenders Shall Be Liable to Be Rejected.
4. Bid Document Can Be Downloaded & Submitted in Electronic Format on Online Website:
Www.Nprocure.Com Date Up To 18/02/2026
5. Copies Of Other Drawings and Documents Pertaining to Tender and Signed for The Purpose
of Identification by The Accepting Officer or His Accredited Representative Will Be Open for
Inspection for Tenderer at The Following Offices During Working Hours.
(A) Chief Officer,Khambhat Nagar Palika, Khambhat.
6. Tenderers Are Advised to Visit the Site Sufficiently in Advance of The Date Fixed for
Submission of The Tender. A Tenderer Shall Be Deemed to Have Full Knowledge of All the
Relevant Documents Samples, Site Etc.; Whether He Inspects Them or Not.
7. Submission Of a Tender by Tenderer Implies That He Has Read This Notice and All Other
Contract Documents and Has Made Himself Aware of The Scope and Specification of The
Work to Be Done and Of Conditions and Local Conditions and Other Factors Bearing on The
Execution of The Works.
8. The Bidder Should Quote His Bid Premium or Rebate at The End ofSchedule-B. If He Do Not
Wish to Quote Premium or Rebate, He Should Indicate “At Par” In the Blank Space
Khambhat Nagar Palika Page
Preceding “% Above / Below” In Schedule-B. Thereafter He Should Work Out and Indicate
the Offered Bid Amount Both in Words and Figures in Schedule-B.
9. All Rates Shall Be Quoted On E-Tendering System.
10. The Tender for The Works Shall Not Be Witnessed by A Contractor or A Contractor Who
Himself / Themselves Has/Have Tendered or Who May and Has/Have Tendered for The
Same Works. Failure To Observe This Condition Shall Render the Tender of The Contractor
Tendering, As Well As of Those Witnessing the Tender, Liable to Rejection.
11. The Offered Bid Will Be opened At 11.00 Hours on Date 31/03/2026 In the Presence of
Bidders Who May Choose to Remain Present in The Office of The Bid Opening Authority
Specified in Bid Documents.
12. A Tenderer Shall Submit the Tender Who Satisfies Each and Every Condition Laid Down in
This Notice and Tender Documents, Failing Which the Tender Will Be Liable to Be Rejected.
13. Khambhat Nagar Palika Does Not Bind Itself to Accept the Lowest or Any Tender or To Give
Any Reasons for The Decision Taken.
14. This Notice of Tender Shall Form Part of The Contract Documents
Khambhat Nagar Palika
Khambhat Nagar Palika Page
PERCENTAGE RATE
Khambhat Nagar Palika Page
05 PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
1. Competency Of Tenderer – No Contract Will Be Awarded Except to Responsible Bidders
Capable of Performing the Class of Works Contemplated. Before The Award of The Contract,
Any Bidder May Be Required to Show That He Has the Necessary Facilities, Experience,
Ability and Financial Resources to Perform the Work in Satisfactory Manner Within the Time
Stipulated. Contractor May Be Required to Furnish the Department with The Statement of
Their Experience and Their Financial Status.
2. Tenderer Will Be Deemed To Have Inspected The Site And Have Satisfied To The Nature Of
All Works, All Existing Roads, Water-Way And Other Means Of Communication And Access
To And From The Site And Work And The Building That May Be Required For Temporary
Purpose In Connection With The Construction, Completion And Maintenance Of The Works
And Must Make His Own Enquiries As To Work, Yard Sites And Depot, And Dumps And As To
Acquisition Of Such Additional Sites And Areas As May Be Necessary For Temporary Purpose
For Construction, Completing And Maintaining The Works.
2.1 (I) The Bids Shall Be Offered in Electronic Format Only on Online Website
Www.Nprocure.Com Till the Date and Time Shown on Page
(Ii) Payment of Tender Fee, Earnest Money Deposit in Form of Demand Draft and FDR
Respectively, Shall Be Submitted in Electronic Format through Online (By Scanning) While
Uploading the Bid. This Submission Shall Mean That EMD & Tender Fee Are Received for
Purpose of Opening the Bid. Accordingly Offer of Bidder who’s EMD & Tender Fees Is
Received Electronically. However, For the Purpose of Realization of D.D. Bidder Shall Send
the D.D. In Original Through RPAD/Speed Post Only So as To Reach to Chief Officer
KHAMBHAT Nagar Palika, KHAMBHAT Within Mentioned Dates from The Last Date of
3 Payment: -The Tenderer Must Understand Clearly That the Rates Quoted Are for Completed
Works and Include All Costs of Labour, Scaffolding Plant, Supervision, Service Works, Power,
Royalties and Octroi Etc., And to Include All Extras to Cover the Cost of Night Work If and
When Required and No Claim for Additional Payment Beyond the Price/Rates Quoted Will
Be Entertained and The Tenderer Will Not Be Entitled Subsequently
Contractors To Please Read This Carefully: (A) The Percentage inSchedule ‘E-2’ Must Be
Given in Figures. Amount Thus Worked Out Must Also Be Entered in Column and Must Be
Struck Out Whichever Is Not Applicable by The Tenderer.
(B) If The Tender Is Taken in Favor of The Company, A Power of Attorney in Favor of The
Person Who May Have Signed the Tender for The Company Must Accompany the Tender.
Khambhat Nagar Palika Page
(C) Solvency Certificate ofaBank or A Revenue Officer of An Amount Not Less Than 20% Of
the Tender Cost Plus the Amount of Works on Hand Still to Be Executed Will Have to Be
Produced by The Contractor.
4. The Contractor Shall Have to Furnish PAN No. And I.T.Ward Under Which He Is Assessed.
5. Copies Of Certificate of Previous Experience, If Any, Must Accompany the Tender.
6. Declaration Showing All Works on Hand With The Contractor And The Value Of Works That
Remains To Be Executed In Each Case Must Accompany The Tender.
7. In Addition To The Above, The Tender Will Also Be Liable To Be Rejected Outright If.
(I) The Bidder Proposes Any Alteration In The Work Specified Or In The Time Allowed
For Carrying Out The Work Or Any Condition Or Correction Made In Any Code Or Mode Of
Schedule-B Or Specifications. Conditional Tender Will Be Out Right Rejected.
Signature Of the Contractor Chief Officer
Khambhat Nagar Palika
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
6- DECLARATION FORM
(I) I/We Hereby Declare That I/We Have Visited the Site and Fully Acquainted
Myself/Ourselves with The Local Situations Regarding Materials, Labour and Other Factors
Pertaining to The Work Before Submitting This Tender.
(Ii) I /We Hereby Declare That I/We Have Carefully Studied the Detail on Nivida and Conditions
and Special Condition of Contract, Specifications and Other All Documents of This Work and
Agree for Execute the Same Accordingly.
Signature Of the Contractor Chief Officer
Khambhat Nagar Palika
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
7- GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE OF
1. All Works Proposed To Be Executed By The Contractor Shall Be Notified In A Form Of
Invitation To Tender Pasted On A Board Hung Up In The Office Of The Chief Officer
KHAMBHAT Nagar PalikaAnd Signed By The Chief Officer KHAMBHAT Nagar Palika.
This Form Will State Work To Be Carried Out As Well As The Date Of Submitting And
Opening Tenders And The Time Allowed For Carrying Out The Work, Also The Amount Of
Earnest Money To Be Deposited With The Tender And The Amount Of The Security Deposit
To Be Paid By The Successful Tenderer And Percentage, If Any, To Be Deducted From Bill. It
Will Also State Whether A Refund Of Quarry Fees, Royalties, Octroi Dues And Ground Rents
Will Be Not Granted. Copies Of The Specifications, Designs And Drawing And Estimated
Rates, And Any Other Documents, Required In Connection With Work Which Shall Be Signed
By The Chief Officer KHAMBHAT Nagar PalikaFor The Purpose Of Identification Shall Also Be
Open For Inspection By Contractor At The Office Of The Chief Officer KHAMBHAT Nagar
PalikaDuring Office Hours.
Where The Works Are Proposed To Be Executed According To The Specifications
Recommended By A Contractor And Approved By A Competent Authority On Behalf Of The
KHAMBHAT Nagar Palika, Such Specifications With Designs And Drawing Shall Form Part Of
The Accepted Tender.
2. The Bidder Or The Person Authorized To Sign Digitally On Behalf Of The Bidder Shall Sign
The Bid Document. The Copy Of Legal Status Of Bidder (Partnership Deed Or Articles Of
Association Of The Company) Along With Other Documents To Be Submitted Physically.
3. Under No Circumstances Shall Any Contractor Be Entitled To Claim Enhanced Rate For Any
Items In This Contract.
4. Any Contractor Shall, Unless Exempted In Writing By The Chief Officer KHAMBHAT Nagar
PalikaConcerned, Produce Along With This Tender A Solvency Certificate Of His Financial
Ability From The Collector Of The District Within Which He Resides Or A Banker’s Certificate.
If He Fails To Produce Such A Certificate His Tender Will Not Be Considered.
5. The Measurements Of Work Will Be Taken According To The Usual Method In Use In The
Public Works Department And No Proposals To Be Adopted For Alternative Methods Will
Not Be Accepted. The Chief Officer KHAMBHAT Nagar PalikE1’sDecision As To What Is The
Usual Method In Use In The Nagarpalika Works Department Will Be Final.
6. The Insurance Company’s Bond Will Not Be Accepted Against The Security Deposit.
Khambhat Nagar Palika Page
6-A In Event Of Any Error Or Discrepancy In Write Up Of Tender Documents The Contractor Will
Not Take Any Undue Advantage Of Such Error Or Discrepancy And The Chief Officer
KHAMBHAT Nagar PalikaShall Have Powers To Interpret And Decide Correct Meaning Of
Contradictory Erroneous Writing .
7. The Contractor Will Have To Construct A Shed For Storing Controlled And Valuable Materials
At Work-Site Having Double Locking Arrangement. The Materials Will Then Be Taken For
Use In The Presence Of The Department Person. No Materials Will Be Allowed To Be
Removed From The Site Of Work.
8. Controlled Materials (Essentiality Certificate)
(Ii)The Contractor Shall Submit To The Chief OfficerOn Close Of Every CalendarMonth The
Monthly Returns In The Prescribed Forms As To The Receipts And Actual Use Of The
Materials During The Month.
(Iii) The Contractor Shall Permit The Chief Officer KHAMBHAT Nagar PalikaOr His
Representative To Inspect The Stock Of The Materials Stored By Him At Any Time Whenever
The Chief Officer Or His Representative So Desire (S).
9. The Tender For The Work Shall Remain Open For A Period Of 120 Days Counted From The
Last Date Of On Line Submission Of Bid.
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
08 TERMS &CONDITIONS OF CONTRACT
CLAUSE 1: Security Deposit:-
The Contractor Shall Have To Pay Security Deposit 2.50% Of Estimated Amount Within The Period
Of Ten Days From The Date Of Receipt Of Acceptance Letter. If The Security Deposit Is Not Paid
Within The Specified Time, Work Order Shall Not Be Issued Till The Issue About Delay Is Finally
Decided By The Competent Authority.
CLAUSE 2: Liquidated Damages For Delay:-
( I ) If The Contractor Fails To Complete The Work Under Contract By The Stipulated Date, He Shall
Pay Liquidated Damages Of At The Rate Of 0.01* Percentage Of The Contract Value Per Day From
The Date Of Delaying The Said Work Up To The Date Of Completion And Handing Over To The
KHAMBHAT Nagar Palika.
( Ii ) However Also If The Contractor Fails To Complete Any Part Of The Work As Designed In
Schedule‘ C ‘ By The Time Indicated Against Such Part, He Shall Pay Liquidated Damages Per Day
From The Date Of Delaying The Said Part Of The Work Up To The Date Of Completion Of The Said
Designated Part At The Rates Shown In The Said Schedule Of The Contract Value Of Such Part For
Such Failure Till The Designated Part Is Completed.
*AS Corrected Vide B &C D GR No. TNC – 1091 – 1B – 10 / (11) – C, Dated 29-6-92.
( Iii ) The Aggregate Maximum Of Liquidated Damages Payable Under Clause No.2 Shall Not Exceed
0.10 Percentage Of Contract Value Per Day And Shall Be Subject To The Maximum Amount Of 10 %
Of The Estimated Amount Put To Tender.
( Iv ) Delays Requiring Payment Of Ten Percentage Liquidated Damages Of The Amount Put To
Tender For Performance Shall Be Sufficient Causes For Termination Of Contract And For Forfeiture
Of Security Deposit Including Amount Of Performance Bond In Respect Of Works Estimated To Cost
More Than Rs.15 Lacs, And Performance And Registration Of The Contractor Shall Also Be Kept In
Abeyance For Three Years From The Date As Fixed In All Cases. (See Schedule (C) On Page No
CLAUSE 3 :Default By Contractor :
If The Contractor Shall Neglect Or Fail To Proceed With The Work With Due Diligence Or If He
Violates Any Of The Provision Of The Contract, The Chief Officer KHAMBHAT Nagar PalikaShall Give
The Contractor A Notice, Identifying Deficiencies In Performance And Demanding Corrective Action.
Such Notice Shall Clearly State That It Is Given Under The Provision Of This Clause. After Service Of
Such Notice, The Contractor Shall Not Remove Any Plant, Equipment And Material From The Site.
The KHAMBHAT Nagar PalikaShall Have A Lien On All Such Plant, Equipment And Material From The
Date Of Such Notice Till They Said Deficiencies Have Been Corrected As Mentioned In The Said
If The Contractor Fails To Take Satisfactory Corrective Action Within Ten Days After Receipt Of Such
Notice, The Engineer-In-Charge On Behalf Of KHAMBHAT Nagar PalikaShall Terminate The Contract
In Whole. In Case The Entire Contract Is Terminated, The Amount Of Security Deposit And
Performance Bond If Any Together With The Value Of The Work Done But Not Paid For, Shall Stand
Forfeited To The KHAMBHAT Nagar Palika. The Plants, Equipment And Materials, Held Under This
Clause Shall Then Be At The Disposal Of The KHAMBHAT Nagar PalikaTo Recover The Amount
Equivalent To The Liquidated Damages And Registration Of The Contractor Shall Be Kept In
Abeyance For Three Years From The Date As Fixed In All Such Cases.
Khambhat Nagar Palika Page
The Chief Officer KHAMBHAT Nagar PalikaIf Necessary Shall Direct That A Part Or The Whole Of
Such Plant, Equipment And Material Be Removed From The Site Within A Stipulated Period. If The
Contractor Fails To Do So, The Engineer-In-Charge Shall Cause Them Or Any Part Of Them To Be
Sold Holding The Net Proceeds Of Such Sale To The Credit Of The Contractor. After Settlement Of
Accounts, The Lien By The KHAMBHAT Nagar PalikaOf The Contractor’s Remaining Plant Equipment
And Balances Of Materials Shall Be Released.
Termination Of The Contract In Whole Shall Be An Adequate Authority For The Engineer-In-Charge
To Demand Discharge Of The Obligations From The Guarantors Of The Security For The
If The Progress Of Any Particular Portion Of The Work Under Contract Is Unsatisfactory, The The
Chief Officer KHAMBHAT Nagar PalikaShall, Notwithstanding That The General Progress Of The
Work Is Satisfactory, In Accordance With Clause 2 Be Entitled To Take Necessary Action Under
Clause 3 After Giving The Contractor Ten Days’ Notice In Writing And The Contractor Shall Have No
Claim Whatsoever For Any Compensation For Any Loss Caused To Him Due To Such Action.
(Clause 1,2,3 And 4 Are Substituted Vide GR NO. TNC –1091/IB-10/(11)-C , Dated 15-10-91 &
Modified By GR Dated 29-10-91 &G.R.No. TNC-1088/IB/18/(13)-C Dated 31-8-94 And No.
CLAUSE 5: Extension Of Time Limit:
If The Contractor Shall Desire An Extension Of The Time For Completion Of The Work On The
Ground Of His Having Been Unavoidably Hindered In Its Execution Or Any Other Ground He Shall
Apply In Writing To The Engineer-In-Charge Before The Expiration Of The Period Stipulated In The
Tender Or Before The Expiration Of 30 Days From The Date On Which He Was Hindered Whichever
Is Earlier And The Engineer-In-Charge May, If In His Opinion, Believe That There Are Reasonable
Grounds For Granting An Extension, Grant Such Extension As He Thinks Necessary Or Proper. The
Decision Of The The Chief Officer KHAMBHAT Nagar PalikaIn This Matter Shall Be Final
As Soon As The Work Is Completed The Contractor Shall Give A Notice Of Such Completion To The
Engineer-In-Charge And On Receipt Of Such Notice The Engineer-In-Charge Shall Inspect The Work
And If He Is Satisfied That The Work Is Completed In All Respect Than:-
(I)For All Works Costing Up ToRs.50 Lacs (Amount Put To Tender) The Final Measurements Shall Be
Recorded Within 45 Days From The Date Of Physical Completion Of The Work And The Final Bill
Shall Be Prepared Within 45 Days From The Date Of Recording Final Measurement. The Completion
Certificate Shall Be Issued Within One Month From The Date Of Final Measurement Subject To The
Contractor Fulfilling His Obligation As Provided In The Contract And Subject To The Work Being
Complete In All Respects.
(Ii) In Respect Of Works Costing More Than Rs.50 Lacs (Amount Put On Tender), The Final
Measurements Shall Be Recorded Within 75 Days From The Date Of Physical Completion Of The
Work And The Final Bill Shall Be Prepared Within 75 Days From The Date Of Recording Final
Khambhat Nagar Palika Page
Measurements Subject To The Contractor Fulfilling His Obligations As Provided In The Contract
And Subject To The Work Being Complete In All Respects.
When Separate Period Of Completion Have Been Specified For Items Or Groups Of Items, The
Engineer-In-Charge Shall Issue Separate Completion Certificate For Such Items Or Groups Of Items.
No Certificate Of Completion Shall Be Issued Nor Shall The Work Be Considered To Be Complete Till
The Contractor Shall Have Removed From The Premises, On Which The Work Has Been Executed,
All Scaffolding, Sheds And Surplus Materials, Except Such As Are Required For Rectification Of
Defects; Rubbish And All Huts And Sanitary Arrangements Required For His Workmen On The Site
In Connection With The Execution Of The Work, As Shall Have Been Erected By The Contractor For
The Workmen And Cleared All Dirt From All Parts Of Building(S) In, Upon Or Around Which The
Work Has Been Executed Or Of Which He May Have Possession For The Purpose Of The Execution
Thereof And Cleared Floors, Gutters And Drains, Cased Doors And Sashes, Oiled Locks And
Fastenings Labeled Keys Clearly And Handed Them Over To The Engineer-In-Charge Or His
Representative And Made The Whole Premises Fit For Immediate Occupation Or Use To The
Satisfaction Of The Engineer-In-Charge . If The Contractor Shall Fail To Comply With Any Of The
Requirements Of These Conditions As Aforesaid, On Or Before The Date Of Completion Of The
Works, The Engineer-In-Charge May , At The Expenses Of The Contractor, Fulfill Such Requirements
And Dispose Of The Scaffolding, Or Surplus Materials And Rubbish Etc. As He Thinks Fit And The
Contractor Shall Have No Claim In Respect Of Any Such Scaffolding Or Surplus Materials Except For
Any Sum Actually Released By The Sale Thereof Less The Cost Of Fulfilling The Requirements And
Any Other Amount That May Be Due From The Contractor. If The Expenses Of Fulfilling Such
Requirements Are More Than The Amount Realized Such Disposal As Aforesaid The Contractor
Shall Forthwith, On Demand, Pay Such Excess. The Engineer-In-Charge Shall Also Have The Rights
To Adjust The Amount Of Excess Against Any Amounts That May Be Payable To The Contractor.
No Payment Shall Be Made For Any Work, Estimated To Cost Less Than Rupees One Thousand Till
After The Whole Of The Said Work Shall Have Been Completed And A Certificate Of Completion
Given. But In The Case Of Works Estimated To Cost More Than Rupees One Thousand, The
Contractor Shall On Submitting A Monthly Bill Therefore, Be Entitled To Receive Payment
Proportionate To The Part Of The Work Then Approved And Passed By The Engineer-In-Charge,
Whose Certificate Of Such Approval And Passing Of The Sum So Payable Shall Be Final And
Conclusive Against The Contractor., All Such Intermediate Payments Shall Be Regarded As
Payments By Way Of Advance Against The Final Payments Only And Not As Payments For Work
Actually Done And Completed And Shall Not Preclude The Engineer-In-Charge From Requiring Bad,
Unsound, Imperfect Or Unskilled Work To Be Removed And Taken Away And Reconstructed Or Re-
Erected, Nor Shall Any Such Payment Be Considered As An Admission Of The Due Performance Of
The Contractor Or Any Part Therefore In Any Respect Or The Accruing Of Any Claims, Nor Shall It
Conclude, Determine, Or Affect In Any Way The Power Of The Engineer-In-Charge As To The Final
Settlement And Adjustment Of The Accounts Or Otherwise Or In Any Other Way Vary Or Effect The
Contract. The Final Bill Shall Be Submitted By The Contractor Within One Month Of The Completion
Of The Work, Otherwise The Engineer-In-Charges Certificate Of The Measurements And Of The
Total Amount Payable For The Work Shall Be Final And Binding On All Parties.
Total Amount Payable For The Work Shall Be Final And Binding On All Parties.
Khambhat Nagar Palika Page
The Rates For Items Of Works Shall Be Valid Only When The Items Concerned Is Accepted As Having
Been Competed Fully In Accordance With The Sanctioned Specifications. In Cases Where The Items
Of Work Are Accepted As Not So Completed, The Engineer-In-Charge May Make Payment On
Account Of Such Items At Such Reduced Rates As He May Consider Reasonable In Preparation Of
Final Or On Account Bill.
CLAUSE 9 BillsTo Be Submitted Monthly:
A Bill Shall Be Submitted By The Contractor Each Month On Or Before The Date Fixed By The
Engineer-In-Charge For All Works Executed In The Previous Month And Engineer-In-Charge Shall
Take Or Cause To Be Taken The Requisite Measurements For The Purpose Of Having The Same
Verified And The Claim, So Far As It Is Admissible, Shall Be Adjusted, If Possible, Within Ten Days
From The Presentation Of The Bill. If The Contractor Does Not Submit The Bill Within The Time
Fixed As Aforesaid, The Engineer-In-Charge May Depute A Subordinate To Measure Up The Said
Work In The Presence Of The Contractor Or His Duly Authorized Agent Whose Countersignature To
The Measurement List Shall Be Sufficient Warrant And The Engineer-In-Charge May Prepare A Bill
From Such List Which Shall Be Binding On The Contractor In All Respects.
The Contractor Shall Submit All The Bills On The Printed Forms To Be Had On Application At The
Office Of The Engineer-In-Charge. The Charges To Be Made In The Bills Shall Always Be Entered At
The Rates Specified In The Agreement Or At The Partly Reduced Rates Subject To The Approval By
The Engineer-In-Charge In The Case Of Items Not Completed/Executed As Per Agreements Or In
The Case Of Any Extra Work Ordered In Pursuance Of These Conditions And Not Mentioned Or
Provided For In The Tender, At The Rate Here In After Provided For Such Work.
(1) The Contractor Shall Execute The Whole And Every Part Of The Work In The Most Substantial
And Workman-Like Manner And Both As Regards Materials And In Other Respects In Strict
Accordance With Specifications.
The Contractor Shall Also Confirm Exactly, Fully And Faithfully To The Design, Drawings And
Instructions In Writing For The Work Signed By The Engineer-In-Charge. The Design And The
Drawings Shall Be Lodged In The Office Of The Site Engineer-In-Charge To Which The Contractor
Shall Be Entitled To Have Access For The Purpose Of Inspection At Such Office During Office Hours.
Where The Instructions Referred To Above Are Not Contained In Separate Letters Addressed To
The Contractor The Same Shall Be Recorded In The Work-Order Book, Which Shall Be Maintained
And Kept On The Site Of The Work. The Contractor Shall Be Required To Sign Such Entire In The
Work-Order Book In Token Of Having Noted The Instructions. However, If The Contractor Fails To
Sign The Work-Order Book For Any Reason Whatsoever, The Entry Of The Instructions In The Work-
Order Book Shall Be Deemed To Be The Due Notice To Him Of The Said Instructions. The Work-
Order Book Shall Be Open For Inspections To The Contractor On The Site Of The Work During Office
(2) The Contractor Will Be Entitled To Receive One Copy Of The Accepted Tender Along With The
Work Order Free Of Cost And Will Also Be Entitled To Receive Three Sets Of Contract And Working
Drawings According To The Progress Of Work As And When Needed, Free Of Cost.
Khambhat Nagar Palika Page
(3) The Several Documents Forming The Contract Are Essential Parts Of The Contract And
Requirements Occurring In One Are Binding As Through Occurring In All. They Are Intended To Be
Mutually Explanatory And Complimentary And To Describe And Provide For A Complete Work.
In The Event Of Any Discrepancy In The Several Documents Forming The Contract Or In Any One
Document, The Following Order Of Precedence Should Apply.
(A) Dimension And Quantities :(I) Drawings (Ii) Schedule-B Of The Tender Form (Iii) Specification.
On Drawings, Figures Dimensions, Unless Obviously Incorrect, Will Be Followed In Preference To
Scaled Dimensions.
(B) Description: (I) Schedule-B Of The Tender Form :- (Ii) Drawings (Iii) Specifications.
In The Case Of Effective Description Or Ambiguity, The Engineer-In-Charge Is Entitled To Issue
Further Instructions Directing In What Manner The Work Is To Be Carried Out. The Contractor
Cannot Take Any Advantage Of Any Apparent Error Or Omission In Drawings Or Specifications And
The Engineer-In-Charge Shall Be Entitled To Make Corrections And Interpretations As Necessary To
Fulfill The Plans And Specifications.
The Engineer-In-Charge Shall Have Power To Make Any Alterations In Or Addition To The Original
Specifications, Drawings, Designs And Instructions That May Appear To Him To Be Necessary Or
Advisable During The Progress Of The Work And The Contractor Shall Be Bound To Carry Out The
Work In Accordance With Any Instructions In This Connection Which May Be Given To Him In
Writing Signed By The Engineer-In-Charge And Such Alternation Shall Not Invalidate The Contract
And Additional Work Which The Contractor May Be Directed To Do In The Manner Above Specified
As Part Of The Work Shall Be Carried Out By The Contractor On The Same Conditions In All Respects
On Which He Agreed To Do The Main Work And At The Same Rate As Out By The Contractor On
The Same Conditions In All Respects On Which He Agreed To Do The Main Work And At The Same
Rate As Are Specified In The Tender For The Main Work.
13.1 Except That When The Quantity Of Any Item Exceeds The Quantity As In The Tender By
More Than 30% The Contractor Will Be Paid For The Quantity In Excess Of 30 % At The Rate
Entered In The S.O.R. Of The Year During Which The Excess In Quantity Is First Executed And For
The Materials Consumed In Excess Quantity The Rate For The Materials To Be Charged Would Be
The Basic Rate Taken Into Account For Fixing The Rate For The S.O.R. Above Instead Of The Rate
Stipulated In Schedule – A.
13.2. If The Additional Or Altered Work Includes Any Class Of Work For Which No Rate Is
Specified In This Contract, Then Such Class Of Work Shall Be Carried Out.
(I) At The Rate Derived From The Item Within The Contract Which Is Comparable To The One
Involving Additional Or Altered Class Of Work, Where There Are More Than One Comparable Items,
The Item Of The Contract Which Is Nearest In Comparison With Regard To Class Or Classes Of The
Work Involved Shall Be Selected And The Decision Of The Superintending Engineer As To The
Nearest Comparable Item Shall Be Final And Binding On The Contractor.
Khambhat Nagar Palika Page
(Ii) If The Rate Cannot Be Derived In Accordance With (I) Above, Such Class Of Works Shall Be
Carried Out At The Rate Entered In The Schedule Of Rates Of The Division For The Year In Which
The Tender Was Received, Increased Or Decreased By The Percentage By Which The Tender
Amount Is More Or Less As Compared To The Amount Arrived At The Rates In The “Schedule Of
Rates” Of The Division In The Year In Which The Tender Was Received. If The Schedule Of Rates Of
The Division Does Not Contain All The Items The Percentage Increase Or Decrease Of The Tender
Shall Be Calculated Considering Such Items Which Were Included In The “Schedule Of Rates “Of The
Division For The Year And For Materials Consumed On Such Item The Rate To Be Charged Would Be
The Basic Rate Taken Into Account For Fixing The Rate In S.O.R. Referred To Above Instead Of The
Rate. Stipulated In Schedule“A”
(Iii) If It Is Not Possible To Arrive At The Rate From (I) And (Ii) Above, Such Class Of Work Shall Be
Carried Out At The Rate Decided By The Competent Authorities On The Basis Of Detailed Rate
Analysis After Hearing The Contractor Before A Committee Of Two Superintending Engineers
Stationed At The Same Place Or The Nearest Place.
13.3 If The Additional Or Altered Work, For Which No Rate Is Entered In The “Schedule Of Rates”
Of The Division Is Ordered To Be Carried Out Before The Rate Is Agreed Upon, Then The Contractor
Shall Within Seven Days Of The Date Of Receipt By Him Of The Order To Carry Out The Work,
Inform The Engineer-In-Charge Of The Rate, Which It Is His Intention To Charge For Such Class Of
Work And If The Engineer In Charge Does Not Agree To This Rates, He Shall By Notice In Writing Be
At Liberty To Cancel His Order To Carry Out Such Class Of Work And Arrange To Carry It Out In Such
Manner As He May Consider It Advisable, Provided Always That If The Contractor Shall Commence
Work Or Incur Any Expenditure In Regard Thereof Before The Rates Shall Have Been Determined As
Lastly Herein Before Mentioned, Then In Such Cases He Shall Only Be Entitled To Be Paid In Respect
Of The Work Carried Out Or Expenditure Incurred By Him Prior To The Date Of The Determination
Of The Rate As Aforesaid According To Such Rate Or Rates As Shall Be Fixed By The Engineer-In-
Charge. In The Event Of The Dispute, The Decision Of The Superintending Engineer Of The Circle
Shall Be Final.
Where, However, The Work Is To Be Executed According To Be The Designs, Drawings And
Specification Recommended By The Contractor And Accepted By The Competent Authority, The
Alternation Above Referred To Shall Be Within The Scope Of Such Designs, Drawing And
Specifications Appended To The Tender.
The Time Limit For The Completion Of The Work Shall Be Extended In The Proportion That The
Increase In The Cost Occasioned By Shall Be Final And Conclusive.
13.4 For Excess In Item Of Well Sinking The Rates For Sinking In Depth Beyond The Designed
Depth Shall Be As Per The Rate Quoted By The Contractor In The Statement Of Variation, If No
Rates Of Variation In Sinking Are Quoted The Rate Payable Shall Be The Tender Rate For Sinking At
Designed Level Increased By The Difference Of Schedule Of Rate For Sinking At Designed Depth And
Sinking At Final Depth.
No Claim For Any Payment Of Compensation For Change Or Restriction Of Work:
If At Any Time After The Execution Of The Contract Documents The Engineer-In-Charge Shall For
Any Reason Whatsoever, Require The Whole Or Part Of The Work, As Specified In The Tender, Be
Khambhat Nagar Palika Page
Stopped For Any Period Or Shall Not Require The Whole Or Part Of The Work To Be Carried Out At
All Or To Be Carried Out By The Contractor, He Shall Give Notice In Writing, Stating The Fact To The
Contractor Who Shall Thereupon Suspend Or Stop The Work Totally Or Partially, As The Case May
Be. In Any Such Case , Except As Provided Hereunder, The Contractor Shall Have No Claim To Any
Payment Or Compensation Whatsoever Except As Provided Hereunder On Account Of Any Profit Or
Advantage Which He Might Have Derived From The Execution Of The Work In Full But Which He
Did Not So Derive In Consequence Of The Full Amount Of The Work Not Having Been Carried Out,
Or On Account Of Any Loss That He May Be Put To On Account Of Materials Purchased Or Agreed
To Be Purchased Or For Unemployment Of Labour Required By Him. He Shall Not Have Also Any
Claim For Compensation By Reason Of Any Alteration Having Been Made In The Original
Specifications, Drawings, Designs And Instructions Which May Involve Any Curtailment Of The
Work As Originally Contemplated.
(1) However, The Contractor Will Be Entitled For Compensation For Loss, If Any On The Date Of
Notice, For The Purchased Materials Or For The Contract Executed For The Material To Be
Purchased For Such Work. Such Compensation Will Be Paid Only For Actual Loss For Materials, If
Such Materials So Purchased Or Agreed To Purchase Is Of Required Quantity/Quality And Was
Purchased/ Contracted To Be Purchased Only For The Same Work. But No Compensation Shall Be
Granted To Contractor On Material For Which Advance Has Been Given To Contractor By
KHAMBHAT Nagar Palika. The Amount Of Loss For Such Claim Will Be Decided By In Charge
Engineer-In-Charge.
(2) The Contractor Also Will Be Entitled For Compensation Of Unemployed Labourers For 7 Days
From The Date Of Notice Provided That In That Opinion Of Engineer-In-Charge Such Labourers
Working For 7 Days Prior To The Notice And Would Not Be In A Position To Get Employment
Elsewhere Within 7 Days From The Date Of Such Notice .The Contractor Should Try To Employ Such
Unemployed Labourers At Other Places From The Date Of Such Notice.
In Case TheContractor Does Not Agree With The Decision Of Chief OfficerRegarding The Amount Of
Compensation Or Loss; It Will Be Open For The Contractor To Appeal To Superintending Engineer-In
–Charge Within One Month From The Date Of Knowledge Of Such Decision. In Such Case The
Decision Of Superintending Engineer Will Be Final And Binding To The Contractor.
The Contractor Shall Not Be Entitled For Loss Of Any Expected Profit Of Such Work.
(Vide G.R. NO. SSR/1090/IB/247(2) /C, Dated 28-6-1993 As Amended By GR Of Even Number Dated
CLAUSE 15 :Action & Compensation In Case Of Bad Work :
If At Any Time Before TheExpirey Of Defects Liability Period As Detailed In Clause 17-A. It Shall
Appear To The Engineer-In-Charge Or His Sub-Ordinate In Charge Of The Work That/Any Work Has
Been Executed Unsound, Imperfect Or Unskilled Workmanship Or With Materials Of Inferior
Quality Or That Any Materials Or Articles Provided By Him For The Execution Of The Work Are
Unsound , Or Of A Quality Inferior To That Contracted For Or Are Otherwise Not In Accordance
With The Contract, It Shall Be Lawful For The Engineer-In-Charge To Intimate This Fact In Writing To
The Contractor And Then Notwithstanding The Fact That The Work, Materials Or Articles
Complained For May Have Been Passed, Certified And Paid For The Contractor Shall Be Bound
Forthwith To Rectify, Or Remove And Reconstruct The Work So Specified In Whole Or In Part As
The Case May Require, Or If So Required, Shall Remove The Materials Or Articles So Specified In
Khambhat Nagar Palika Page
Whole Or In Part And Provide Other Proper And Suitable Materials Or Articles At His Own Charge
And Cost, And In The Event Of His Failing To Do So Within A Period To Be Specified By The
Engineer-In-Charge In The Written Intimation Aforesaid, The Contractor Shall Be Liable To Pay
Compensation At The Rate Of One Percent On The Amount Of The Estimate Of The Rectification
For Every Day Not Exceeding Ten Days During Which The Failure So Continues And In The Event Of
Any Such Failure As Aforesaid Continuing Beyond Ten Days, The Engineer-In-Charge May Rectify Or
Remove, And Re-Execute The Work Or Remove And Replace The Materials Complained Of As The
Case May Be At The Risk And Expense In All Respects Of The Contractor. Should The Engineer-In-
Charge Consider That Any Such Inferior Work Or Materials As Described Above May Be Accepted Or
Made Use Of, It Shall Be Within His Discretion To Accept The Same At Such Reduced Rates As He
May Fix Therefore .
However, The Contractor Shall Be Responsible For Normal Maintenance Of The Work Till The Final
Bill For The Work Is Prepared By The Departmental Officer.
Clause 15 A :Defect Liability Period :
The Contractor Shall Be Responsible To Make Good And Remedy At His Own Expenses Any Defect
Which May Develop Or May Be Noticed Before The Period Mentioned Hereunder From The
Certified Date Of Completion. The Engineer-In-Charge Shall Give The Contractor A Notice In Writing
About The Defects And The Contractor Shall Make Good The Same Within 15 Days Of Receipt Of
The Notice. In The Case Of Failure On The Part Of The Contractor, The Engineer-In –Charge May
Rectify Or Remove Or Re-Execute The Work At The Risk & Cost Of The Contractor. The Engineer-In-
Charge Shall Be Entitled To Appropriate The Whole Or Any Part Of The Amount Of Security Deposit
Towards The Expenses, If Any, Incurred By Him In Rectification, Removal Or Re-Execution
CLAUSE 16: Work To Be Open To Inspections – Contractor Or Responsible Agent To Be Present: -
All Works Under Or In Course Of Execution Or Executed In Pursuance Of The Contract Shall, At All
Times Be Open To The Inspection And Supervision Of The Engineer-In-Charge And His Subordinates
And The Contractor Shall, At All Times During The Usual Working Hours, And All Other Times For
Which Reasonable Notice Of The Intimation Of The Engineer-In-Charge Or His Subordinate To Visit
The Works Shall Have Been Given To The Contractor, Either Himself Be Present To Receive Orders
And Instructions Or Have A Responsible Agent Duly Accredited In Writing Present For That Purpose.
Orders Given To The Contractor’s Duly Authorized Agent Shall Be Considered To Have The Same
Force And Effect As If They Had Been Given To The Contractor Himself.
(I) G.R.B. &CD NO. RGN-6090-UO 24 (42)-C, Dated 26-11-90.
Employment Of A Qualified Site Engineer By The Contractor. The Contractor Shall. Employ Full-Time
Technically Qualified Staff During The Execution Of This Work As Under:-
1. Two Graduate Civil Engineers And Three Diploma Civil Engineers When Cost Of The Work To Be
Executed Is More Than Rs.50 Lakhs.
2. One Graduate & Two Diploma, Civil Engineers When The Cost Of The Work To Be Executed Is
More Than Rs.15 Lakhs But Less Than Rs.50 Lakhs.
Khambhat Nagar Palika Page
3. Minimum Two Diploma Civil Engineer When The Cost Of Work Is Less Than Rs.15 Lakhs But More
Than Rs.5 Lakhs.
4. Minimum One Diploma Civil Engineers For The Work When The Cost Of Work To Be Executed Is
Less Than Rs. 5 Lakhs. The Engineer So Employed For The KHAMBHAT Nagar PalikaWork Must Have
Sufficient Experience To Handle The Work Independently. Such An Engineer Shall Have To Stay At
The Site Of Work And He Shall Not Be Entrusted With Other Duty Except This Work.
In Case The Contractor Or Partner Of The Contractor Firm Is A Civil Graduate Engineer, Employment
Of Separate Engineer Will Not Be Necessary Provided That The Engineer Partner Himself Attends
The Execution Of The Work On The Site.
CLAUSE 18 :Notice To Be Given Before Work Is Covered Up :
The Contractor Shall Give Not Less Than Five Day’s Notice In Writing To The Engineer-In-Charge Or
His Subordinate In Charge Of The Work Before Covering Up Or Otherwise Placing Beyond The
Reach Of Measurement Any Work In Order That The Same May Be Measured And Correct
Dimensions There Of Taken Before The Same Is So Covered Up Or Placed Beyond The Reach Of
Measurement And If Any Work Shall Be Covered Up Or Placed Beyond The Reach Of Measurement
Without Such Notice Having And If Any Work Shall Be Covered Up Or Placed Beyond The Reach Of
Measurement Without Such Notice Having Been Given Or Consent Obtained , The Same Shall Be
Uncovered At The Contractor’s Expenses And In Default Thereof No Payment Or Allowance Shall Be
Made For Such Work Or For The Materials With Which The Same Was Executed.
If The Contractor Or His Workmen, Or Servants Shall Break , Deface, Injure Or Destroy Any Part Of
The Building Or The Work In A Question In/On Which They May Be Working Or Any Building , Road,
Fence, Enclosure Or Grassland Or Cultivated Ground Contiguous To The Premises On Which The
Works Or Any Part Thereof Is Being Executed Or If Any Damage Shall Be Done To The Work From
Any Causes Whatever Before Damage Occurred/Caused Due To Normal Flood Or Rain Or If Any
Imperfections Become Apparent In It Within Three Months From The Grant Of A Certificate Of
Completion, Final Or Otherwise By The Engineer-In-Charge , The Contractor Shall Make Good The
Same At Own Expenses Or In Default, The Engineer-In-Charge May Cause The Same To Be Made
Good By Other Contractor, And Deduct The Expenses (Of Which The Certificate Of The Engineer-In-
Charge Shall Be Final ) From Any Sums That May Thereafter Become Due To The Contractor Or
From His Security Deposit Or The Proceeds Of Sale Thereof Or A Sufficient Portion Thereof.
Neither Party Shall Be Liable To The Other For Any Loss Or Damage Occasioned By Or Arising Out Of
God, Such As UnPresidentedFlood, Volcanic Eruption, Earthquake Or Other Convulsion Of Nature
And Other Acts Such As But Not Restricted To General Strike, Invasion, The Acts Of Foreign
Countries, Hostilities, Or War Like Operations Before Or After Declaration Of War, Rebellion,
Military Or Usurped Power Which Prevent Performance Of The Contract And Which Could Not
Have Been Foreseen Or Avoided By A Prudent Person.
Note: “UnPresidentedFlood” Means The Flood Crossing The High Flood Level Of The Past ……...
Year(S) This Is On The Available Record.
(Modified Vide R&B D.G.R. No/ TNC – 1096 – IB –143 – (16) – C Dated 11-1-99)
Khambhat Nagar Palika Page
CLAUSE 20: Contractor To Supply Plant, Ladders, Scaffolding Etc. And Is Liable For Damage Arising
From Non-Provision Of Lights, Fencing Etc. :
The Contractor Shall Supply At His Own Cost All Materials (Except Such Special Materials If Any, As
May, In Accordance With The Contract To Be Supplied From The Public Works Department Stores),
Plant, Tools, Appliances, Implements, Ladders, Cordage, Tackle, Scaffolding, And Any Temporary
Works Which May Be Required For The Proper Execution Of The Work Whether In The Original,
Altered Or Substituted Form And Whether Included In The Specifications, Or Other Documents
Forming Part Of The Contract Or Referred To In These Conditions Or Not And Which May Be
Necessary For The Purpose Of Satisfying Or Complying With Requirements Of The Engineer-In-
Charge As To Any Matter Or To Which Under These Conditions He Is Entitled To Be Satisfied Or
Which He Is Entitled To Require Together With Carriage Therefore To And From The Work. The
Contractor Shall Also Supply Without Charge The Requisite Number Of Persons With The Means
And Materials Necessary For The Purpose Of Settings Out Works And Counting , Weighing And
Assisting In The Measurement Or Examination At Any Time And From Time To Time, Of The Work
Or The Materials, Failing This, The Same May Be Provided By The Engineer-In-Charge At The
Expenses Of The Contractor And The Expenses May Be Deducted From Any Money Due To The
Contractor Under The Contract Or From His Security Deposit, Or Proceeds Of Sale Thereof Or Of A
Sufficient Portion Thereof. The Contractor Shall Provide All Necessary Fencing And Lights Required
To Protect The Public From Accident And Shall Also Be Bound To Bear Expenses Of Defense Of
Every Suit, Action Or Other Legal Proceeding, At Law That May Be Brought By Any Person For Injury
Sustained. Owing To Neglect Of The Above Precautions And To Pay Any Damages And Costs Which
May Be Awarded In Any Such Suit, Action Or Proceedings To Any Such Person , Or Which May, With
The Consent Of The Contractor, Be Paid In Compromising Any Claim By Any Such Person.
The Contractor Shall Provide Suitable Scaffolds And Working Platforms, Gangways And Stairways,
And Shall Comply With The Following Regulation In Connection Therewith.
(A) Suitable Scaffolds Shall Be Provided For Workmen For All Works That Cannot Be Safely Done
From A Ladder Or By Other Means.
(B) A Scaffold Shall Not Be Constructed, Taken Down Or Substantially Altered Except
(I) Under The Supervision Of A Competent And Responsible Person.
(Ii) AppointedBy Contractor And By Competent Workers Possessing Adequate Experience In This
(C) All Scaffolds And Appliances Connected Therewith And All Ladders Shall
(g) Be Of Sound Material
(Ii) BeOf Adequate Strength Having Regard To The Loads And Strains To Which They Will Be
(Iii) BeMaintainedIn Proper Condition
(D)Scaffolds Shall Be So Constructed That No Part Thereof Can Be Displaced In Consequence Of
Khambhat Nagar Palika Page
(E) Scaffolds Shall Not Be Overloaded And So Far As Practicable The Load Shall Be Evenly
(F) Before Installing The Lifting Gear On Scaffolds, Special Precaution Shall Be Taken To Ensure The
Strength And Stability Of The Scaffolds.
(G) Scaffolds Shall Be Periodically Inspected By A Competent Person.
(H) Before Allowing A Scaffold To Be Used By His Workmen, The Contractor Shall, Whether The
Scaffold Has Been Erected By His Workmen Or Not, Take Steps To Ensure That It Complies Fully
With The Regulation Herein Specified.
( I ) Working Platforms, Gangways Shall –
(I) BeSo Constructed That No Part Thereof Can Dag Unduly Or Unequally.
(Ii) Be So Constructed And Maintained Having Regard To The Prevailing Conditions As To Reduce As
Far As Practicable Risks Of Persons Tripling Or Slipping And
(Iii) Be Kept Free From Any Unnecessary Obstruction.
( J ) In The Case Of Working Platforms, Gangways Working Places And Stairways At A Height
Exceeding ………………………………….(To Be Specified)
(I ) Every Working Platform And Every Gangway Shall Be Closely Boarded Unless Other Adequate
Measures Are Taken To Ensure Safety.
(Ii) Every Working Platform And Every Gangway Shall Have Adequate Width, And
(Iii) Every Working Platform, Gangway, Working Place And Stairway Shall Be Suitably Fenced.
(K) Every Opening In The Floor Of A Building Or In A Working Platform Shall, Except For The Time
And To The Extent Required To Allow The Access Of Person Or The Transport Or Shifting Of
Materials Be Provided With Suitable Means To Prevent The Fall Of Persons Or Material.
(L)When Persons Are Employed On A Roof Where There Danger Of Falling From A Height Exceeding
(4.25 Mt) 14 ‘(To Be Specified) Meters Suitable Precaution. Shall Be Taken To Prevent The Fall Of
Persons Or Material.
(M) Suitable Precautions Shall Be Taken To Prevent Persons Being Struck By Articles Which Might
Fall From Scaffold Or Other Working Place.
(N) Safe Means Of Access Shall Be Provided To All Working Platforms And Other Working Places.
CLAUSE 20 B: The Contractor Shall Comply With the Following Regulations As Regards the Hoisting
Appliances to Be Used By Him
(A) Hoisting Machines and Tackle Including Their Attachments, Anchorages and Supports Shall –
(I) Be Of Good Mechanical Construction, Sound Material and Adequate Strength and Free From
Patent Defect, And
(Ii) Be Kept In Good Repair and In Working Order
Khambhat Nagar Palika Page
(B) Every Rope Used In Hoisting Or Lowering Materials Or As A Means Of Suspension Shall Be Of
Suitable Quality And Adequate Strength And Free From Patent Defect.
(C) Hoisting Machines And Tackles Shall Be Examined And Adequately Tested After Erection On The
Site And Before Use And Be Re-Examined In Position At Intervals To Be Prescribed By Engineer-In-
(D) Every Chain, Ring, Hook, Shackle, Swivel And Pulley Block Used In Hoisting Or Lowering
Materials Or As A Means Of Suspension Shall Be Periodically Examined.
(E) Every Crane Driver Or Hoisting – Appliance Operator Shall Be Properly Qualified.
(F) No Person Who Is Below Age Of 15 Years Shall Be In Control Of Any Hoisting Machine, Including
Any Scaffolds, Nor Shall Give Signals To The Operator.
(G) In The Case Of Every Hoisting Machine And Of Every Chain, Ring Hook, Shackle, Swivel And
Pulley Block Used In Hoisting Or Lowering Or As A Means Of Suspension The Safe Working Load
Shall Be Ascertained By Adequate Means.
(H) Every Hoisting Machine And All Gears Referred To In Preceding Regulation Shall Be Plainly
Marked With The Safe Working Load.
( I ) In The Case Of Hosting Machine Having A Variable Safe Working Load, Each Safe Working Load
And Conditions Under Which It Is Applicable Shall Be Clearly Indicated.
( J ) No Part Of Any Hoisting Machine Or Gear Referred To In Regulation ‘G’ Above Shall Be Loaded
Beyond The Safe Working Load Except For The Purpose Of Testing.
(K) Motors, Gears, Transmissions, Electric Wiring And Other Dangerous Parts Of Hoisting Appliances
Shall Be Provided With Sufficient Safeguards.
( L ) Hoisting Appliances Shall Be Provided With Such Means As Will Reduce To A Minimum The Risk
Of The Accidental Descent Of The Load.
(M) Adequate Precautions Shall Be Taken To Reduce To Minimum The Risk Of Any Part Of A
Suspended Load Becoming Accidentally Displaced.
CLAUSE 21 :Measures For Prevention Of Fire :
The Contractor Shall Not Set Fire To Any Standing Jungle, Tree Bush Wood Or Grass Without A
Written Permit From The Engineer-In-Charge. When Such Permit Is Given, And Also In All Cases
When Destroying Cut Or Dug Up Tree, Bush Wood, Grass Etc. By Fire, The Contractor Shall Take
Necessary Measures To Prevent Such Fire Spreading To Or Other-Wise Damaging Surrounding
Property. When Such Permit Is Given And Also In All Cases When Destroying Cut Or Dug Up Tress,
Bush Wood, Grass Etc. By Fire, The Contractor Shall Take Necessary Measures To Prevent Such Fire
Spreading To Or Other-Wise Damaging Surrounding Property.
CLAUSE 22: Liability Of Contractors For Any Damages Done In Or Outside Work Area :
Compensation For All Damage Done Intentionally Or Unintentionally By Contractor’s Labourers
Whether In Or Beyond Limits Of KHAMBHAT Nagar PalikaProperty Including Any Damage Caused
By The Spreading Of Fire Mentioned In The Clause 22, Shall Be Estimated By The Engineer-In-
Khambhat Nagar Palika Page
Charge, Or Such Other Officer As He May Appoint And The Estimates Of The Engineer-In-Charge
Subject To The Decision Of The Superintending Engineer, On Appeal , Shall Be Final And The
Contractor Shall Be Bound To Pay The Amount Of The Assessed Compensation On Demand, Failing
Which The Same Will Be Recovered From The Contractor As Damages In The Manner Prescribed In
Clause 1 Or Deducted By The Engineer-In-Charge From Any Sums That May Be Due Or Become Due
From KHAMBHAT Nagar PalikaTo The Contractor Under This Contract Or Otherwise.
The Contractor Shall Bear The Expenses Of Defending Any Action Or Other Legal Proceeding That
May Be Brought By Any Person For Injury Sustained By Him Owing To Neglect Of Precautions To
Prevent The Spread Of The Fire And He Shall Also Pay The Damages And Cost That May Be
Awarded By The Court In Consequence.
Work Not To Be Sublet. Contract May Be Rescinded And Security Deposit Forfeited For Subletting
It Without Approval Or For Bribing A Public Officer Or If Contractor Becomes Insolvent:
The Contract Shall Not Be Assigned Or Sublet Without The Written Approval Of The Engineer-In-
Charge. And If The Contractor Shall Assign Or Sublet His Contract Or Attempt To Do So Or Become
Insolvent Or Commence Any Proceeding To Get Himself Be Adjudicated An Insolvent Or Make Any
Compromission With His Creditors, Or Attempt To Do So, The Engineer-In-Charge May, By Notice In
Writing Rescind The Contract, Also If Any Bribe, Gratuity , Gift Loan, Perquisite, Reward Or
Advantage, Pecuniary Or Otherwise, Shall Either Directly Or Indirectly Be Given, Promised Or
Offered By The Contractor, Or Any Of His Servants Or Agents To Any Public Officer Or Person In The
Employ Of KHAMBHAT Nagar PalikaIn Any Way Relating To His Office Or Employment, Or If Any
Such Officer Or Person Shall Become In Any Way Directly Or Indirectly Interested In Contract, The
Engineer-In-Charge May Thereupon By Notice In Writing Rescind The Contract. In The Event Of
Contract Being Rescinded, The Security Deposit Of The Contractor Shall Thereupon Stand Forfeited
And Be Absolutely At The Disposal Of KHAMBHAT Nagar PalikaAnd The Same Consequence Shall
Ensure As If The Contract Had Been Rescinded Under Clause 3 Thereof And In Addition The
Contractor Shall Not Be Entitled To Recover Or Be Paid For Any Work Therefore Actually Performed
Under Contract.
Sums Payable By Way Of Compensation To Be Considered As Reasonable Compensation Without
Reference To Actual Loss:
All Sums Payable By A Contractor By Way Of Compensation Under Any Of These Conditions Shall Be
Considered As A Reasonable Compensation To Be Applied To The Use Of KHAMBHAT Nagar Palika
Without Reference To The Actual Loss Or Damage Sustained And Whether Any Damage Has Or Had
Not Been Sustained.
CLAUSE 25: Change In The Constitution Of Firm To Be Notified:
In The Case Of A Tender By Partners, Any Change In The Constitution Of A Firm Shall Be Forthwith
Notified By The Contractor To Engineer-In-Charge For His Information.
CLAUSE 26: (1) Disputes To Be Referred To Tribunal:
Khambhat Nagar Palika Page
The Disputes Relating To This Contract, So Far As They Relate To Any Of The Following Matters,
Whether Such Disputes Arise During The Progress Of The Work Or After The Completion Or
Abandonment Thereof, Shall Be Referred To The Arbitration Tribunal, Gujarat State.
(I)The Rates Of Payment Under Clause 5 For Any Tools, Materials And Stores, In Or Upon The Works
Of The Site Thereof Or Belonging To The Contractor Or Procured By Him An Intended To Be Used
For Execution Of The Work Or Any Part Thereof Possession Of Which May Have Been Taken By The
Engineer-In-Charge Under The Said Clause-5
(Ii) The Reduction In Rates Made By The Engineer-In-Charge Under Clause 9 From The Items Of
Works Not Accepted As Completed Fully In Accordance With The Sanctioned Specifications.
(Iii) The Rate Of Payment For Any Class Of Work Which Is Included In The Additional Or Altered
Work Carried Out By The Contractor In Accordance With The Instructions Of The Engineer-In-
Charge Under Clause 14 And The Rates For Which Is To Be Determined Under The Said Clause
(Iv)The Rates Of Payment For Materials Already Purchased Or Agreed To Be Purchased By The
Contractor Before Receipt Of Notice Given By The Engineer-In-Charge Under Clause 15, And/or The
Amount Of Compensation Payable To The Contractor Under The Said Clause For Loss In Respect Of
Such Materials.
(V) The Amount Of Compensation Which The Contractor Shall Be Liable To Pay Under Clause 17 In
The Event Of His Failure To Rectify, Remove Or Reconstruct The Work Within The Period Specified
In The Written Intimation Or The Amount Of Expenses Incurred By The Engineer-In-Charge Under
The Said Clause 17 In Rectifying, Removing Or Re-Executing The Work Or In Removing And
Replacing The Materials Or Articles Complained Of.
(Vi) The Reduction Of Rates As May Be Fixed By The Engineer-In-Charge Under Clause 17 For The
Inferior Work Or Materials As Accepted Or Made Use Of.
(Vii) The Amount Of Compensation Payable By The Contractor For Damages As Estimated And
Assessed Under Clause
(Viii)The Amount Payable To The Contractor For The Work Carried Out Under Clause 33 In
Accordance With The Instructions And The Requirements Of The Engineer-In-Charge In A Case
Where There Are No Specifications.
(2) The Provision OfSection-21 Of The GPWD Dispute Arbi. Tribunal Act –92 & Order Issued By The
Govt. In Connection With This Act Will Now Apply For Arbitration (As Per KHAMBHAT Nagar
PalikaIn N. &W.R.D. Letter No. SUT/1090/2679/K2 Dt. 9/2/94.
(3) The Provision Of Arbitration Act .,Shall In So Far As They Are Inconsistent With The Provision Of
This Act Cease Of To Apply To Any Dispute Arising From A Works Contract And All Arbitration
Proceedings In Relation To Such Dispute Before An Arbitrator, Court Of Authority Shall Stand
Transferred To The Tribunal.
(4) The Awards Declared By The Arbitrator Should Be Speaking Award, Giving Reasons And
Calculations For Every Item Of Claims. The Decision Will Have To Be Implemented By All The
Departments Of The State KHAMBHAT Nagar PalikaAnd Public Sector Enterprises Of Gujarat.
(Resolution F.D.No. PB/1088/735/KT/Sachivalaya/Gandhinagar 5 thOctober 1988.)
Khambhat Nagar Palika Page
(5) In Case Of Dispute Leading To The Contractor Or KHAMBHAT Nagar PalikaOf Gujarat
Approaching To Court Of Law, It Shall Be Within The Jurisdiction Where The Site Of Work Is
(6) The Reference To Arbitration Proceeding Under This Clause Shall Not
(I) Affect The Right Of The Engineer-In-Charge Under Clause 5 To Take Possession Of All Or Any
Tools Plants Materials And Stores In Or Upon The Works Of Site Thereof Belonging To The
Contractor Or Procured By Him And Intended To Be Used For The Execution Of The Work Or Any
(Ii) Preclude TheEngineer-In-Charge From Utilizing The Materials Purchased By The Contractor In
Any Work Or From Removing Such Materials To Other Places, During The Period The Work Is
Stopped Or Suspended In Pursuance Of Notice Given To The Contractor Under Clause
(Iii) Entitle The Contractor To Stop The Progress Of The Work Or The Carrying Out The Additional Or
Altered Work In Accordance With The Provisions Of Clause 14 Or As The Case May Be Or Clause
CLAUSE 27 :Lump Sum In Estimates :
When The Estimate On Which A Tender Is Made Includes Lump Sum In Respect Of Part Of The
Work, The Contractor Shall Be Entitled To Payment In Respect Of The Items Of Work Involved Or
The Part Of The Work In Question At The Same Rates As Are Payable Under This Contract For Such
Items, Or If The Part Of The Work In Question Is Not In The Opinion Of The Engineer-In-Charge
Capable Of Measurement The Engineer-In-Charge May , As His Discretion, Pay The Lump Sum
Amount Entered In The Estimate And The Certificate In Writing Of The Engineer-In-Charge Shall Be
Final And Conclusive Against The Contractor With Regard To Any Sum Or Sums Payable To Him,
Under The Provisions Of This Clause.
CLAUSE 28 :Action Where No Specifications :
In The Case Of Work For Which There Is No Such Specification, Such Work Shall Be Carried Out Tin
Accordance With The Divisional Specification And In The Event Of There Being No Divisional
Specifications, Then, In Such Case The Work Shall Be Carried Out In All Respects In Accordance With
The Instructions And Requirements Of The Engineer-In-Charge.
CLAUSE 29: Definition Of Work :
The Expression “Work” Or “Works” Where Used In These Conditions Shall, Unless, There Be
Something In The Subject Or Context Repugnant To Such Construction To Mean The Work, Or The
Works, Contracted To Be Executed Under Or In Virtue Of The Contract, Whether Temporary Or
Permanent And Whether Original, Altered, Substituted Or Additional.
Contractor’s Percentage Whether Applied To Net Or Gross Amount If The Bill :Percentage Referred
To In The Tender Shall Be Deducted From / Added To The Gross Amount Of The Bill Before
Deducting The Value Of Any Stock Issued. (This Clause Shall Be Applicable Only For B-1 Tender)
CLAUSE 31: Non Refund of Quarry Fees &Royalties:
The Contractor Shall Pay The Royalty To The Competent Authority / Local Body As Per Rules. The
Contractor Shall Furnish Quarterly The Statement Showing Quantity Of Quarried Materials, From
Khambhat Nagar Palika Page
Whom Purchased ( With Full Address Of The Seller ) And Copies Of Bills For Purchase To The District
Officer Of The Mining And Geology Department Of Authority Competent To Levy Royalty In The
Area Of Work. Contractor Shall Also Furnish Such Additional Information As Regards Royalty
Payment To The Royalty Authority. The Royalty Charges Paid Shall Be Borne By The Contractor And
Shall Not Be Reimbursed By The Chief Officer ( Authority: - R &B D Circular No. TNC – 2286 – UO –
Clause 32: Compensation Under The Workmen’s Compensation Act :
The Contractor Shall Be Responsible For And Shall Pay Compensation To His Workman Payable
Under The Workman’s Compensation Act. 1923 (VIII Of 1923) Hereinafter Called The Said Act) For
Injuries Caused To The Workman. If Such Compensation Is Paid ByKHAMBHAT Nagar PalikaAs
Principal Under Sub-Section 12(1) Of The Said Act On Behalf Of The Contractor It Shall Be
Recoverable By KHAMBHAT Nagar PalikaFrom The Contractor Under Sub Section 12(2) Of The Said
Section. Such Compensation Shall Be Recovered In The Manner Laid Down In Clause 1 Above.
The Contractor Shall Be Responsible For And Shall Pay The Expenses Of Providing Medical Aid To
Any Workmen Who May Suffer A Bodily Injury As A Result Of An Accident. If Such Expenses Are
Incurred ByKHAMBHAT Nagar Palika, The Same Shall Be Recoverable From The Contractor
Forthwith And Be Deducted, Without Prejudice To Any Other Remedy Of KHAMBHAT Nagar
PalikaFrom Amount Due Or That May Become Due To The Contractor.
The Contractor Shall Provide All Necessary Personal Safety Equipment And First Aid Apparatus
Available For The Use Of The Person Employed On The Site And Shall Maintain The Same In Suitable
Condition For Immediate Use At Any Time And Shall Comply With The Following Regulations In
Connection Therewith.
(A) The Workers Shall Be Required To Use The Equipment So Provide By The Contractor And
Contractor Shall Take Adequate Steps To Ensure Proper Use Of The Equipment By Those
(B) When Work Is Carried On In Proximity To Any Place Where There Is A Risk Of Drowning All
Necessary Equipment Shall Be Provided And Kept For Use And All Necessary Steps Shall Be Taken
For The Prompt Rescue Of Any Person, In Danger.
(C) Adequate Provision Shall Be Made For Prompt First Aid Treatment Of All Injuries To Be
Sustained During The Course Of The Work.
Clause 33 :The Quantities Shown In The Tender Are Approximate And No Claim Shall Be
Entertained For Quantities Of Work Executed Being Less Than Those Entered In The Tender. In The
Case Of Increase In The Quantities By More Than 30% The New Rate Will Be Paid To The Contractor
For The Quantities In Excess Of 30% The Rates For The Increased Quantities As Aforesaid Will Be
Fixed In The Manner Specified In Clause –
Clause 34: EmploymentOf Famine Or Other Labour :The Contractor Shall Employ Any Famine,
Convict Or Other Labour Of Particular Kind Or Class, If Ordered In Writing To Do So By The
Engineer-In-Charge.
Khambhat Nagar Palika Page
Clause 35 :NoCompensation Shall Be Allowed For Any Delay Caused In The Starting Of The Work On
Account Of Delay In Making Available The Full Site Of Land At A Time.
Clause 36 :No Claim For Compensation Shall Be Allowed For Any Delay In Execution Of The Work
On Account Of Water Standing In Borrow Pits Or Compartment. The Rates Are Inclusive Of Hard Or
Cracked Soil, Excavation In Mud, Sub Soil Water Or Water Standing In Borrow-Pits And No Claim For
An Extra Rate Shall Be Entertained Unless Otherwise Expressly Specified.
Clause 37 :Entering Upon Or Commencing Any Portion Or Work :
The Contractor Shall Not Enter Upon Or Commence Any Portion Or Work Except With The Written
Authority And Instruction Of The Engineer-In-Charge Or Of His Subordinate In Charge Of The Work.
Failing Such Authority, The Contractor Shall Have No Claim To Ask Measurement Of Or Payment For
Clause 38 :Minimum Age Of Person Employed :
(I) No Contractor Shall Employ Any Person Who Is Under The Age Of 15 Years.
Clause 39 (I) (A) :
The Employment Of Donkeys And / Or Other Animals And The Payment Of Fair Wages :For
Asphalt Work(S) As Far As Possible, Only The Adult Persons Should Be Employed By The Contractor.
If The Adult Person Are Not Available, Then The Children Below The Age Of 15(Fifteen Years )
Should Not Be Employed Under Any Circumstance.
(II) No Contractor Shall Employ Donkeys Or Other Animals With Branching Of String Or Thin Rope.
The Branching Must Be At Least Three Inches Wide And Should Be Of Tape (Nawar).
(III) No Animal Suffering From Sores, Lameness Or Emaciation Or Which Is Immature Shall Be
Employed On The Work.
(IV) The Engineer-In-Charge Or His Agent Is Authorized To Remove From The Work Any Person Or
Animal Found Working Which Does Not Satisfy These Conditions And No Responsibility Shall
Be Accepted By KHAMBHAT Nagar PalikaFor Any Delay Caused In The Completion Work By
(V) The Contractor Shall Pay Fair And Reasonable Wages To The Workman Employed By Him In The
Contract Undertaken By Him. In The Event Of Any Dispute Arising Between The Contractor And
His Workmen On The Grounds That The Wages Paid Are Not Fair And Reasonable, The Dispute
Shall Be Referred Without Delay To The Engineer-In-Charge Who Shall Decide The Same. The
Decision Of The Engineer-In-Charge Shall Be Conclusive And Binding On The Contractor, But
Such Decision Shall Not In Any Way Affect The Conditions In The Contract Regarding The
Payment To Be Made By KHAMBHAT Nagar PalikaAt Sanctioned Tendered Rates.
(VI) The Contractor Shall Provide Drinking Water Facilities To The Workers/ Labourers Employed
On KHAMBHAT Nagar PalikaWorks Amenities Relating To Sanitation Shall Also Be Provided To
The Workers/Labourers Employed On Works (In Urban Areas) .If The Contractor Fails To
Comply With These Provisions, The Engineer-In-Charge Shall Give Notice In Writing And If The
Contractor Does Not Provide This Facility To The Workers/ Labourers Within A Period Of Ten
Khambhat Nagar Palika Page
Days From The Date Of The Notice In Writing, The Engineer-In-Charge Shall Thereupon Make
The Arrangement For Drinking Water At The Cost Of The Contractor.
(VII) The Contractor Shall Provide The Amenity Of Proper Shed And Shelter To The Workers/
Labourers And Their Children On KHAMBHAT Nagar PalikaWorks As Soon As The Work Starts.
If The Contractor Fails To Provide Shed And Shelter, The Engineer-In-Charge Shall Provide
The Same At The Cost Of Contractor.
Clause 40 :Method Of Payment :
Payment To Contractor Shall Be Made By Cheque Drawn On Any Treasury Within The Division
Convenient To Them, Provided The Amount Exceeds Rs. 10 Amount Not Exceeding Rs. 10 Will Be
Clause 40 A : Any Sum Of Money Due And Payable To The Contractor (Including The Security
Deposit Returnable To The Contractor) Executing Any KHAMBHAT Nagar PalikaWork Or Work Of
Any District Panchayat Wholly Financed As Grant-In-Aid Under This Contract Shall Be Appropriated
By Any District Panchayat / KHAMBHAT Nagar PalikaAnd Shall Be Set Off Against Any Claim Of The
KHAMBHAT Nagar Palika/District Panchayat Of Gujarat State By The District Panchayat Of Gujarat
State/KHAMBHAT Nagar PalikaFor The Payment Of A Sum Of Money Arising Out Or Under Any
Other Contract Made By The Contractor With The KHAMBHAT Nagar Palika/District Panchayat Of
Gujarat State For The Work Wholly The Contractor Against Any Claim Of The KHAMBHAT Nagar
Palika/ District Panchayat Of Gujarat State Is Available, Such A Recovery Shall Be Made From The
Contractor As Arrears Of Land Revenue.
Clause 41 :Employment Of Scarcity Labour :
If KHAMBHAT Nagar PalikaDeclares A State Of Scarcity Or Famine To Exist In Any Village Situated
Within 16 Kilometers Of The Work, The Contractor Shall Employ Upon Such Parts Of The Work, As
Are Suitable For Unskilled Labour, Any Person Certified To Him By The Engineer-In-Charge Or By
Any Persons To Whom, The Engineer-In-Charge May Have Delegated This Duty In Writing To Be In
Need Of Relief And Shall Be Bound To Pay To Such Persons, Wages Not Below The Minimum Which
KHAMBHAT Nagar PalikaMay Have Fixed In This Behalf. Any Disputes Which May Arise In
Connection With The Implementation This Clause Shall Be Decided By The Engineer-In-Charge
Whose Decision Shall Be Final And Binding On The Contractor.
Clause 42 :The Rates To Be Quoted By The Contractor Must Be Inclusive Of Sales Tax / GST. No
Extra Payment On This Account Will Be Made To The Contractor.
Clause 43 :The Contractor Should, As Far As Possible , Obtain His Requirement Of Labourers Skilled
And Unskilled , From The Nearest Employment Exchange So As To Utilize The Local Employment
Potential. If There Are No Local Employment Exchange Or Such Exchanges Are Not Able To Provide
The Required Labour Locally, Suitable Labourers Should Be Utilized To The Maximum Extent
Clause 44 :Fair Wages :
If A Contractor Fails To Pay Within ‘7’ (Seven) Days To The Labourer(S) /Worker(S) The Minimum
Wages Prescribed By The KHAMBHAT Nagar PalikaUnder The Minimum Wages Act. 1948 As In
Force From Time To Time, The Engineer-In-Charge Shall Be At Liberty To Deduct The Amount
Payable To The Labourer/ Workers From His (Contractors) Bills Or Deposit(S) Payable By The
Khambhat Nagar Palika Page
Contractor After Making Due Inquiries And Establishing The Claim(S) Of The Labourer(S)
The Contractor Shall Not Be Entitled To Any Payment Of Compensation On Account Of Any Loss
That The Contractor May Have To Incur On Account Of The Action As Aforesaid. Before The Action
As Aforesaid, Is Enforced, A Notice In Writing To The Contractor Shall Be Issued By The Engineer-In-
Charge To Pay The Wags As Per Minimum Wages Act In Force At The Relevant Time. If Contractor
Does Not Act As Aforesaid Within Seven Days, Then The Action Contemplated As Above Shall Be
Taken Against Him.
Clause 45 :List Of Machinery :
The Contractors Shall Also Give A List Of Machineries In His Possession And Which They Propose To
Use On The Work.
Clause 46 : (I) In Case , The Roller Deployed By Department For The Use On Contract Work Is Kept
Idle By The Contractor For Want Of Adequate Labour And Materials, The Contractor Will Have To
Pay Rental Charges As Per Prevailing Rules Even Though The Items Of Rolling And Watering Are To
Be Carried Out By The Department.
(Ii) If The Contractor Does Not Plan His Programme So As To Suit The Requirement Of The
Department, The Proportionate Rental Charge On Roller Shall Be Recovered From The Contractor.
Clause 47 :Local Labour On Normal Rates :
The Contractor Shall Have To Engage Local Labour And Person Seeking Employment Where
Available On Normal Rate.
Clause 48 :RentWill Be Recovered From The Contractor For The Land Given To Them For Stacking
Materials As Well As For Construction Of Temporary Hutments Etc.
Land Measuring Charges
1. One Hectare Or Less Rs.5 Per Month
2. More Than 1 Hectare & Up To 2 Hectares Rs.10 Per Month
3. More Than 2 Hectare & Up To 3 Hectares Rs.15 Per Month
4. More Than 3 Hectare & Up To 4 Hectares Rs.20 Per Month
Clause 49 :The Contractor Shall Employ Only Such Labour Who Shall Produce A Valid Certificate Of
Having Been Vaccinated Against Small-Pox Within A Period Of Last Three Years.
1 Huts :The Contractor Shall Build Sufficient Number Of Huts On A Suitable Plot Of Land For The
Use Of The Laborers According To The Following Specifications.
(1) Huts Of Bamboos And Grass May Be Constructed.
Khambhat Nagar Palika Page
(2) A Good Site Shall Be Selected. High Ground Removed From Jungle But Well Provided With Tress
Shall Be Chosen Wherever It Is Available. The Neighborhood Of Rank Jungle, Grass Or Weeds
Should Particularly Be Avoided. Camps Should Not Be Established Close To Large Cuttings Of
(3) The Lines Of Huts Shall Have Open Spaces Of At Least 10 M. Between Rows. When A Good
Natural Site Cannot Be Procured, Particular Attention Should Be Given To The Drainage.
(4) There Should Be No Over-Crowding. Floor Spaces At The Rate Of 2.8 Sq.M. Per Head Shall Be
Provided. Care Should Be Taken To See That The Huts Are Kept Clean And In Good Order.
(5) The Contractor Must Find Out His Own Land. If He Wants KHAMBHAT Nagar PalikaLand, He
Should Apply For It And Pay Assessment For It.
2. Drinking Water: TheContractor Shall As Far As Possible, Provide An Adequate Supply Of
Chlorinated Pure Potable Drinking Water For The Use Of Laboure’s. This Provision Shall Be At
The Rate Of Not Less Than 4.5 Liters Per Head. No Provision Need-Be Made Where There Is A
Suitable Nala , River Or Well Within 0.4 Km Of The Camp. However,Arrangement Should As Far
As Possible, Be Made To Chlorinate Water By Chlorinated Tables Before It Is Allowed For
Drinking Purpose.
3. The Contractor Shall Construct Semi Permanent Latrines For The Use Of Laboure’sOn The
Following Scale, Namely (A) WhereFemale Are Employed, There Shall Be At Least One Latrine
For Every 25 Females. (B) Where Males Are Employed There Shall Be At Least One Latrine For
Every 25 Males Provided That Where The Number Of Males Or Female Exceed 100 , It Shall Be
Sufficient If There Is One Latrine For Every 25 Males Or Females , As The Case May Be Up To The
First 100 And One For Every 50 Thereafter.
4. Privacy In Latrines: EveryLatrine Shall Be Under Cover And So Partitioned Off As To Secure
Privacy, And Shall Have A Proper Door And Fastenings.
5. Notice To Be Displayed Outside Latrines And Urinals :(1) Where Workers Of Both Sexes Are
Employed There Shall Be Displayed Outside Each Block Of Latrine And Urinal A Notice In The
Language Understood By The Majority F The Workers For Men Only Or For Women Only : As
The Case May Be.
(2) The Notice Shall Also Bear The Figures Of A Man Or Of A Women, As The Case May Be .
6. Urinals :ThereShall Be At Least One Urinal For Male/Female Workers Up To 50 Employed At A
Time . Provided That Where The Number Of Male Or Female Workmen, As The Case May Be,
Exceeds 500, It Shall Be Sufficient If There Is One Urinal For Every 50 Males Or Females Up To
The First 500 And One For Every 100 Males Or Females Or Part Thereof.
7. Latrines And Urinals To Be Accessible: (1) The Latrines And Urinals Shall Be Conveniently
Situated And Accessible To Workers At All Times At The Establishment. (2) (I ) The Latrines And
Urinals Shall Be Adequately Lighted And Shall Be Maintained In A Clean And Sanitary Condition
At All Times (Ii) Latrines And Urinals Other Than Those Connected With A Flush Sewage System
Shall Comply With The Requirements Of The Public Health Authorities.
Khambhat Nagar Palika Page
8. Water For Latrines And Urinals: Water Shall Be Provided By Means Of Pipes Or Tanks Or
Otherwise, So Also Be Conveniently Accessible In Or Near The Latrines And Urinals.
9. Bathing And Washing Places: (1) The Contractor Shall Construct Sufficient Number Of Bathing
Places. Every Unit Of 20 Persons Being Provided With A Separate Bathing Place. (2) Washing
Places Should Also Be Provided For The Purposes Of Washing Clothes. Every Unit Of 30 Persons
Shall Have At Least One Washing Place. (3) Such Bathing And Washing Places Should Be Suitably
Screened And Separate Places Provided For Male And Female Workers. (4) Such Facilities Shall
Be Conveniently Accessible And Shall Be Kept In Clean And Hygienic Condition.
10. Drainage: TheContractor Shall Make Sufficient Arrangement For Draining Away The Sewerage
Water As Well As Water From The Bathing And Washing Places And Shall Dispose Off This
Waste Water In Such As Way As Not To Cause Nuisance. The Contractor Should Obtain A
Permission From The Gujarat Water Pollution Control Board, Gandhinagar If Water Is So Be
Drained In River Or Near The Well . The Contractor Would Put Malaria Oil Once In A Week In
Stagnant Water Round About The Residence.
11. Medical Facilities: The Contractor Shall Engage A Medical Officer With A Traveling Dispensary
For A Camp Having 500 Or More Persons If There Is No KHAMBHAT Nagar PalikaOr Other
Private Dispensary Situated Within 6 Km. From The Camp.
12. Conservancy And Cleanliness: TheContractor Shall Provide The Necessary Staff For Effecting
The Satisfactory Conservancy And Cleanliness Of The Camp To The Satisfaction Of The Engineer-
In-Charge. At Least One Sweeper Per 200 Persons Should Be Engaged. Conservancy Staff Should
Dump Refuge In Compost Pit, Away From The Labour Camp.
13. Health Provisions:The District Health Officer Of The District Or The Deputy Director Of Health
Service Shall Be Consulted Before Opening A Labour Camp And His Instructions On Matters,
Such As The Water Supply, Sanitary Convenience, The Camp-Site, Accommodation And Food
Supply Shall Be Followed By The Contractor.
14. Precautions Against Epidemic: (A) The Authorities In Charge Of The Colonies Should Get The
Labourers Inoculated Against Cholera And Plague And Vaccinated Against Smallpox At The Time
Or Recruitment, If They Are Not Inoculated Or Vaccinated Within 6 Months Or 3 Years
Respectively Prior To The Date Of Recruitment. (B) When, In Any Labour Camp There Is An
Epidemic Disease Or Is Threatened With Such An Outbreak, The Authorities In Charge Of The
Labour Camps Should Ensure That All The Inmates Of The Labour Colonies Are Inoculated Or
Vaccinated As The Case May Be , Depending On The Diseases, Within 72 Hours After The
Outbreak. (C) The Authorities In Charge Of The Labour Colony Should Arrange To Communicate
By Wire Regarding The Outbreak Of The Epidemic Diseases On The Very Day Of The Outbreak,
To The Mamlatdar Of The Taluka, The District Health Officer Or To The Deputy Director Of
Khambhat Nagar Palika Page
Public Health In Charge Of That Area And The Director Of Public Health. Thereafter They Should
Continue To Send Daily Reports To The Above Officers In The Prescribed Form Regarding The
Progress Of The Epidemic Disease. (D) When The Authorities In Charge Of The Labour Colony
Suspect Or Have Reason To Believe That Any Immediate Of The Labour Colonies Is Suffering
From The Infectious Or Contagious Disease , They Shall Forthwith Arrange For The Segregation
Of Such Persons To Isolated Huts To Be Specifically Provided For The Purpose And Also For Their
Treatment (E) As Regional Malaria Epidemic Outbreaks Are Likely To Occur In Such Project
Areas, The Authorities In Charge Of The Labour Colonies Should Report Promptly The
Occurrence Of Unusual Incidence Of Cases Of Malaria And Also Inform The District Health
Officer Of The District, Deputy Director Of Public Healthy (Malaria) And The Director Of Public
Health And Also Arrange To Institute All Necessary Anti Malarial Measures As May Be Advised
By The Officials Of The Public Health Department. (F) The Authorities In Charge Of The Colonies
Should Also Arrange To Carry Out Any Other Measures That May Be Recommended By The
Officials Of The Public Health Department Necessary To Prevent Or Control The Spread Of
15. Rest Rooms: (1) In Every Place Where In Contract Labour Is Required To Halt At Night In
Connection With The Contract Works And In Which Employment Of Contract Labour Is Likely To
Continue For Three Month Or More, The Contractors Shall Provide And Maintain Rest Rooms Or
Other Suitable Alternative Accommodation Within Fifteen Days Of The Employment Of
Contract Labour.
(2) If The Amenity Referred To In Sub Rule Is Not Provided By The Contractor Within The Period
Prescribed, The Employer Shall Provide The Same Within A Period Of Fifteen Days Of The Expiry
Of The Period Laid Down In The Sub-Rule (1).
(3) Separate Rooms Shall Be Provided For Women Employees.
(4) Effective And Suitable Provision Shall Be Made In Every Room For Securing And Maintaining
Adequate Ventilation For The Circulation Of Fresh Air And There Shall Also Be Provided And
Maintained Sufficient And Suitable Natural Or Artificial Lighting.
(5) The Rest Room Or Other Suitable Alternative Accommodation Shall Be Of Such Dimensions As
To Provide At Least A Floor Area Of 1. Sq. Mt. For Each Person Making Use Of Rest Rooms.
(6) The Rest Room Or Other Suitable Alternative Accommodation Shall Be So Constructed As To
Afford Adequate Protection Against Heat, Wind, Rain, And Shall Have Smooth, Hard And
Impervious Surface.
(7) The Rest Rooms Or Other Suitable Alternative Accommodation Shall Be At A Convenient
Distance From The Establishment And Shall Have Adequate Supply Of Whole Some Drinking
16. CanteenFacilities: (1) In Every Establishment Of Contract Work And Wherein Work Regarding
The Employment Of Contract Labour Is Likely To Continue For Six Months And Wherein Contact
Labour Numbering One Hundred Or More Are Ordinarily Employed, The Adequate Canteen
Facilities Shall Be Provided By The Contractor For The Use Of Such Contract Labour Within Sixty
Days Of The Commencement Of The Employment Of Contract Labour.
(2) If The Contractor Fails To Provide The Canteen Facilities Within The Time Limit Laid Down The
Same Shall Be Provided By The Principal Employer Within Sixty Days Of The Time Allowed To
The Contractor.
Khambhat Nagar Palika Page
(3) The Canteen Shall Be Maintained By The Contractor Or Principal Employees As The Case May
Be In An Efficient Manner.
17. Accommodation In Canteen: (1) The Canteen Shall Consist Of At Least Dining Hall, Kitchen,
Store Room, Pantry, And Washing Places Separately For Worker And For Utensils.
2 (I) The Canteen Shall Be Sufficiently Lighted At All Times Where Any Person Has Access To It.
(Ii) The Floor Shall Be Made Of Smooth And Impervious Materials And Inside Walls Shall Be Lime-
Washed Or Color-Washed At Least Once In Each Year, Provided That The Inside Walls Of The
Kitchen Shall Be Lime-Washed Every Four Months.
3 (I) The Premises Of The Canteen Shall Be Maintained In Clean And Sanitary Condition.
(Ii) Waste Water Shall Be Carried Away In Suitable Covered Drains And Shall Not Be Allowed To
Accumulate So As Cause Nuisance.
(Iii) Suitable Arrangements Shall Be Made For The Collection And Disposal Of Garbage.
18. Accommodation In Dining Hall: (1) The Dining Hall Shall Accommodate At A Time, At Least 30%
Of The Contract Labour Working At A Time.
(2) The Floor Area Of The Dining Hall Excluding The Area Occupied Per Dinner To Be
Accommodated Shall As Prescribed In Sub Rule (I)
(3) (I) A Portion Of The Dining Hall And Service Counter Shall Be Partitioned And Reserved For
Women Workers, In Proportion To Their Numbers. (Ii) Washing Places For Women Shall Be
Separate And Screened To Secure Privacy.
(4) Sufficient Table, Stools, Chairs Or Benches Shall Be Available For The Number Of Diners To Be
Accommodated As Prescribed In Sub Rule
19. Equipment In Canteen:
(I) There Shall Be Provided And Maintained Sufficient Utensils, Crockery, Cutlery, Furniture And Any
Other Equipment Necessary For The Efficient Running Of The Canteen.
(Ii) The Furniture Utensils And Other Equipment Shall Be Maintained In A Clean And Hygienic
(2) (I) Suitable Clean Clothes For The Employees Serving In The Canteen Shall Also Be Provided And
(Ii) A Service Counter, If Provided, Shall Have A Top Of Smooth And Impervious Materials.
(Iii) Suitable Facilities Including An Adequate Supply Of Hot Water Shall Be Provided For The
Cleaning Of Utensils And Equipment.
20. Food Stuff To Be Served: TheFood Stuff And Other Items To Be Served In The Canteen Shall Be
In Conformity With The Normal Food Habits Of The Contract Labour.
21. Prices To Be Displayed: TheCharges For Food Stuffs, Beverages And Any Other Item Served In
The Canteen Shall Be Based On “No Profit, No Loss” And Shall Be Conspicuously Displayed In The
Khambhat Nagar Palika Page
22. Canteen To Be Run On “No Profit No Loss” Basis: In Deriving The Prices Of Food Stuffs And
Other Articles Served In The Canteen, The Following Items Shall Not Be Taken Into Consideration As
Expenditure, Namely.
(a) TheRent For The Land And Building.
(b) The Depreciation And Maintenance Charges For The Building And Equipment Provided For In
(c) The Cost Of Purchase, Repairs And Replacement Of Equipment Including Furniture, Crockery,
Cutlery And Utensils.
(d) The Water Charges And Other Charges Incurred For Lighting And Ventilation.
(e) The Interest On The Amount Spent On The Provisions And Maintenance Of Furniture And
Equipment Provided For In The Canteen.
The Local Officers Should Check Up Whether, Facilities As Offered And Which Are Admissible Under
The Existing Rules And Orders Are Made Available To The Workers And Enforce Upon The
Contractors The Necessity Of Adhering To The Instructions For Promotion Of Welfare Of The
Workers According To The Terms Of The Contract.
CLAUSE 51:ContractorShall Have To Arrange For The Supply Of Gumboots. Hand Gloves, Mask Etc.
Invariably To TheLabourers/Workers Engaged By The Contractor On Asphalt Work.
CLAUSE 52:The Contractor Shall Not Show Any Distinction Between Harijan And Other Class Of
Labourers / Workers Employed To Carry Out The KHAMBHAT Nagar PalikaWork.
CLAUSE 53: FENCING AND LIGHTING
(A) The Contractor Shall, Unless Otherwise Specified, Be Responsible For The Proper Fencing,
Lighting Guarding And Taking Of The Necessary Safety Measures For All Works Comprised In The
Contract And For The Proper Provision Of Temporary Road, Way, Foot-Way , Guards, Fences,
Caution Notices, Etc. As Far As The Same May Be Rendered Necessary By Reasons Of The Work For
The Accommodation Of Workmen, Foot Passengers Or Other Traffic And Of Owners And Occupiers
Of Adjacent Property And The Public And Shall Remain Responsible For Any Accident That May
Occur On Account Of His Failure To Take Proper & Timely Precautions.
(B) All The Arrangements Made For Fencing And Lighting Shall Be Maintained By The Contractor
Through The Currency Of The Contract Till The Physical Taking Over Of The Work By
CLAUSE 54: LIABILITY OF ACCIDENTS TO PERSONS:
Responsibilities And Liabilities LfThe Contractor Under Workmen’s Compensation Act Are Given In
Clause No.37. In Addition Following Shall Also Apply:
(a) On The Occurrence Of An Accident, Which Result In Death Of Workmen Employed By The
Contractor Or Which Is So Serious As Likely To Result In Death Of Any Such Workmen The
Contractor, Shall Within 24 Hours Of Happening Of Such Accident(S) Intimate, In Writing To
Engineer-In-Charge The Fact Of Such Accidents. The Contractor Shall Indemnity KHAMBHAT
Nagar PalikaAgainst All Loss Or Damage Sustained By The KHAMBHAT Nagar PalikaResulting
Directly Or Indirectly From His Failure To Give Intimation In The Manner Aforesaid Including
Khambhat Nagar Palika Page
The Penalties Or Fines, If Any, Payable By The KHAMBHAT Nagar PalikaAs A To The Provisions
Of The Said Act In Regard To Such Accident(S).
(b) In The Case Of An Accident, In Respect Of Which Compensation May Become Payable Under
Workmen’s Compensation Act. Whether By The Contractor Or By The KHAMBHAT Nagar
PalikaAs Principal Employer, It Shall Be Lawful For The Engineer-In-Charge To Retain Out Of
Money Due And Payable To The Contractor, Such Sum Or Sum Of Money As May, In The
Opinion Of The Engineer-In-Charge, Be Sufficient To Meet Such A Liability, The Opinion Of The
Engineer-In-Charge Shall Be Final Regard To All Matters Arising Under This Clause.
CLAUSE 55: ACCESS TO SITE AND WORK ON SITE:
The Engineer May , If He Considers Fit From Time To Time, Enter Upon Any Land(S) Which May Be
In Possession Of The Contractor Under This Contract For The Purpose Of Executing Any Work Not
Included In This Contract By Agents Or By Other Contractors, At This Opinion And The Contractor
Shall, In Accordance With The Requirements Of The Engineer-In –Charge , Afford All Reasonable
Facilities For Execution Of The Work Including Occupation Of Lands By Structure Or Otherwise For
Any Other Contractor Employed By The KHAMBHAT Nagar PalikaAnd His Workmen For The
Workmen Of The KHAMBHAT Nagar PalikaWho May Be Employed In The Execution On Or Near The
Site Of The Work Not Included In The Contract Or Of Any Contract In Connection With Or Ancillary
To The Work And In Default, The Contractor Shall Be Liable To The KHAMBHAT Nagar PalikaFor Any
Delay Or Expenses Incurred By Reason Of Such Default. Provided Always That If Damage Arising.
Make A Statement Of The Same To The Engineer-In-Charge Who Shall From Time To Time, Assess
The Value In His Judgment Of Such Damage And The KHAMBHAT Nagar PalikaShall From Time To
Time Pay To The Contractor The Amounts (If Any) Accepted As Justified By The Engineer-In-Charge :
CLAUSE 56: REPORTS REGARDING LABOUR:
The Contractor Shall Submit The Following Reports To The Engineer-In-Charge:
(a) (I) A Daily Report In The Suitable Form Of The Strength Of Labour, Both Skilled And Unskilled
Employed By Him On The Work(S). The Contractor Shall Increase Or Decrease The Strength
Both Skilled And Unskilled. If Directed By The Engineer-In-Charge. The Submission Of Such
Reports Shall Not, However , Relieve The Contractor Of His Responsibilities And Duties
Regarding Progress Or Any Other Obligation Under The Contract
(Ii) AClassified Weekly Return In The Suitable Form Of The Number Of Person Employed On The
Works During The Preceding Week.
(Iii) A Weekly Medical Report In The Suitable Form Showing The Health Of The Contractor’s
Camp. The Number Of Persons Ill Or Incapable And The Nature Of Their Illness.
(Iv) A Report Of Any Accident, Which May Have Occurred, To Be Sent Within 24 Hours Of The
(v) Such Other Report As May Be Prescribed.
CLAUSE 57: Treasure Trove
In The Event Of Discovery By The Contractor Or His Employees, During The Progress Of Work Of
Any Gold, Silver, Oil Or Other Minerals Of Any Description And Precious Stones , Treasures, Coins,
Antiquities, Relic, Fossils Or Other Articles Or Value Of Interest Whether Geological, Archaeological
Or Any Other Such Treasure & Other Things Shall Be Deemed To Be The Absolute Property Of The
Khambhat Nagar Palika Page
KHAMBHAT Nagar PalikaAnd The Contractor Shall Duly Preserve The Same To The Satisfaction Of
The Engineer-In-Charge , From Time To Time, And Relieve The Same To Such Persons As The
Engineer-In-Charge May Appoint.
The Contract Shall Take All Reasonable Precautions To Prevent His Workmen Other Person From
Removing Or Damaging Any Such Articles Or Things, Immediately After The Discovery Thereof And
Before Removal Acquaint The Engineer-In-Charge With Discovery And Carry Out His Orders For The
Disposal Of The Same.
CLAUSE 58 :Indemnity :
The Contractor Shall Indemnify TheKHAMBHAT Nagar PalikaAgainst All Actions, Suits, Claims &
Demands Through Or Made Against The Department In Respect Of Work Of This Contractor Against
Any Loss Damage To Department In Consequence Of Any Action Or Suit Being Brought Against The
Contractor For Anything Done Or Omitted To Be Done In Execution Of The Work Of This Contract.
CLAUSE 59: InsuranceOfLaborus:
The Contractor Shall Be Responsible To Arrange For Insurance Of All Laboures, Skilled And Unskilled
Workers, Supervisors Etc. Employed By Him As Per Labour Regulation Of The State.
CLAUSE 60: Setting Out:
The Contractor Shall Be Responsible For The True And Proper Setting Out Of The Works And The
Correctness Of Positions, Levels, Dimensions And Alignments Of All Parts Of The Work And For The
Provisions Of All Necessary Instruments, Appliance And Labour In Connection Therewith. If , At Any
Time During The Progress Of The Work, Any Errors, Appear Or Arise In The Position , Levels,
Dimensions Or Alignments Of Any Part Of The Work, The Contractor, On Being Required To Rectify
Such Errors By The Engineer-In-Charge Shall At His Own Expense Do So To The Satisfaction Of The
Engineer-In-Charge . If However, Such Error Is Based On Incorrect Data Supplied In Writing By The
Engineer-In-Charge , The Expenses Of Rectifying The Same Shall Be Borne By The Department. The
Checking Of And Setting Out Of Any Line Or Level By The Engineer-In-Charge Or His Representative
Shall Not In Any Way, Relieve The Contractor Of His Responsibilities For The Correctness Of The
Error. The Contractor Shall Carefully Protect And Observe All Bench-Mark, Site-Nails, Page And
Other Things Used In Setting Out Of The Work(S)/
CLAUSE 61: Cement Register:
A Register In The Prescribed Form Showing Day-To-Day Receipt, Consumption And Balance Of
Cement On Site Of Work Will Be Maintained By The Department, Which Shall Invariably Be Signed
Daily By The Contractor Or His Authorized Representative In Token Of Its Correctness.
CLAUSE 62: Materials AndWorks Test Register:
A Register In The Prescribed From Showing Day-To-Day Receipt, Consumption And Balance Of
Cement On Site Of Work By The Department And Every Entry Thereof Shall Invariably Be Signed By
The Contractor Or His Authorized Representative In Taken Of Its Correctness.
CLAUSE 63: Progress Schedule:
(A) The Contractor Shall Furnish Within One Month (Unless Extended By The Engineer-In-Charge)
Of The Order To Start The Work, The Progress Schedule In Quadruplicate Indicating The Date Or
Staring. The Monthly Progress Expected To Be Achieved And The Anticipated Completion Date Of
Khambhat Nagar Palika Page
Each Major Item Of Work To Be Done By Him, Also Indicating Dates Of, Procurement And Setting
Up The Materials, Plants And Machinery. The Schedule Should Include A Statement Of Proposed
General And Detailed Arrangements For Carrying Out Works, And Of Item , Order And Manner In
Such It Is Proposed General And Detailed Arrangements For Caring Out Works, And Of Item, Order
And Manner In Which It Is Proposed That These Shall Be Executed. The Practice To The
Achievement Towards Completion Of The Work In The Time Limit And Of The Particular Items On
The Dates Specified In The Contract And Shall Have The Approval Of The Engineer-In-Charge.
Further The Dates For The Progress, As In This Schedule Shall Be Adhered To.
(a) In Case It Is Sound Necessary, At Any Stage To Alter The Schedule. TheContractor Shall Submit
In Good, Time A Revised Schedule Incorporating Necessary Modification Proposed And Get The
Same Approved From The Engineer-In-Charge. No Revised Schedule Shall Be Operative Without
Such Acceptance In Writing. The Engineer-In-Charge Is Further Empowered to Ask for More
Detailed Schedule Or Schedule. Any By Week, For Any Item or Items and The Contractor Shall
Supply The Same As And When Asked For.
(b) The Engineer-In-Charge Shall Have, At All Times, The Right, Without in Any Way Vitiating This
Contract Forming Groundsfor Any Claim, To After The Order Of The Work Of Any Part Thereof
And The Contractor Shall After Receiving Such Direction, Proceed In The Order Directed. The
Contractor Shall Also Revise the Progress. Schedules Accordingly and Submit Four Copies Of The
Revised Schedule To The Engineer-In-Charge Within Seven Days Of The Said Engineer's
Direction To Alter The Order Of Works.
(c) The Contractor Shall Furnish Sufficient Plant, Equipment and Labour And Shall Work Such Hours
And Shifts As May Be Necessary To Maintain The Progress Of The Work As Per Approved
Progress-Schedule, The Working And Shift Shall Company With All The KHAMBHAT Nagar
PalikaRegulations In Force And Shall Be Such, As May Be Approved By The Engineer-In-Charge
And The Same Not Be Varied Without The Prior Approval Of Engineer-In-Charge.
(d) The Contractor Shall from Time To Time, As May Be Required By The Engineer-In-Charge,
Furnish To Engineer-In-Charge With A Statement In Writing Of The Arrangements He Proposes
To Adopt For The Execution Of This Contract And The Engineer-In-Charge May, If He Considers
Necessary At Any Time Advice Alternation In The Same. WhichThe Contractor Shall Adopt On
Notice Thereof.
(e) The Progress-Schedule(S) Shall Be In The Form Of Progress Chart, Forms, Statements And/ Or
Reports As May Be Approved By The Engineer-In-Charge.
The Contractor Shall Submit Four Copies Showing The Progress Of The Work In The Form Of A
Chart Etc. At Periodical Intervals As May Be Specified By Engineer-In-Charge.
(f) The Approval Of The Progress Schedules By The Engineer-In-Charge Shall Not Relieve The
Contractor Of Schedule Required By The Engineer-In-Charge And Shall Not Entitle The
Contractor To Any Extra Payment.
Before Starting The Work, The Contractor Will Have To Obtain The License From The District
Assistant Labour Commissioner Under The Contract Labour(Regulation And Abolition) Act.
And Contract Labour(Regulation And Abolition ) Gujarat Rules 1972 After Paying Necessary Fees
And Deposit On The Basis Of The Number Of Labourers To Be Employed On The Work And Will
Have To Supply Two True Copies Of The Said License To The Deputy Chief OfficerBefore The Work
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
Annexure: The Information In The Following Annexure Specimens Should Be Furnished On Separate
Letter Pad Necessary.
(Referred To Condition No.-2 General Rules And Direction For The Guidance Of Contractors. )
The Chief Officer,
KHAMBHAT Nagar Palika,
KHAMBHAT, Dist. ANAND.
PLACE: KHAMBHAT DATE:
Details Regarding My / Our Partners Our Company (In the Case of Limited Company Names,
Address (Es), Telephone Number(S) Income Tax Etc. Are As Under:
Sr. No. Name(S) Of Full Address Telephone Residential Telephone Full Address of
Person/ of The Place No.(S) Address (Es) No.(S) Income Tax
Partner Of Business (Office) (Resi.) (Supported Office Ward
Director of (With Pin (Supported (Supported Document) Where Income
The Company Code) Document) Document) Tax Return Is
(Supported (Supported Filed (Supported
Document) Document) Document)
I/We Hereby Agree To Intimate You About Change If Any, In The Above-Mentioned Address (Es)
And Telephone No. (S) Within Fifteen Days Of Its Occurrence Till My/Our Deposit, For The Said
Work Paid By Me/Us Is Not Returned To Me/Us.
Dated SignatureOfTenderer
Khambhat Nagar Palika Page
LIST OF WORKS ALREADY COMPLETED BY THE TENDERER
Sr. Name Of Work Place Cost On Time Taken In Remarks
Completio Months To
No. n Complete The
Note: Necessary Certificate From Office Concerned Shall Be Attached With The Tender
Khambhat Nagar Palika Page
DECLARATION REGARDIG WORKS ON HAND WITH TENDERER
Sr. Name Place Estimated Date Of Stipulated Amount Of Brief Details Remark
No. Of Cost Issue of Period of Work Done on of Delay If
Work Work Order Completio Date of Filling Any
Note 1 :Amount Of Work In Column 6 Should Be Given Up To The Month Previous To The Month In
Which Tenders Are Invited.
Note 2 :Necessary Certificate From The Officer Concerned Shall Be Attached With The Tender.
Khambhat Nagar Palika Page
CURRICULUM VITAE OF PROJECT MANAGER &ALL KEY TECHNICAL Personnel
WITH ATTACHED CERTIFICATE
Name Of Applicant
Proposed Position: Candidate
Prime Alternate
Candidate 1. Name of Candidate 2. Date Of Birth
3. Professional Qualifications:
Present 4. Name of Employer
Address Of Employer:
Telephone: Contact (Manager / Personnel
Facsimile: Telex:
Job Title Of Candidate: Years With Present Employer:
Summarize Professional Experience Over the Last ___ Years, In Reverse
Chronological Order. Indicate Particular Technical and Managerial Experience Relevant
to This Project.
From To Company / Project / Position / Description of Relevant Technical &
Managerial Project Specific Experience
Khambhat Nagar Palika Page
DETAILS OF MACHINERY EQUIPMENTS AND WORK PLAN
Plant &Equipments Owned &Proposed For The Project
The Applicant Will Provide Adequate Information To Demonstrate Clearly That It Has The
Capability To Meet The Requirements For Each And All Items Of Equipment Listed In The
Employers Requirements. A Separate Form-3 Will Be Prepared For Each Item Of Equipment
Proposed By The Applicant. For Each Item Of Equipment, The Applicant Should Attach A Copy
Of Ownership Certificate Or Lease Agreement.
Name Of Equipment
Equipment 1. Name Of Manufacturer 2. Model And Power Rating
3. Capacity 4. Year Of Manufacture
Current 5. Current Location
6. Details Of Current Commitments
Source 7. Indicate Source Of The Equipment
OwnedRentedLeasedSpecially Manufactured
Owner 8. Name Of Owner
9. Address Of Owner
Telephone Contact Name And Title
Facsimile Telex
Agreements Details Of Rental / Lease / Manufacture Agreements Specific To The
Khambhat Nagar Palika Page
(Give Details Separately For Each Member In Case Of A Joint Venture.)
1) Name Of Firm
2) Name Of Partner / Director
(b) Issued And Paid Up
4) Furnish Balance Sheet And Profit And Loss
Statement With Auditor’s Reports And Income
Tax Assessment Orders For Last Three (3)
Financial Years. It Should, Interlaid Include
The Following Information
i) Working Capital
ii) Foreign Investment
iii) Turnover For The Last Three (3) Financial
Year, The Contract Receipts For Civil
Engineering Works (Furnish Reference
Page Number To Balance Sheet Attached)
Reference Page No. To Balance Sheet
No. Year Turnover
(Rs In Crores) Or Other Documents
GROSS INCOME IN THE LAST THREE(3) FINANCIAL YEAR
Sr. Gross Income Reference Page No. To Balance Sheet
No. Year (Rs In Crores) Or Other Documents
6. Maximum Gross Income From Contract
Works During Last Three(3) Financial
Khambhat Nagar Palika Page
7. What Is The Maximum Cost Of The
Project That Has Been Handled? (Please
8. Have You Ever Been Denied Tendering
Facilities By Any Government /
Government Undertaking Organisations /
Public Sector Under Taking Etc.? (If Yes,
Please Give Details)
9. List Your Sources Of Finance
10 Amount Of Financial Soundness Certified
ByBank. (Attach Copy Of Certificate)
11. Name And Address OfBank From Whom
Reference Can Be Obtained
12. Have You Ever Been Declared Bankrupt?
(If Yes, Please Give Details)
Note: Firms Owned By Individuals, And Partnerships, May Submit Their Balance
Sheets Certified By A Registered Accountant, And Supported By Copies Of Tax
SIGNATURE OF BIDDER
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
11 SCHEDULE - C
(SeeClause No. -2 )
Time Schedule, For Completion Of Different Designated Parts Of The Work And Rate Of
Liquidated To Be Paid By The
Contractor, If He Fails To Complete The Part Of Work Within Stipulated Time Limit Is As Detailed
Time Schedule Of Completion
Percentage Of Time Of The Percentage Of Work Rate Of Liquidated Damages
(As Corrected Vied B &CD GR. No. TNC - 1091 - IB - 10/(11) - C , Dated 29-6-92)
Signature Of The Contractor
Khambhat Nagar Palika Page
Khambhat Nagar Palika Page
12 SCHEDULE – B
Khambhat Nagar Palika
Name Of Work: CONSTRUCTION WORK OF DRAINAGE LINE AND WATER PIPELINE IN
NAGARPALIKA VARIOUS AREA @ KHAMBHAT NAGARPALIKA, KHAMBHAT
DIST. ANAND (2ND ATTEMPT)
SCHEME : 15% VIVEKADHIN GRANT (2024-25)
Khambhat Nagarpalika
15% Vivekadhin Grant (2024-25)
Sr. No Name of Work Amount
1 Providing and laying Water pipe line at Baraiyavas Vachalu Fadiu
Rameshbhai Ambalal na House thi Babubhai Thakorbhai na Ghar sudhi
2 Providing and laying pipe line Panchvati Circle pase na Pumping Station
thi Hirapara java na Garnala Rasta sudhi
3 Construction Work Of Drainage Pipe Line From Lal darvaja police chowki
to new sargam nasta house
SB-1 (Providing and laying Water pipe line at Baraiyavas Vachalu Fadiu
Rameshbhai Ambalal na House thi Babubhai Thakorbhai na Ghar sudhi)
Qty DESCRIPTION OF ITEM RATE Unit Amount
Demolition including stacking of serviceable materilas
1 4.00 and disposal of unserviceable materials with all lead 1030.81 Cmt
and lift. (i) R.C.C. work
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter
lead.(A) Loose or soft soil
Providing and casting in situ mass cement concrete in
grade M-10 (approx. corresp. to prop. 1:3:6) using
3 4.00 granite quartzite trap metal of size 12 mm to 25 mm 4211.30 Cmt
incl. consolidation curing etc. complete.
Providing and supplying in standard length !S! mark
rigid unplasticised PVC pipes suitable for potable
water with ring fit joint including cost of rings, as per
60.00 IS specification no. 4985/1988 including all local and
Khambhat Nagar Palika Page
central taxes, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
the deparimenta! stores and including cost of jointing
meterial etc. complete. Test Pressure 10 Kg/cm’. 2)
Lowering, laying, fixing and jointing PVC/uPVC/cPVC
pipes and specials of following class and diameter
including cost of conveyance from stores to site of
works including cost of labour, material, cement
solvent, giving satisfactory hydraulic testing as per ISI
60.00 code( 75mm) Test Pressure 10 Kg/cm’. 2) 75mm
PVC fittings: 9 Providing and supplying at store or site
6 of work incl. freight, loading, unloading, stacking,
insaurance & all taxes etc. complete.
1.00 PVC TEE (Moulded) 11. 160mmx110mm 985.55 No
1.00 PVC Reducer (Moulded) 8. 110mmx75mm 209.30 No
3.00 PVC Bend 90 degree (Moulded ) Heavy 3. 75mm 200.10 No
Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers
7 not exceeding 20 cm. in depth consolidating each 130.39 Cmt
disposited layer by ramming and watering.
Providing and laying Nominal cement concrete M.200
(1:1.5:3) and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work including prepairing sub base by Providing &
Laying M.S. Side rail of road thickness with necessry
nut bolt plates, fixing as per width applaying plates
8 vibrator, electric or diesel on channel comp. with V.D. 5890.32 Cu.M
Systems (Trimix) by using the necessary equipments
material & Machinery, such as running screed
vibrator on prelaid M.S. channel for leveling vaccum
pumps, floating & power trowling etc. compl. also
including groov cutting and filling joint with
4.00 bituminous every 5 mtr. (including hardner)
Add 18.00 % GST
SB-2 (Providing and laying pipe line Panchvati Circle pase na Pumping Station thi
Hirapara java na Garnala Rasta sudhi)
Qty DESCRIPTION OF ITEM RATE Unit Amount
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter
lead.(A) Loose or soft soil
Khambhat Nagar Palika Page
Providing and supplying in standard length !S! mark
rigid unplasticised PVC pipes suitable for potable
water with ring fit joint including cost of rings, as per
IS specification no. 4985/1988 including all local and
central taxes, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
the deparimenta! stores and including cost of jointing
meterial etc. complete.
1240.00 Test Pressure 10 Kg/cm’. 3) 90mm 335.80 Rmt
2.00 Test Pressure 10 Kg/cm’. 3) 110mm 504.85 Rmt
Lowering, laying, fixing and jointing PVC/uPVC/cPVC
pipes and specials of following class and diameter
including cost of conveyance from stores to site of
works including cost of labour, material, cement
solvent, giving satisfactory hydraulic testing as per ISI
1240.00 Test Pressure 10 Kg/cm’. 3) 90mm 19.55 Rmt
2.00 Test Pressure 10 Kg/cm’. 3) 110mm 21.85 Rmt
PVC fittings: 9 Providing and supplying at store or site
4 of work incl. freight, loading, unloading, stacking,
insaurance & all taxes etc. complete.
1.00 PVC TEE (Moulded) 11. 160mmx110mm 985.55 No
1.00 PVC TEE (Moulded) 08. 110mm X 90mm 540.50 No
3.00 PVC Bend 90 degree (Moulded ) Heavy 3. 90mm 365.70 No
Manufacture, supply and delivery of cast iron
Detachable joints (Short & ong) complete with joint
flanges duly drilled,synthetic rubber sealing rings
manufactured from styrene butadine rubber (SBR)
and other required accessories suchas nut, bolts etc.
5 conforming to IS specification 8794-1988 or its latest
revision if any suitable for use with A.C.Pressure
pipes. Delivery of joints including its accessories
including loading, unloading, carting, stacking,
insurance, alltaxes, octroi etc. complete.12.6 long
Collar Over Size Suitable to PVC/HDPE 10kg/cm2
Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers
6 not exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering.
885.50 Total Rate 130.39 Cmt
Add 18.00 % GST
Khambhat Nagar Palika Page
SB-3 (Construction Work Of Drainage Pipe Line From Lal darvaja police chowki to
new sargam nasta house)
Qty DESCRIPTION OF ITEM RATE Unit Amount
Excavation for foundation upto 1.5 m depth including
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter
lead.(A) Loose or soft soil
Excavation for foundation for depth from 1.5 m to
2 63.00 m including sorting out and stacking of useful 129.81 Cu.m
materials and disposing off the excavated stuff upto
50 Meter lead.(A) Loose or soft soil
Providing and casting in situ mass cement concrete in
grade M-10 (approx. corresp. to prop. 1:3:6) using
3 10.00 granite quartzite trap metal of size 12 mm to 25 mm 4211.30 Cu.m
incl. consolidation curing etc. complete.
Providing and supplying ISI Standard R.C.C. pipes(of
Sulphate Resisting Cement) in standard lengths of
following class and diameter suitable for either collar
joints or rubber ring joints including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
4 40.00 departmental stores, stacking etc. complete. (IS - 868.25 Rmt
458/ 1989 ( Class NP3 Test Pressure 0.7 Kg/sq.cm
mm Dia.)Note : One collar should be supplied with
each full length plain ended RCC pipe, cost included in
rates below. One rubber ring should be supplied with
each full length socketed pipe, cost included in rates
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1
1/2 of following diameters in proper position, grade
and alignment at all level as directed by Engineer-in-
charge including conveyance from stores to site of
work, labour, giving hydraulic testing as per ISI code
(NP-3 300mm Dia. Pipe)
Providing and constructing Sewer manholes, scraper
manholes and unit house connection chamber, as per
the type design in brick masonry in C. M. 1:5 and
inside and outside 20mm thick plastering in C. M. 1:3
necessary 100 mm coping with reinforcement in
R.C.C.M. 200 fixing C. I. steps and fixing manhole
frame and covers (But excluding supply of manhole
frame and covers) over manholes and house
connection chambers and fixing Manhole covers (but
excluding supplying of manhole covers) over scraper
manhole etc. complete, providing and fixing safety
chain wherever necessary as per the stipulations in
the type design complete as per latest CPHEEO
manual. (excl. excavation).B. Manhole type "B"
Khambhat Nagar Palika Page
Circular type having inside diameter of Minimum
mm and for depth 1.5m to 4.0m (for 150 mm to
1.00 Extra depth beyond 1.5 M and up to 4.0 M depth for 14159.95 Rmt
type "B" Manhole above.
RCC precast M.H. Frame & Cover Manufacture, supply
& Delivery at store or at site of work precast RCC
M.200 Frame & cover suitable to drainage M.H. and
7 as per type design & Drawing including cost of
reinforcement M.S. Angles or Flat, curing mold work
a 1.00 Frame suitable for 50cm opening of MH 1289.15 No
b 1.00 Cover suitable for 50cm opening of MH 1348.95 No
Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers
8 not exceeding 20 cm. in depth consolidating each 130.39 No
disposited layer by ramming and watering.
Providing and laying Nominal cement concrete M.200
(1:1.5:3) and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work including prepairing sub base by Providing &
Laying M.S. Side rail of road thickness with necessry
nut bolt plates, fixing as per width applaying plates
vibrator, electric or diesel on channel comp. with V.D.
9 Systems (Trimix) by using the necessary equipments 7 5890.32 Cu.M
material & Machinery, such as running screed
vibrator on prelaid M.S. channel for leveling vaccum
pumps, floating & power trowling etc. compl. also
including groov cutting and filling joint with
bituminous every 5 mtr. (including hardner)
Add 18.00 % GST
Engineer Chief Officer President
Stamp with Signature of
Khambhat Nagar Palika Khambhat Nagar Palika Khambhat Nagar Palika
Khambhat Khambhat Khambhat
Khambhat Nagar Palika Page
KHAMBHAT Nagar Palika
Name Of Work: CONSTRUCTION WORK OF DRAINAGE LINE AND WATER PIPELINE IN
NAGARPALIKA VARIOUS AREA @ KHAMBHAT NAGARPALIKA, KHAMBHAT
DIST. ANAND (2ND ATTEMPT)
SCHEME : 15% VIVEKADHIN GRANT (2024-25)
I/WeAm/ Are Willing To Carry Out To Work @ _____________ % Above /Below ____________
Percentage (Should Be Written In Figures And Words) Of The Estimated Rates Mentioned Above
Amount Of My/ Our Tender Work Out As Under.
Estimated Amount Estimated Amount
Put on Tender Rs. 1109816.00 Put onTender Rs.
Add % Rs Deduct % Rs.
Total Rs. Total Rs.
(In Words (In Words
Engineer Chief Officer President
Stamp with Signature of
Khambhat Nagar Palika Khambhat Nagar Palika Khambhat Nagar Palika
Khambhat Khambhat Khambhat
Khambhat Nagar Palika Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Doc.pdf
Road Work Booklet.pdf
Download all tender documents and submit your bid