Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
1 Dec 2026, 1:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE-WS(W)
KMC, 212, Rashbehari Avenue, Kolkata -700019
RESTORATION OF F.W SUPPLY BY REPAIRING OF DAMAGED, CHOKED F.W S/MAINS ALONG WITH OTHER ALLIED WORKS NEAR 160D, 161C, KANKULIA ROAD, 23, 22, 21 PANCHANANTALA ROAD AND ITS SURROUNDING AREAS IN WARD NO. 90.
2026_KMC_1048529_1
KMC/WS/West/W90/T-04/2026-27
Open Tender
CIVIL WORKS
Percentage
21 days
NEAR 160D, 161C, KANKULIA ROAD, 23, 22, 21 PANCHAN
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,800
Yes
4 Nov 2026
4 Nov 2026
3 Dec 2026
4 Nov 2026
1 Dec 2026
5 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 173.4 | %M3 | 119.27 | ₹20,681.42 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.2 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work.(a) With earth obtained from excavation of foundation | 173.4 | %M3 | 77.54 | ₹13,445.44 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 51.53 | M3 | 636 | ₹32,769.9 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.4 Excavation of trial pit (3.0 m x 1.0 m x (upto) 3.0 m) for fixing of pumping main, washout line raking every detection against damage of S.W. pipe line electrical cable etc. as underground obstruction including 37.5 mm timber shuttering, earth cutting, dewatering, barricading and back filling etc. as per directionj of E-I-C | 1 | EA | 1,867 | ₹1,867 |
| 5 | PLUMBING WORKS (A)-(II) G.I. PIPE WORKS AND FITTINGS 2. Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ii) 20 mm dia. medium quality | 65 | MTR | 240 | ₹15,600 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.8 Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptusor other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately. a) 75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart (i) Railing with 4 rows. | 154 | MTR | 57 | ₹8,778 |
| 7 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.28Hire charges of lighting generator of capacity 5KVA including fuel, mobil, operator, carriage etc. including all complete for water supply works. For minimum engagement of 8 hrs. In a day | 2 | DAY | 1,650 | ₹3,300 |
| 8 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. III. EVENT MANAGEMENT : 18) Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15mx100mmx100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap around the post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of the Engineer-in-charge.Payment of concrete and painting to be made separately. (ii) 900 mm. x 600 mm. size of board. | 2 | EA | 813 | ₹1,626 |
| 9 | CHAPTER - VIII SUPPLYING OF MATERIALS 8.5 Supply of Single/Double bit SBR gasket suitable for jointing CI/DI pressure pipes, conforming to IS : 5382 : 1985 [Popularly known as `Tyton Gasket...]150mm dia | 8 | EA | 50 | ₹400 |
| 10 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.5 Rubber gasket joints to C.l./D.l. pipes and specials all complete to makesthe joint water tight as required hydraulic pressure as per specification and direction of the Engineer-in-Charge.[Cost of Rubber. gasket of approved make induding supply to any pointwithin the Kolkata Municipal Area shall be paid separately.}Diameter in mm 150mm dia. | 8 | EA | 67 | ₹536 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
tbid.pdf
Tender Documents • 0.95 MB
BOQ_2567214.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .