| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹1.8 Cr+₹5.8 L (3.26%)Rejected-Finance OORAKAM VENKULAM BERUVALLUR GRAMA KERALA KL | ERNAKULAM | KERALA | 680667 | ₹1.8 Cr+₹5.8 L (3.26%) | L2 | Rejected-Finance Second Lowest |
| 3 | Rejected-Technical STAR NAGAR THEKKIL FERRY BEVINJE KASARAGOD 671541 | KASARAGOD | KASARAGOD | KERALA | 671541 | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L5 |
| 5 | Rejected-Technical KUNNUMMAL HOUSE CHUZHALI MOONNIYOOR SOUTH PO 676311 | MALAPPURAM | KERALA | 676311 | - | - | Rejected-Technical L4 |
Tender Value
₹2.1 Cr
EMD Value
₹1 L
Closing Date
11 Sept 2023, 6:00 pmClosed
Superintending Engineer,Harbour Engineering Dept
O/o Office of the Superintending Engineer Harbour Engineering NORTH CIRCLE, Kozhikode
GENERAL UCR Improvements To Naduvilangadi Porur V Mohammed Hamsa Road Tirur Municipality -UCR Improvements To Naduvilangadi Porur V Mohammed Hamsa Road Tirur Municipality General Civil Work
2023_HED_598965_1
HED/CEHED/TR/5/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
Tirur Municipality
Please refer Tender documents.
11 documents required · 11 mandatory
₹8,270
Yes
₹1 L
Yes
30 Oct 2023
26 Aug 2023
13 Sept 2023
26 Aug 2023
11 Sept 2023
26 Aug 2023
Amount
3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
11.4.5:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>V. R.C.C. grade M 25
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
BM & BC
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
OD2094/2022-2023:Filling with Quarry Muck Filling up low lying and water logged areas with quarry muck, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller etc complete for improving the CBR value of subgrade
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
P MOHAMMED
CM ASHARAF
HYDROS
HAFIS MOHAMMED SAHAB
Bidder Name
P MOHAMMED
CM ASHARAF
HYDROS
HAFIS MOHAMMED SAHAB
sajid pakkada
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_889324.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .